ML101660672
| ML101660672 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 06/07/2010 |
| From: | Ohmstede G Southern Nuclear Operating Co |
| To: | Bates M NRC/RGN-II |
| References | |
| Download: ML101660672 (6) | |
Text
Southern Nuclear Operating Company, Inc.
Post Office Drawer 470 Ashford. Alabama 36312 Tel 334.899.5156 Fax 334.814.4661 May 3, 2010 Mr. Mark Bates U.S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257
Dear Mr. Bates:
FNP-2010-0031-TRN SOUTHERN'\\
COMPANY Energy to Sel've Your World'"
You will find enclosed the exam material as required by NUREG 1021, "Operator Licensing Examination Standards for Power Reactors", Revision 9, supplement 1.
Enclosed you will fmd the completed paperwork listed below for the examination given the weekes) of April 5 - 13,2010 at Farley Nuclear Plant.
eES-201-3, Examination Security agreement (2 pages)
If you have any questions, please contact Gary Ohmstede at (334) 899-5156, extension 6111.
Sincerely,
Enclosure:
GTO cc:
File Southern Nuclear Operating Companv. Inc.
Post Office Drawer 470 Ashford. Alabama 36312 Tel 334899.5156 Fax 334,814.4661 May 3, 2010 Mr. Mark Bates U.S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257
Dear Mr. Bates:
FNP-2010-0031-TRN SOUYHERN'\\
COMPANY Energy 10 Suve Your World You will find enclosed the exam material as required by NUREG 1021, "Operator Licensing Examination Standards for Power Reactors", Revision 9, supplement 1.
Enclosed you will find the completed paperwork listed below for the examination given the week(s) of April 5 - 13,2010 at Farley Nuclear Plant.
- ES-201-3, Examination Security agreement (2 pages)
Jfyou have any questions, please contact Gary Ohmstede at (334) 899-5156, extension 6111.
Sincerely,
Enclosure:
GTO cc:
File
Southern Nuclear Operating Company, Inc.
Post Office Drawer 470 Ashford. Alabama 36312 Tel 334.899.5156 Fax 334.814.4661 04/20/2010 Mr. Mark Bates United States Nuclear Regulatory Commission, Region n 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257
Dear Mr. Bates:
FNP-20 1 0-0022-TRN SOUI HERN'\\
COMPANY Energy to Serve Your World.... '
Enclosed is our Post-Written Examination submittal of examination grade sheets, post-exam comments, and other material. The ES-201 Form, Examination Security Agreement, is in the process of being signed off as personnel become available. The ES-201 Form will be sent at a later date as soon as all required signatures are obtained.
Enclosed you will find the following forms and materials for the NRC Written examination administered on 04-13-2010 at Farley Nuclear Plant.
- 1) Six exam answer sheets: 5 SRO and 1 RO for electronic scanning in LXR software (scantron sheets) and copies of the same.
- 2) 6 Exam cover sheets signed by Applicants.
- 3) 2 Preliminary grade Detailed reports.
- 5) Written Exam seating chart.
- 6) 2 questions asked by applicants during exam with answers given.
- 7) Question 43 paperwork for consideration to be deleted. (7 pages)
- 8) Question 68 paperwork for consideration to accepted two answers as correct. (49 pages)
- 9) Student comments on other questions.
This material should be withheld from public disclosure until after the examination grading is complete.
If you have any questions, please contact Gary Ohmstede at (334) 899-5156 Extensio.n 6111.
Enclosure GTO cc:
File Sincerely, T.Ohmstede d Instructor-Exam Development Southern Nuclear Operating Company, Inc.
Post Office Drawer 470 Ashford. Alabama 36312 feI334899.5156 faK 334.814.4661 0412012010 Mr. Mark Bates United States Nuclear Regulatory Commission, Region IT 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257
Dear Mr. Bates:
FNP-2010-0022-TRN SOUTHERN'\\
COMPANY Enl!rgy to SUI! YO'lr World Enclosed is our Post-Written Examination submittal of examination grade sheets, post*exam comments, and other material. The ES-201 Form, Examination Security Agreement, is in the process of being signed off as personnel become available. The £S-20 1 Form will be sent at a later date as soon as all required signatures are obtained.
Enclosed you will find the following forms and materials for the NRC Written examination administered on 04-13-2010 al Farley Nuclear Plant.
)
Six exam answer sheets: 5 SRO and 1 RO for electronic scanning in LXR software (scantron sheets) and copies of the same.
- 2) 6 Exam cover sheets signed by Applicants.
- 3) 2 Preliminary grade Detailed reports.
- 5) Written Exam seating chart.
- 6) 2 questions asked by applicants during exam with answers given.
- 7) Question 43 paperwork for consideration to be deleted. (7 pages)
- 8) Question 68 paperwork for consideration to accepted two answers as correct. (49 pages)
- 9) Student comments on other questions.
This material should be withheld from public disclosure until after the examination grading is complete.
If you have any questions. please contact Gary Ohmstede at (334) 899-5156 ElCtension 61 11.
Enclosure GTO cc; File Sincerely, T. Ohmstede d Instructor-Exam Development
Southern Nuclear Operating Company. Inc.
Post Office Drawer 470 Ashford. Alabama 36312 Tel 334.899.5156 Fax 334.814.4661 March 25, 2010 Mr. Mark Bates United States Nuclear Regulatory Commission Sam Nunn Atlanta Federal Center 61 Forsyth Street SW, Suite 23T85 Atlanta, Georgia 30303-8931
Dear Mr. Bates:
FNP-2010-0018-TRN SOUTHERN A COMPANY Energy to Serve Your World""
You will find enclosed the exam material as required by NUREG 1021, "Operator Licensing Examination Standards for Power Reactors", Revision 9, supplement 1. All exam materials MUST be withheld from public disclosure until after the examinations are complete.
Enclosed you will find the printed paperwork listed below for the upcoming examination scheduled for the week of April 5, 2010 at Farley Nuclear Plant.
-ES-201-2, Examination Outline Quality Checklist (1 page)
-ES-301-1, Administrative Topics Outline (1 page)
-ES-301-2, Control RoomlIn-Plant Systems Outline (1 page)
-ES-301-3, Operating Test Quality Checklist (1 page)
- ES-301-4, Simulator Scenario Quality Checklist (1 pages)
-ES-301-5, Transient and Event Checklist (2 pages)
-ES-301-6, Competencies Checklist (2 pages)
-ES-401-4, Record of Rejected KlAs (2 pages)
- ES-40 1-6, Written Exam Quality Checklist (1 page)
-ES-D-1, Scenario 1 Outline (6 pages)
-ES-D-1, Scenario 3 Outline (5 pages)
-ES-D-1, Scenario 4 Outline (6 pages)
-ES-D-1, Scenario 5 Outline (5 pages)
In addition to the above printed material, there is one USB password protected SanDisk drive provided with more extensive documentation of the examination that includes the above material as well as material used to develop the printed information. All of this is provided to ensure complete and proper documentation for the up coming examination. The enclosed USB password protected SanDisk drive contains the following:
- Final written exam to be given with cover sheet and references for both the RO and SROexam.
- Examiner Scenario outlines for 4 Simulator exams.
-The Control RoomlIn-Plant Systems portion of the exam with supporting documents. (11 Control RoomlIn-Plant JPMs)
- The Administrative Topics portion of the exam with supporting documents. (6 AdminJPMs)
Southern Nuclear Operatinll Company, Illc.
Post Office Drawer 470 Ashford. Alabama 36312 Tel 334.899.5t56 Fat 334.814.4661 March 25, 2010 Mr. Mark Bates United States Nuclear Regulatory Commission Sam Nwm Atlanta Federal Center 61 Forsyth Street SW, Suite 23T85 Atlanta, Georgia 30303-8931
Dear Mr. Bates:
FNP-2010-0018-TRN SOUTHERN'\\
COMPANY E'llrgyloS~,.,,~ Your World '
You will find enclosed the exam material as required by NUREG 1021, "Operator Licensing Examination Standards for Power Reactors", Revision 9, supplement 1. All exam materials MUST be withheld from public disclosure until after the examinations are complete.
Enclosed you will fmd the printed paperwork listed below for the upcoming examination scheduled for the week of April 5, 2010 at Farley Nuclear Plant.
oES-201-2, Examination Outline Quality Checklist (I page) o ES-301-I, Administrative Topics Outline (I page) o ES-30 1-2, Control RoomlIn-Plant Systems Outline (I page)
- ES-301-3, Operating Test Quality Checklist (I page) o ES-301-4, Simulator Sceuario Quality Checklist (I pages)
.ES~301-5. Transient and EventCbecklist (2 pages) oES-301-6, Competencies Checklist (2 pages) o ES-401-4, Record of Rejected KlAs (2 pages) o ES-401-6, Written Exam Quality Checklist (I page) o ES-D-I, Scenario I Outline (6 pages) oES-D-I, Sceuario 3 Outline (5 pages) oES-D-I, Sceuario 4 Outline (6 pages) oES-D-I, Scenario 5 Outline (5 pages)
In addition to the above printed material, there is one USB password protected SanDisk drive provided with more extensive documentation of the examination that includes the above material as wen as material used to develop the printed infonnation. All of this is provided to ensure complete and proper documentation for the up corning examination. The enclosed USB password protected SanDisk drive contains the foUowing:
- Final written exam to be given with cover sheet and references for both the RO and SROexam.
- Examiner Scenario outlines for 4 Simulator exams.
- The Control RoomlIn-Plant Systems portion of the exam with supporting documents. (II Control RoomlIn-Plant JPMs)
- The Administrative Topics portion of the exam with supporting documents. (6 AdminJPMs)
If you have any questions, please contact Gary Ohmstede at (334) 899-5156, extension 6111, or Vince Richter (334) 899-5156, extension 6179 or call the exam room at extension 4758.
Enclosure:
GTOIDMC cc:
File Sincerely,
[fyou have any questions, please contact Gary Ohmstede at (334) 899-5156, extension 6111, or Vince Richter (334) 899-5156, extension 6179 or call the exam room at extension 4758.
Enclosure:
GTOIDMe cc:
File Sincerely,
Southern Nuclear Operating Company, Inc.
Post Office Drawer 470 Ashford. Alabama 36312 Tel 334.899.5156 Fax 334.814.4661 December 15,2009 Mr. Mark Bates United States Nuclear Regulatory Commission Sam Nunn Atlanta Federal Center 61 Forsyth Street SW, Suite 23T85 Atlanta, Georgia 30303-8931
Dear Mr. Bates:
FNP-2009-0067-TRN SOUTHERN'\\'
COMPANY Energy to Serve Your World 9-'
You will find enclosed the Written and Operating Exam, supporting documentation, and the forms as required by NUREG 1021, "Operator Licensing Examination Standards for Power Reactors", Revision 9, supplement I. All exam materials MUST be withheld from public disclosure until after the examinations are complete.
Enclosed you will find the following materials for the upcoming examination scheduled for the week of March 8, 2010 at Farley Nuclear Plant.
eES-201-2, Examination Outline Quality Checklist (1 page) e ES-201-3, Examination Security Agreement (2 pages) eES-301-1, Administrative Topics Outline FA2010301(1 page) eES-301-1, Administrative Topics Submittal Outline with explanation FA2010301 (2 pages) e Administrative lPMs (94 pages total) eES-301-2, Control Room/In-Plant Systems Outline FA2010301 (I page) eES-301-2, Control Room/In-Plant Systems Submittal Outline with explanation FA2010301 (3 pages) e Control RoomlIn-Plant Systems lPMs with keys and references (155 pages) eES-301-3, Operating Test Quality Checklist (1 page) e ES-30 1-4, Simulator Scenario Quality Checklist (1 page) eES-301-5, Transient and Event Checklist (2 pages) e ES-301-6, Competencies checklist (2 pages) eES-401-4, Record of Rejected KlAs (2 pages) eES-401-6, Written Examination Quality Checklist (1 page) e Simulator exam scenario #1 FA2010301 o ES-D-I, Scenario draft Outline (6 pages) o ES-D-I, Scenario Outline (6 pages) o ES-D-2, Required Operator Actions (35 pages) o HLT-33 NRC Exam Scenario #1 (16 pages) e Simulator exam scenario #3 FA2010301 o ES-D-l, Scenario draft Outline (6 pages) o ES-D-l, Scenario Outline (5 pages) o ES-D-2, Required Operator Actions (39 pages) o HLT-33 NRC Exam Scenario #3 (20 pages)
Page 1 of2 Southern Nuclear Operating Compa.lY. Inc.
Post Office Orawer 470 Ashford, Alabama 36312 FNP-2009-0067-TRN TeI3J4.a99.5156 fa~ 334.814.4661 December 15,2009 SOUTHERN A.
Mr. Mark Bates United States Nuclear Regulatory Commission Sam Nwm Atlanta Federal Center 61 Forsyth Street SW, Suite 23T85 Atlanta, Georgia 30303-8931
Dear Mr. Bates:
COMPANY You will find enclosed the Written and Operating Exam, supporting documentation, and the forms as required by NUREG 1021, "Operator Licensing Examination Standards for Power Reactors", Revision 9, supplement I. All exam materials MUST be withheld from public disclosure until after the examinations are complete.
Enclosed you will find the following materials for the upcoming examination scheduled for the week of March 8, 2010 at Farley Nuclear Plant.
o ES-201-2, Examination Outline Quality Checklist (I page) oES-201-3, Examination Security Agreement (2 pages) o ES-301-1, Administrative Topics Outline F A201 0301(1 page)
-£S-301-1, Administrative Topics Submittal Outline with explanation FA2010301 (2 pages) o Administrative JPMs (94 pages total) o ES-301-2, Control Room/In-Plant Systems Outline F A201 0301 (I page) o ES-301-2, Control Roomlln-Plant Systems Submittal Outline with explanation F A20 I 0301 (3 pages)
-Control Roomlln-Plant Systems IPMs with keys and references (155 pages) o ES-301-3, Operating Test Quality Checklist (1 page) oES-301-4, Simulator Scenario Quality Checklist (I page) o ES-301-5, Transient and Event Checklist (2 pages) o ES-301-6, Competencies checklist (2 pages) o ES-401-4, Record of Rejected KlAs (2 pages) o ES-401-6, Written Examination Quality Checklist (I page)
- Simulator exam scenario #1 FA2010301 o ES-D-I, Scenario draft Outline (6 pages) o ES-D-I, Scenario Outline (6 pages) o ES-D-2, Required Operator Actions (35 pages) o HLT-33 NRC Exam Scenario #1 (16 pages) o Simulator exam scenario #3 F A20 I 030 I o
ES-D-I, Scenario draft Outline (6 pages) o ES-D-I, Scenario Outline (5 pages) o ES-D-2, Required Operator Actions (39 pages) o HLT-33 NRC Exam Scenario #3 (20 pages)
Page I of2
- Simulator exam scenario #4 FA2010301 o ES-D-l, Scenario draft Outline (6 pages) o ES-D-l, Scenario Outline (6 pages) o ES-D-2, Required Operator Actions (35 pages) o HLT-33 NRC Exam Scenario #4 (17 pages)
- Simulator exam scenario #5 F A20 1 030 1 o ES-D-l, Scenario draft Outline (7 pages) o ES-D-l, Scenario Outline (6 pages) o ES-D-2, Required Operator Actions (40 pages) o HLT-33 NRC Exam Scenario #5 (17 pages)
- Tables showing Scenario Events for comparison o NRC exam Simulator event summary (simulator Matrix) (2 pages) o AUDIT exam Simulator event summary (simulator Matrix) (2 pages)
- Written Exam question key (277 pages), provided references for exam questions (10 pages),
and all supporting documentation, in four binders with tabs between each question
.2GB Memory Stick with electronic files of the exam and supporting documents If you have any questions, please contact Gary Ohmstede at (334) 899-5156, extension 6111, or Vince Richter (334) 899-5156, extension 6179 or Howard Fitzwater (334) 899-5156, extension 4758.
/12-15-2009 e / Lead Instructor-Exam Development cc:
FNP NRC Exam Development room Page 2 of2
- Simulator exam scenario #4 FA2010301 o ES-D-I, Scenario draft Outline (6 pages) o ES-D-I, Scenario Outline (6 pages) o ES-D-2, Required Operator Actions (35 pages) o HLT-33 NRC Exam Scenario #4 (17 pages)
- Simulator exam scenario #5 FA2010301 o ES-D-I, Scenario draft Outline (7 pages) o ES-D-I, Scenario Outline (6 pages) o ES-D-2, Required Operator Actions (40 pages) o HLT-33 NRC Exam Scenario #5 (17 pages)
- Tables showing Scenario Events for comparison o NRC exam Simulator event summary (simulator Matrix) (2 pages) o AUDIT exam Simulator event summary (simulator Matrix) (2 pages)
- Written Exam question key (277 pages), provided references for exam questions (10 pages),
and all supporting documentation, in four binders with tabs between each question
- 2GB Memory Stick with electronic files of the exam and supporting documents Jf you have any questions, please contact Gary Ohmstede at (334) 899-5156, extension 6111, or Vince Richter (334) 899-5156, extension 6179 or Howard Fitzwater (334) 899-5156, extension 4758.
Sincerely, 1 12-1 5-2009 Gary Ohms e I Lead Instructor-Exam Development cc:
FNP NRC Exam Development room Page 2 of2