ML101620421

From kanterella
Jump to navigation Jump to search
301 Draft Simulator Scenarios
ML101620421
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/28/2010
From:
NRC/RGN-II
To:
References
Download: ML101620421 (71)


Text

{{#Wiki_filter:Appendi Appen dixx D, D, Rev. Rev. 99 Scenario Scena rio Outlin Outlinee Form Form ES-D-1 ES-D-1 Facility:: Facility Summer V.C. Summ er Scenarrio Scena io No.: No.: _~1!..--_ Op-Te Op-Test st No.: No.: 11 Exami Examiners:ners: _ _ _ _ _ _ _ _ _ _ _ _ Operators: _ _ _ _ _ _ _ _ _ _ _ __ Initial Condit Initial Conditions: ions:_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ Turnover: Turnov er: 100% 100% IC, IC, AT AT MOL. MOL. 11.. Thunder Thund er storms in the area, severesevere weath weathe err check list being being implem implemented. ented. 2.

2. S/G "A,"

S/G A, Small tube leak, approx. 8 gpd. MAL-R MAL-RCSO CS002 O2A A

3. Motor Driven AFW Pump "A" A Impell Impeller replac replace ment in progre ement progress ss with 48 hours to complete, comple te, have done 12 hours so far.
4. Turnov Turno er that the "B" ver B S/G SIG rad monitor is OOS.
5. Painting in the area of the TD AFW pump.
6. Senior Resident is Walking down the CVCS system with system engineer.

Eve Maif. No. Malt. Event Event Event Event nt Type* Type* Descr Descriptiiption on No. 1 1 RO (I) Turbine Impulse Pressu Turbin Pressure re Transmitter PT-41 PT-41 6 Fails HI, Should be the selecte selectedd chann channeel. l. If 446 is selecte selected d to auto rods, then the rods will move out. RO take manua manuall control of the rods. Does Summer use auto rod control? 2 BOP (I) Steam Steam Gener Generator ator Steam Flow Transmitter Failure, 474 fails LOW, Ramp over a 4 minute period, or look at the conseque conse quencnces es to be able to do this and not receive a reacto reactorr trip. Allow the applicant to be able to diag diagno se and correct nose correct.. 3 RO C ROC Accidental VCT suction valve 115C 1 150 closure closure by system engi engine neer er while doing a line up with the SR Resident SRO Observ Observing.ing. This will causcause e the running Chargi Chargingng pump to (TS) cavitate, requiring securin securing g the running pump. Possible loss of letdown. Requires switching the Chargi Charging ng pumps and then TS evalua evaluation tion of loss loss ofof one CCP. IfIf loss loss of LD occurs , possib possibly ly chan changgee malfunction, so the scen scena rio is ario is not not to long long BOP(N)) with to many Reactivites and and Normals. BOP BOP restore LD ifif required. 4 SRO TD AFW pump pump Trip and and Throttl Throttle e valve trips, trips, due due to aa ladder ladder (TS) (TS) in in the area area while while painting. g. The ladder ladder falls on on the TDAFW W pump pump trip and and throttle valve reset bar bar and and brea breaks it, being ks it, being unable unable to to reset reset the the TDTD AFW AFW pump. pump. This This will will caus cause the SRO e the SRO to to enter enter TS TS 3.7.1 3.7.1.2.2,, and and the the need need to to be be inin hot hot standb standbyy inin 66 hours hours andand hot hot shutdo shutdown wn with with in in the the follow followiing ng 66 hours. hours.

Facility:: _V.C. Facility V.C. Summer Scena Scenarrio io No.: 1 1 Op-Test No.: 11 Examiners: Exami ners: Operators: Initial Conditions: . Turnover: 100% IC, AT MOL.

1. Thunder storms in the area, severe weathe weatherr check list being implem implemented.

ented.

2. SIG "A,"

S/G A, Small tube leak, approx. 8 gpd. MAL-R MAL-RCSO CS002 02A A

3. Motor Driven AFW Pump "A" A Impeller replac replace ement ment in progress with 48 hours to complete, compl ete, have done 12 hours so far.
4. Turnov Turno er that the "B" ver SIG rad monitor is OOS.

B S/G

5. Painting in the area of the TD AFW pump.
6. Senior Resident is Walkin Walkincig down the CVCS system with system engineer.

5 RO Reduce power to take the unit off line. In accordance with (Rx) GOP -004B

                                                    -004B.OOD.
                                                           .00D. Power OperaOperattionion Mode 1   1 (Descending BOP         Power)

(N) 6 BOP(C) BOPCC During the Down power power,, the "A"A FRV fails as is, this will cause the operat operatoorr to have to place the "A" A FRV in manua manuall and control the A SG in manua manuall during the Shut Down 7 BOP SG Tube Leak on the "C" C SG, ramping to approximately the (C) output of the existing chargi charginng g pump(s). Ramp up over as a5 minute J?eriod period. 8 Mall M all SIG tube rupture on the "C" S/G C SG to full flow of a tube, requires reacto reactorr trip. The Reactor Will nottripnot trip (ATWT (ATWT)) (EOP -13), Entry, (Resp (Respo onse nse to Abnormal Nuclear Power Gener Generaation) tion) Loss of power on the emerg emergeencyncy bus that supplies the B Emergency feed water pump. The Emergency Diesel generator tor starts automatically but will trip on overspeed, the DG will be able to be reset and restart restarteed d and it will work, work. IF the crew requests the restartrestart,, it will start otherwise entry into FR-H.1 FR-H.1 will most likely be required.

    • (N)ormal, (R)eac (R)eactivity, tivity, (I)nstrument, (C)omponen ponentt,, (M)ajor

Appendix D Appendix D Scenario Outline Scenario Outline Form Form ES-D-1 ES-D-1 Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: 11 Event No.: Event No.: 11 Page Page _ _ of of - - Event

Description:

Event

Description:

Time Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior I I I RD RO IOperator acknowledges AOP-401 AOP-401.7 .7 annunciator 615 2-5 (RCS TAVG Operator acknowledges annunciator 6152-5 (RCS TAVG-I TREE DEV TREF DEV HI/LO), Hl/LO), recognizes recognizes IPT0446 1PT0446 failure, failure, and and responds lAW lAW AOP-401.7 AOP-401 .7 Critical RD RO Place ROD CNTRL BANK SEL Switch in in MAN. MAN.

  • RD RO Ensure TREF 1~1 1 STG PRESS Switch is is positioned to the channel 1PT0447, CH IV).

operable channellPT0447, RD RO Adjust Control Rods until Tavg is within I.O°F 1.0°F of Tref Tref.. RD RO Check if Main Turbine load Is GREATER THAN 10%. RD RO Within one hour, verify the following permissives are dim: P13. 1STISTSTG STG PRESS. P7. REACTOR TRIP TRIP_BLOC BLOCKED.KED. RD RO Restore automatic rod control:

a. Check if automatic rod control is desired.
b. Verify reactor power is GREATER THAN 15% (C-5 status light dim).
c. Verify Tavg is within 1.0°FI.O°F of Tref.
d. Place ROD CNTRL BANK SEL Switch in AUTO (Crew may choose to return the rods to 230 steps prior to returning rods to auto but this is considered a good practice, not a requirement) requirement)..

BOP Place STM DUMP STM DUMP MODE SELECT in STM PRESS. BOP BOP Notify I&C to place AMSAC Notify l&C AM SAC in in BYPASS SRO SRO Within Within 66 hours, place the failed channel bistables in hours, place in aa tripped tripped condition. condition. SRD SRO evaluation evaluation of of Tech Tech Spec Spec Table 3.3-1 3.3-1 Appendix Appendix D, D, Page Page 3838 of of 39 39

Appendix DD Appendix Scenario Outline Scenario Outline Form Form ES-D-1 ES-D-1 Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: 11 Event No.: Event No.: 22 Page Page _ _ of of _ _ Event

Description:

Event

Description:

Time Time Position Position Applicants Actions Applicant's Actions oror Behavior Behavior AOP-401.3 AOP-401 .3 BOP BOP The BOP The BOP operator operator acknowledges acknowledges annunciator annunciator 624624 4-4 in in alarm, recognizes alarm, recognizes the the failure failure ofof IFT0474 1FT0474 and and responds responds lAW AOP-401.3 lAW AOP-401 .3 BOP BOP Depending on Depending on response response time,time, annunciator annunciator 624 624 1-5 1-5 (SG (SG A LVL DEV) LVL DEV) may also alarm. BOP Verify the failed channel is the controlling channel. BOP Select the operable flow channel: Place FW CONTROL CHANNEL SEL Switch to the operable channel. Place STEAM CONTROL CHANNEL SEL Switch to the operable channel. BOP Verify Turbine Load is LESS THAN 950 Mwe. Using any method available, reduce Turbine Load by 40 Mwe to 50 Mwe. (The crew will likely decide to borate to avoid RAOC concerns and would likely turn on BU heaters for improved mixing. This would not be required for such a small load decrease but would be a good practice). BOP Verify only one SG is AFFECTED AFFECTED.. critical Qritical BOP Adjust the Feedwater Flow Control Valve as necessary necessary to to restore feed flow to to the AFFECTED SG. SG. BOP BOP Restore Restore Narrow Narrow Range level in Range level in all all SGs SGs toto between between 60% 60% and and 65%. 65%. BOP BOP Check Check ifif Feedwater Feedwater Pump Pump speed speed control control is is operating operating properly: properly: Feedwater Feedwater Header Header pressure pressure isis GREATER GREATER THAN THAN Main Steam pressure. Main Steam pressure. ' Feed Feed flow flow isis normal normal forfor flow flow and and power power level. level. All All operating operating Feedwater Feedwater Pump Pump speeds speeds and and flows flows are are balanced balanced BOP BOP Verify Verify Narrow Narrow Range Range levellevel in in all all SGs SGs isis normal. normal. BOP BOP Restore Restore thethe AFFECTED AFFECTED SG SG control control systems systems to to normal: normal: Appendix Appendix D, D, Page Page 38 38 of of 3939

Appendix DD Appendix Scenario Outline Scenario Outline Form Form ES-D-1 ES-D-1 Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: 11 Event No.: Event No.: 22 Page _ _ of Page of _ _ Event

Description:

Event

Description:

Time Time Position Position j Applicants Actions Applicant's Actions or or Behavior Behavior Place the Place the Feedwater Feedwater Flow Flow Control Control Valve Valve inin AUTO. AUTO. Place the Place the Feedwater Feedwater Pump Pump Speed Speed Control System in Control System in AUTO. REFER AUTO. REFER TO TO SOP-210, SOP-210, FEEDWATER FEEDWATER SYSTEM. SYSTEM. SRO SRO Within six Within six hours, hours, place place the the failed failed channel channel protection protection bistables in bistables in aa tripped tripped condition: condition: SRO SRO evaluates evaluates Tech Spec Table 3.3-3 CREW Determine and correct the cause of the channel failure. Appendix Appendix D, D, Page Page 3838 of of 39 39

Appendix D' Appendix D Scenario Outline Scenario Outline Form Form ES-D-1 ES-D-1 Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: 11 Event No.: Event No.: 33 Page Page _ _ of of _ _ Event

Description:

Event

Description:

Time Time Position Position Applicant's Applicants Actions Actions oror Behavior Behavior AOP-102.2 AOP-1 02.2 RD RO Operator acknowledges Operator acknowledges that that annunciators annunciators 614 614 4-2 4-2 (CHG (CHG PP B/C TRIP), 6145-1 PP 614 5-1 (CHG LINE LINE FLO HIILO), 6*172-2, FLO HI/LO), 6.17 2-2, 618 2-2, & 6182-2, 619 2-2

                                       & 619   2-2 (RCP (RCP A, B, C   C #1 SEAL SEAL INJ INJ FLO FLO LO)LO) are all in are       in alarm, recognizes recognizes the "B"  B Charging Charging Pump Pump hashas tripped, and responds lAW AOP-1 02.2 RD RO         Check if Charging Pump flow is normal:

IF Charging Pump has tripped or flow is abnormal, THEN perform the following: E Ensure the Charging Pump is secured. C E Close all Letdown Isolation Valves: C PVT-8149A(B)(C), L PVT-8149A(B)(C), LTDN TDN ORIFICE A(B)(C) ISOL. PVT-8152, L LTDN TDN LINE ISOL. LCV-459, LTDNLTDN LINE ISOL. LCV-460, L LTDN TDN LINE ISOL. [' Close FCV-122, CHG FLOW. E L[' Verify CCW flow to the RCP Thermal Barriers is GREATER THAN 90 gpm on Fl-7273A(B) FI-7273A(B),, THERM BARR FLOW GPM. EC Display Dedicated Display ZZRCPBRG on the IPCS IPes to monitor monitor RCP temperatures temperatures.. EC Contact Electrical Electrical and Mechanical Maintenance to investigate. RD RO Verify Verify Charging Charging SystemSystem valve valve lineup: lineup: E[' IF IF Charging Charging PumpPump suction suction isis aligned aligned to to the the VCT, VCT, THEN THEN ensure ensure both both LCV-1 15C(E), VCT LCV-115C(E), VCT OUTLET OUTLET ISOL, ISOL, are are open. open. Critical Critical SRD SRO SRO SRO evaluates evaluates Tech Tech Spec Spec 3.5.2 3.5.2 andand determines determines 72 72 hr. hr. action action statement. statement. RD RO Eo Ensure Ensure thethe following following valves valves are are open: open: MVG-8106, MVG-8106, CHG PP.CHG PP. MVT-8109A MVT-8109A(B)(C),(B)(C), CHGCHG PP PP A(B)(C). A(B)(C). MVG-8130A MVG-8130A(B), (B), LPLP AA SUCT SUCT TO TO CHG CHG PP PP C. C. MVG-8131A MVG-8131A(B), (B), LP LP BB SUCT SUCT TO TO CHG CHG PP PP C. C. MVG-8132A MVG-8132A(B), (B), CHG CHG PP PP CC TO TO LPLP AA DISCH. DISCH. Appendix Appendix D, D, Page Page 3838 of of 39 39

Appendix DD Appendix Scenario Outline Scenario Outline Form Form ES-D-1 ES-D-l Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: 11 Event No.: Event No.: 33 Page Page _ _ of of _ _ Dscrintinn: Event

Description:

Event Time Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior MVG-8133A(B), CHG MVG-8133A(B), CHG PP PP C C TO TO LP LP BB DISCH DISCH RO RO o Check Check the the Charging Charging headerheader valve valve lineup lineup as as follows: follows: Ensure MVG-81 Ensure MVG-8107, 07, CHGCHG LINE LINE ISOL, ISOL, is is open. open. Ensure MVG-81 Ensure MVG-8108, 08, CHGCHG LINE LINE ISOL, ISOL, isis open. Ensure FCV-122, Ensure FCV-122, CHG CHG FLOW, FLOW, is in MAN is in MAN and and CLOSE. CLOSE. no RO Ensure one of the following valves is open: PVT-8146, NORM CHG TO RCS RCS LP LP B. OR PVT-8147, AL ALTT CHG TO RCS LP A. BOP? oD Locally verify Charging Pump suction pressure is between 50 psig and 100 psig as indicated on the following PI-151A, SUCTION PRESS, for Charging Pump A. PI-152A, SUCTION PRESS, for Charging Pump B. PI-153A, SUCTION PRESS, for Charging Pump Pum~ C. RO With Shift Supervisors Supervisor's permission, start a Charging Pump, while monitoring RCP temperatures temperatures.. REFER REFER TO SOP-i SOP-102,02, CHEMICAL AND VOLUME CONTROL SYSTEM. RO WHEN a Charging Pump is operating, THEN place Charging Charging and Normal Normal Letdown in service.. service .. REFER SOP-i SOP-102, 02, CHEMICAL AND AND VOLUME CONTROL CONTROL SYSTEM. SOP-i SOP-102 Section Ill.F 02 Section III.F SRO SRO Crew Crew instructs instructs the the building building operator operator to to perform perform Attachment Attachment VB to mechanically and electrically VB to mechanically and electrically align align C"c" charging charging pump pump to to B "B" Train. Train. (If (If the the crew crew chooses, chooses, they they might might start start A

                         "A" CCW CCW pump pump and     "A" charging and A     charging pump pump to   to get get aa charging charging Appendix Appendix D,  D, Page Page 38  38 of of 39 39

Appendix DD Appendix Scenario Outline Scenario Outline Form Form ES-D-1 ES-D-1 Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: 11 Event No.: Event No.: 33 Page Page _ _ of of _ _ Event

Description:

Event

Description:

Time Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior pump back pump back while while theythey are are waiting waiting to get "c" to get C charging charging pumppump racked up racked up on B Train.) on "B" Train.) RO RO To start To start XPP-0043C, XPP-0043C, PUMP PUMP C, C, on on miniflow, miniflow, complete complete

                    . Attachment      VB    if Charging Attachment VB if Charging Pump        Pump C   C is is to to be be aligned aligned to to Train B.B.

Building Building Following the Following the completion completion of of Attachment Attachment VA(B),VA(B), Chilled Chilled Expansion Tank levels should be monitored for Water Expansion indications of equalization:

1) L9004A, CHILLED WATER EXPANSION TNK A 1L109004-VU, CHILL WATER EXP TK A LV, or ILl09004-VU, LEVEL IND (IB-412).
2) L9006A, CHILLED WATER EXPANSION TNK B IL109006-VU, CHILL WATER TK B LEVEL LV, or ILl09006-VU, IND_(IB-412 IND (IB-412). ).

RO P1-121, CHG PRESS PSIG, is between 2650 psig Verify PI-121, and 2850 psig. Monitor the following for proper pump operation:

a. LR-459, PZR % LEVEL & LEVEL SP.
b. FI-130A, RCP A INJ FLO GPM.
c. FI-127A, RCP B B INJ FLO GPM.
d. FI-124A, RCP C C INJ FLO GPM.

RD RO Ensure Ensure the appropriate appropriate train of of Component Cooling is is operating per SOP-i operating per SOP-118. 18. RD RO Ensure Ensure thethe appropriate appropriate train of of Chill Chill Water Water is is operating operating per per SOP-501. SOP-501. RD RO Ensure Ensure XPP-43C-PP XPP-43C-PP1, 1, CHG CHG PPPP CC AUX AUX OIL OIL PP, PP, isis running. running. Building Building Verify Verify 1P100153A, IP100153A, CHG CHG PUMP PUMP C C SUCT SUCT HDR HDR PRESS PRESS IND, IND, indicates pump suction indicates pump suction pressure pressure isis greater greater than than 1515 psig psig (AB-388). (AB-388). RO RO Start Start XPP-0043C, XPP-0043C, PUMP PUMP C. C. (PEER (PEER LI) 0) RO RO Verify Verify XPP-43C-PP XPP-43C-PP1, CHG PP 1, CHG PP CC AUX AUX OIL OIL PP, PP, stops stops automatically automatically whenwhen the the Charging Charging Pump Pump comes comes up up toto full full speed. speed. Appendix Appendix D, 0, Page Page 3838 of of 39 39

Appendix D D Scenario Outline Scenario Outline Form Form ES-D-1 ES-D-i Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: 11 Event No.: Event No.: 33 Page Page _ _ of of _ _

Description:

Event

Description:

Event f Time Time Position Position Building [ Verify 1P100153A, CHG PUMP C SUCT HDR PRESS IND, Applicants Actions or Applicant's or Behavior Behavior Verify IP100153A, CHG PUMP C SUCT HDR PRESS IND, indicates pump suction pressure is greater than 15 15 psig (AB-388). RD RO Monitor the following to verify proper pump operation:

1) Charging Pump C running current is between 30 amps and 50 amps.

P1-121, CHG PRESS PSIG, is between 2650

2) PI-121, psig and 2850 psig.
3) XVG-9684C-CC, CCW TO CHG PP C, is open open..

SO P-i 02 Section IV.M SOP-102 RD RO Place FCV-122, FCV-i 22, CHG FLOW, in MAN and close. RD RO Place PCV-145, LO PRESS LTDN, in MAN and open to 70%. (PEER 0) C) RD AO Place TCV-144, CC TO LTDN HX, in MAN and open to 100%. RD RO Place TCV-143, LTON LTDN TO VCT OR DEMIN, in VCT. RD RO Open PVT-8152, LTON LTDN LINE ISOL. RD RO Open the following:

a. LCV-459, LTDN LTON LINE ISOL.
b. LCV-460, LTDN LTON LINE ISOL.

RD RO Ensure the following Charging Line Isolation Valves are open:

a. MVG-8107, MVG-81 07, CHG LINE ISOL. ISOL.

b.

b. MVG-8108, MVG-81 08, CHG LINE ISOL.

RO Slowly open FCV-122, CHG FLOW, to establish 60 gpm flow as indicated on FI-122A, FI-122A, CHG FLOW GPM. GPM. RD RO Open Open Orifice Orifice Isolation Isolation Valves to obtain the desired desired Letdown Letdown flow rate (60 (60 gpm gpm toto 120120 gpm): gpm): a.

a. PVT-8149A, PVT-8149A, LTDNLTON ORIFICE ORIFICE A A ISOL (45 gpm).

ISOL (45 gpm). b.

b. PVT-8149B, PVT-8149B, LTDNLTDN ORIFICE ORIFICE BB ISOL (60 gpm).

ISOL (60 gpm).

c. PVT-8149C,
c. PVT-8149C, LTDNLTDN ORIFICE ORIFICE C C ISOL (60 gpm).

ISOL (60 gpm). Appendix D, 0, Page Page 3838 of of 39 39

Appendix D0 Appendix Scenario Outline Scenario Outline Form Form ES-D-1 ES-D-1 Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: 11 Event No.: Event No.: 33 Page Page _ _ of of _ _ Event

Description:

Event

Description:

I Time Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior RO RO Adjust FCV-122, Adjust FCV-122, CHG CHG FLOW, FLOW, as as required required to to maintain maintain TI-TI 140, REGEN 140, REGEN HX HX OUTOUT TEMP TEMP of, °F, between between 250°F250°F andand 350°F while 350°F maintaining Pressurizer while maintainina Pressuilzer level. level. RO RO Adjust PCV-145, Adjust PCV-145, LO LO PRESS PRESS LTDN, LTDN, to to maintain maintain PI-145, P1-145, LO PRESS LO PRESS LLTDNTDN PRESSPRESS PSIG, PSIG, between between 300 300 psig psig and and psig. 400 psig. 400 RO PCV-145, LO PRESS LTDN, in AUTO. Place PCV-145, RO RO Adjust TCV-144, CC TO LTDN LTDN HX, HX, potentiometer potentiometer as necessary to maintain the desired VCT temperature and place in AUTO. Refer to VCS Curve Book, Figure V11.15. Vll.15. RO When Pressurizer level matches reference level, place FCV-122, CHG FLOW, in AUTO per Section IV. RO After the Letdown temperatures have stabilized, place TCV-143, LTDN TO VCT OR DEMIN, in DEMIN/AUTO. DEMIN/AUTO. Op-Test Op-Test No.: No.: Scenario Scenario No.: No.: 11 Event No.: No.: ~ 3 £-{ Page _ _ of of _ _ Event Event

Description:

Description:

Time Time j Position Position Applicants Applicant's Actions Actions or or Behavior Behavior Building Building Building operator reports Building operator reports oil oil leak leak on on TDEFP TDEFP governor governor SRO/BOP SRO/BOP Crew Crew determines determines TDEFPTDEFP is is inoperable inoperable and and decides decides toto remove remove itit from from service by taking service by taking both both 2030 2030 valve valve switches switches to to the the closed closed position. position. Both Both annuaciators annuaciators 623 623 2-3 2-3 and and 622 622 2-3 (TD 2-3 (TD EFP EFP AUTOSTAR AUTOSTART T DEFEATED DEFEATED) alarm as

                                                                                  ) alarm   as the the 2030 2030 valves valves close.

close. Critical Critical SRO SRO SRO SRO evaluates evaluates Tech Tech Spec Spec 3.7.1.2 3.7.1.2 andand determines determines thatthat aa plant Qlant shutdown shutdown isis necessary necessary Appendix Appendix D, D, Page 38 of Page 38 of 39 39

Appendix DD Appendix Scenario Outline Scenario Outline Form Form ES-D-1 ES-D-1 Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: 11 Event No.: Event No.: 55 Page _ _ ofof _ _ Page Event

Description:

Event

Description:

Time Time Position Position Applicants Actions Applicant's Actions oror Behavior Behavior GOP-4B GOP-4B BOP BOP Reduce load Reduce load by one of by one the following of the following methods: methods:

1) By
1) By use use ofof the the DEC DEC LOAD LOAD RATERATE circuit circuit
2) By use
2) By use ofof the the load load limiter limiter SRO SRO MDS calls and requests MDS calls and requests that the the load load decrease decrease be be raised raised to 11 %/min to  %/min because because of approaching severe of approaching severe thunderstorm.

thunderstorm. BOP BOP As load decreases, adjust MegavarsMegavars using GEN FIELD VOLT VOL requested by T ADJ as requested by the Load Load Dispatcher Dispatcher and within the Estimated Generator Capability Curve (Enclosure A). RO Maintain Tavg within the control band by Control Rod motion or boron concentration changes. Critical Critical RO Borate or dilute per SOP-106, Reactor Makeup Water System, to maintain the following parameters:

                            £I within limits.
1) ill
2) Control Rods above the Rod Insertion Limit.

Appendix Appendix D, D, Page Page 38 38 of of 39 39

Appendix D Appendix D Scenario Outline Scenario Outline Form Form ES-D-1 ES-D-1 Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: 11 Event No.: Event No.: 66 Page Page _ _ of of _ _ Event

Description:

Event

Description:

II Time Time Position Applicants Actions or Behavior Applicant's Behavior AOP-21 0.1 BOP As load decreases, BOP operator notices that FCV-0478 is failed as is and takes manual control of the valve lAW AOp- AOp 210.1. (could possibly receive annunciator 624 1-5 SG A LVL DEV.) Crew may also decide to conservatively stop the load reduction until they can determine that they have manual control of the vlave but this would not be required because it is not in the procedure. BOP 11 Manually adjust the AFFECTED Feedwater Flow Control Valve as necessary to maintain Narrow Range SG level between 60% and 65%: 60%and oII PVT-478, SG A FWF. EWE. oL PVT-488, SG B FWF. EWE. oL PVT-498, SG C FWF. EWE. SRO Dispatch I&C l&C to determine cause of auto control failure. Appendix D, Appendix D, Page Page 38 38 of of 39 39

Appendix0D Appendix ScenarioOutline Scenario Outline Form Form ES-D-1 ES-D-1 Op-TestNo.: Op-Test No.: ScenarioNo.: Scenario No.: 11 EventNo.: Event No.: 77 Page Page_ _ ofof_ _ EventDescription: Event

Description:

Time Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior AOP-112.2 AOP-1 12.2 RD RO RO RO acknowledges acknowledges that that annunciator annunciator 646 646 2-1 2-1 (MN (MN STM STM LINE RMG-19 LINE RMG-19 HI HI RAD) RAD) isis inin alarm alarm and pulls the and pulls the ARP.ARP. RD RO Verify the Verify the alarm alarm isis valid valid and and identify identify the the Main Main Steam Steam lineline affecte d by observ affected by observing RM-G ing RM-G19A, B, B, and and C C and and RlR-8. RIR-8. SRO SRO Request Health Request Health Physics Physics perform perform radiological radiological surveys surveys around around the the Main Main Steam Steam lines. lines. SRO SRO Direct Chemistry Direct Chemistry to sample all all Steam Steam Generators Generators for activity. activity. Building Building Align the condenser condenser exhaust exhaust to the Auxiliary Auxiliary Building Building Charcoal Exhaust Charcoal Exhaust as follows: follows:

a. Open XVB0011 XVBOO1 1 O-AR,0-AR, MN&AUX MN&AUX COND VAC PP CHAR EXH DISCH VALVE VALVE (TB-436).

(TB-436).

b. Close XVBOO1 XVB001 09-AR09;.AR,, MN&AUX MN&AUX COND VAC PUMP ATMO ATMOS S_DIS DISCHCH_V VALVE ALVE_(TB-4(TB-436).

36). BOP BOP Reduc Reduce e all Steam Genera Generator tor blowd blowdownown flows to minim minimum. um. SRO SRO If the alarm is valid, refer to AOP-1 AOP-112.2.12.2. BOP BOP IfIf they have have notnot already already done done so so in in previo previous event, the us event, the crew crew may may elect elect to to stop stop the the load load reducti reduction and stabiliz on and stabilizee power power at at this this point. point. BOP BOP The The tubetube leak leak will will likely likely cause cause annunc annunciator 624 3-5 iator 624 3-5 (( SG SG C C LVL DEV) to alarm (expec LVL DEV) to alarm (expected alarm) ted alarm).... RD RO Check Check ifif PZR PZR levellevel cancan bebe mainta maintained: ined:

a. Open FCV-1
a. Open FCV-122, 22, CHG CHG FLOW FLOW,, as as necess necessary ary toto mainta maintain in PZR PZR levellevel this this will will cause cause annunc annunciator iator 614614 5-15-1 (CHG (CHG LINELINE FLO FLO Hl/LOHIILO) ) toto alarm alarm - expect expected alarm).

ed alarm) . b.b. Verify Verify PZR PZR level level isis at at or or trendin trending g toto progra program level. m level. RD RO Reduc Reduce e Letdow Letdown n toto one one 4545 gpm gpm RD RO IF IF PZRPZR level level continu continues es toto decrea decrease, THEN perform se, THEN perform the the Follow Following ing Close Close PVT-8 149A, LTDN PVT-8149A, LTDN ORIFI ORIFICE CE AA ISDLISOL Start a second Start a second CCW Pump.CCW Pump. Appen Appendixdix D,D, PagePage38 38ofof39 39

Appendix D Appendix D Scenario Outline Scenario Outline Form Form ES-D-1 ES-D-1 Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: 11 Event Event No.: No.: 77 Page Page _ _ ofof _ _ Event

Description:

Event

Description:

Time Time Position Position Applicant's Applicants Actions or Behavior Behavior Start a second Charging Pump. SRO Check if SI is required Verify VCT level is being maintained between 20% and 40%. SRO CRS directs the RO to insert a manual reactor trip and that they will actuate SI when directed by EOP-1.0 EQP-i .0 Appendix Appendix D,0, Page 38 of Page 38 of 39 39

Appendix D 0 Scenario Outline Scenario Outline Form ES-D-1 Form ES-D-1 Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: 11 Event No.: Event No.: 66 Page Page _ _ ofof -- Event

Description:

Event

Description:

Time Position Position Applicant's Applicants Actions or or Behavior Behavior EOP-1 3M EOP-13.0 RD RO Verify Reactor Trip: Trip the Reactor using both Reactor Trip Switches. Critical RD RO IF the Reactor will NOT trip OR is NOT subcritical, THEN insert Control Rods at the fastest control rod insertion rate SRO Direction given to trip the reactor locally using Attachment 11 Follow-up question - may ask SRO to classify this emergency event (Site Area Emergency) Critical

     \

BOP Verify Turbine/Generator Trip: Verify all Turbine STM STOP VLVs are closed. Depress Emerg Trip Sys TRIP. BOP Ensure Generator Trip (after 30 second delay) I

1) Ensure the GEN BKR is open.
2) Ensure the GEN FIELD BKR is open.
3) Ensure the EXC FIELD CNTRL is tripped.

BOP Ensure EFW Pumps are running: Critical RD RO Initiate emergency boration of the RCS: Ensure at least one Charging Pump is running. Verify PZR pressure is LESS THAN 2335 psig. Verify SI ACT status light is NOT lit. Verify SI flow on Fl-943, FI-943, CHG LOOP B B CLD/HOT LG FLOW GPM.GPM. GO GO TO Step 5. Observe the CAUTION prior to Step 5. Critical Building Building Operator locally trips the RTBs at this point. Verify all all Reactor Trip Trip and and Bypass

                                                                 'Bypass Breakers Breakers are are open.

open. Verify all all Rod Bottom Bottom Lights Lights are are lit. lit. Verify Reactor Reactor Power Power level level is is decreasing. decreasing. RD RO 55 Verify Verify Containment Containment Ventilation Ventilation IsolationIsolation Valves Valves closed closed by by verifying verifying the the Safety INJECTION monitor Safety INJECTION monitor Appendix Appendix D, D, Page Page 3838 of of 39 39

Appendix D Appendix D Scenario Outline Scenario Outline Form Form ES-D-1 ES-D-1 Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: 11 Event No.: Event No.: 66 Page Page _ _ of of _ _

Description:

Event

Description:

Event Time Time I Position Position lights are are dim, dim, Applicants Actions Applicant's Actions oror Behavior Behavior lights RO RO Verify the Reactor Reactor is is subcritical: subcritical: Power Range Power channels indicate Range channels indicate LESSLESS THAN 5%. 5%. Intermediate Range channels indicate indicate a negative startup rate SRO GO TO Step 15. Observe the CAUTION prior to Step 15. SRO RETURN TO the Procedure and Step in effect (EOP- (EOP 1.0). EOP-1 .0 EOP-1.0 RO Reactor Trip: Verify ReactorTrip: Trip the Reactor using either Reactor Trip Switch. Verify all Reactor Trip and Bypass Breakers are open. I Verify all Rod Bottom Lights are lit. Verify Reactor Power level is decreasing. BOP Verify Turbine/Gen Turbine/Generatorerator Trip: Verify all Turbine STM STOP VLVs are closed. Ensure Ensure Generator Trip (after 30 second delay): Ensure Ensure the the GEN GEN BKRBKR is is open. open. Ensure Ensure the the GEN GEN FIELD BKR BKR is is open. open. Ensure Ensure the EXC EXC FIELD CNTRL CNTRl is is tripped. BOP BOP Verify both ESF Verify both ESF buses. buses. BOP BOP operator operator notes notes that that there there is no is no power power onon 1DB lOB and and that that the the diesel diesel did did not not start. start. HeHe announces announces thatthat there there is is aa lockout lockout on on XFMR-XTF31 XFMR-XTF31 (by (by recognizing recognizing annunciator annunciator 639 6394-24-2 inin alarm). alarm). BOP BOP operator operator also also notes notes that that annunciator annunciator 637 6376-1 (DG BB 6-1 (DG ENG START FAIL) ENG START FAil) is is in in alarm alarm BOP BOP BOP BOP operator depresses the operator depresses the B "B" DG DG Emergency Emergency StartStart Pushbutton Pushbutton and and notes notes that that thethe diesel diesel does does start start and and thethe Appendix Appendix D, 0, Page Page 3838 of of 39 39

Appendix 0D Appendix ScenarioOutline Scenario Outline Form Form ES-O-1 ES-D-1 Op-TestNo.: Op-Test No.: ScenarioNo.: Scenario No.: 11 EventNo.: Event No.: 66 Page Page_ _ ofof_ _ EventDescription: Event

Description:

[ Time Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior DG breaker DG breaker doesdoes close close toto energize energize 11 DB. DB. RD RO Check ifif SI Check SI is is actuated: actuated: Check Check ifif either either SI SI ACTACT status status light light isis bright bright on on XCP-XCP 6107 1-1 6107 1-1 oror Any Any redred first-out first-out SISI annunciator annunciator isis lit lit on on XCP-626 XCP-626 top top row. row. Actuate SI Actuate using either SI using either SI SI ACTUATION ACTUATION Switch. Switch. Critical Critical BOP BOP Complete ATTACHMENT Complete ATTACHMENT 3, 3, SI SI EQUIPMENT EQUIPMENT VERIFICATION. VERIFICATION. SRO SRO Announce plant Announce plant conditions conditions over over the page page system. system. RD RO Verify RB pressure pressure has remained remained LESS THAN 12 PR-951, RB PSIG (P-951), red pen. psig on PR-951, I I BOP BOP temperature: Check RCS temperature: With any RCP running, RCS Tavg is stable at OR 557°F. trending to 55YOF. With no RCP running, RCS Tcold is stable at OR trending to 557°F 55YOF IF Narrow Range SC SG level is LESS THAN 30% [50%] in all SGs, THEN reduce EFW flow as necess necessary ary to stop the the cooldown, while maintaining while maintaining total total EFW EFW flow GREATER GREATER THAN THAN 450 450 gpm. gpm. WHEN WHEN Narrow Narrow Range SG SG level level is is GREATER GREATER THAN THAN 30% 30% [50%] [50%] in in at at least least oneone SG,SG, THENTHEN control control EFW EFW flow flow as as necess necessaryary to to stabiliz stabilize RCS temper e RCS temperature at 55YOF. ature at 557°F. RD RO Check Check PZR PZR PORV PORVs s and and Spray Spray ValvesValves:: PZR PZR PORVs PORVs are are closed closed.. PZR PZR Spray Spray Valves Valves are are closed closed.. Verify power is availab Verify power is available le toto at at least least one one PZR PZR PORV PORV Block Block Valve. Valve. MVG-8000A MVG-8000A, , RELIEF RELIEF 445 445 AA ISDL.ISOL. MVG-8000B MVG-8000B, , RELIEF RELIEF 444 444 BB ISOL.ISOL. MVG-8000C MVG-8000C, , RELIEF RELIEF 445 445 BB ISDL. ISOL. Verify at least Verify_at least oneone PZR PZR PDRV PORV Block BlockValveValve isis open open RO RO Check Check ifif RCPs RCPs shouldshould be be stoppe stopped: d: RCS RCS pressu pressurere isis LESS LESS THAN THAN 1400 1400 psigpsig AND AND SI SI flow flow isis Appendix Appendix D, 0, Page Page 38 38 ofof3939

Appendix D Appendix D Scenario Outline Scenario Outline Form Form ES-D-1 ES-D-1 Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: 11 Event No.: Event No.: 66 Page Page _ _ ofof -- Event

Description:

Event

Description:

Time Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior indicated on indicated Fl-943, CHG on FI-943, LOOP B CHG LOOP B CLD/HOT CLD!HOT LG LG FLOW FLOW GPM. GPM. Note: RCS Note: RCS pressure pressure should should bebe about about 1800 1800 psig psig so so no no RCP trip RCP trip should be be required. required. BOP Verify no SG is FAULTED: No SG pressure is decreasing in an uncontrolled manner. depressurized. No SG is completely depressurized. RO Verify Secondary radiation levels indicate SG tubes are NOT RUPTURED: RM-G19A(B)(C), STMLN HI RNG GAMMA. RM-A9, CNDSR EXHAUST GAS ATMOS MONITOR. RM-L3, STEAM GENERATOR BLOWDOWN LIQUID MONITOR. RM-L10, RM-L 10, SG BLOWDOWN CW DISCHARGE LIQUID MONITOR. Critical SRO GO TO EOP-4.0, EOP-4.O, STEAM GENERATOR TUBE RUPTURE, Step 1. 1. Appendix D, Appendix D, Page Page 3838 of of 39 39

Appendix D Appendix D Scenario Outline Scenario Outline Form Form ES-D-1 ES-D-1 Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: 11 Event No.: Event No.: 66 Page Page _ _ of of _ _

Description:

Event

Description:

Event Time Time I Position Position Applicants Actions Applicant's Actions oror Behavior Behavior I I I I Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: 11 Event No.: Event No.: 66 Page Page _ _ of of _ _ Event

Description:

Time Time Position Applicants Actions or Behavior Applicant's RO RCPs should be stopped: Check if Reps Check if either of the following criteria is met: Annunciator XCP-612 4-2 is lit (PHASE B ISOL). i OR RCS pressure is LESS THAN 1400 psig AND SI flow is indicated on FI-943, CHG LOOP B CLD/HOT LG FLOW GPM. Note: RCS pressure should be about 1800 1800 psig so it should not be necessary to secure any RCPs SRO Identify the RUPTURED SG(s): Narrow Range level in any SG increasing in an uncontrolled uncontrolled manner, OR High Radiation on any of RM-G19A(B RM-G 19A(B)(C),)(C), STMLN STMLN HI HI RNG RNG. GAMMA, GAMMA, OR Local hand held radiation monitor readings taken by by Health Health Physics Physics on the blowdown lines at following penetrations: XRP0326, SG SG A A Blowdown Blowdown Line Line (AB-412 (AB-412 West West Pen). Pen). XRP0224, XRP0224, SG SG BB Blowdown Blowdown Line Line (IB-412 (IB-412 East East Pen Pen XRPO219, XRP0219, SG SG C C Blowdown Blowdown Line Line (lB-412 (IB-412 East East Pen), Pen), OR As determined OR As determined by by Chemistry Chemistry ampleample analysis analysis for for abnormal abnormal activity activity using using aa frisker. frisker. BOP BOP Isolate Isolate flow flow from from each each RUPTURED RUPTURED SG: SG: Place Place the the Steamline Steamline PWR PWR RELIEF RELIEF A(B)(C) A(B)(C) SETPT SETPT Controller(s) Controller(s) Appendix Appendix D, D, Page Page 38 38 ofof 39 39

Appendix D Appendix 0 Scenario Outline Scenario Outline Form Form ES-D-1 ES-D-1 Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: 11 Event No.: Event No.: 66 Page Page _ _ ofof _ _ Event

Description:

Event

Description:

Time Time II Position Position Applicants Actions Applicant's Actions or Behavior Behavior in MAN and closed. Adjust the PWR RELIEF A(B)(C) SETPT Controller(s)Controller(s) (1150 psig). to 8.85 (1150 psig). Place the Steamline PowerPower Relief Relief A(B)(C) Mode Mode Switch(s) in PWR RLF. Place the PWR RELIEF A(B)(C) SETPT Controller(s) in AUTO. BOP WHEN RCS Tavg is LESS THAN P-12 (552°F), THEN place both STM DUMP INTERLOCK Switches to BYP INTLK. BOP Verify the Steamline PORV closed. Critical BOP IF at least one MD EFW Pump is running, THEN isolate the TD EFW Pump by placing PVG-2030, STM SPL SPLY Y TO TD EFP to CLOSE. BOP/Building Open XMC1 DB2Y 05EH, O5EH, EMERG FEEDWATER PUMP MAIN STEAM BLOCK XVG2802B-MS XVG28O2B-MS (AB-463). XVGO28O2B-MS, MS HEADER C EF PUMP Close XVG02802B-MS, TURBINE SUPPLY VLV BOP Close the following for each RUPTURED SG: 56: 56 Blowdown, PVG-503A(B)(C). SG MS Drain Isolation, PVT-2843A(B)(C). MS Drain Isolation, PVT-2877B for SG C. Critical BOP Close the following for each RUPTURED SG: MS Isolation Valve, PVM-2801 A(B)(C PVM-2801A(B)(C AND MS Isolation Bypass PVM-2869A(B)(C). The ruptured SG is now Isolated. Appendix Appendix D, D, Page Page 38 38 ofof 39 39

Appendix D, Appendix D, Rev. Rev. 99 Scenario Outline Scenario Outline Form Form ES-D-1 ES-D-1 Facility: _ _ _ _ _ _ _ _ Scenario Facility: Scenario No.: No.: _-!2=-----__ Op-Test _____ Op-Test No.: No.: _..:...1 _j_______ Examiners: _ _ _ _ _ _ _ _ _ _ _ _ Operators: _ _ _ _ _ _ _ _ _ _ _ __ Examiners: Initial Conditions: AT approximately 45'% Initial 45% power and increasing. increasing. Turnover: At the point of the GOP when the second feed water pump is going to be placed in service. The crew is to place the B Main Feed Water Pump in service lAW XXXX. Thunder storms in the area, severe weather check list being implemented.

1. A, Small tube leak, approx. 8 gpd. MAL-RCS002A S/G "A," MAL-RCSOO2A
2. Motor Driven AFW Pump "A" A Impeller replacement in progress with 48 hours to complete, have done 12 hours so far.
3. Turnover that the "B" B S/G rad monitor is OOS.

DOS.

4. Painting in the area of the TD AFW pump.
5. Senior Resident is Walking down the CVCS system with system engineer.

Event Malt. Event Event No. No. Type* Type* Description 1 1 BOP The BOP will place the second feed water pump in service (N) lAW XXXX. Once the pump is in service and reported to the SRO that it is in service and the master controller is controlling both S/Gs proceed to the next event. This event should be set up just as the feed pump is ready to be paralleled_to_the_other paralleled to the other feed_pump_to_save_time. feed pump to save time. 2 RO (I) Power Range Channel N44, Failure, with the failure of the SRO rods to move in the incorrect direction. In this case the rods, (TS) will move in the inward direction. This may need an over ride of some sort to be able to do this. Use the transmitter that is associated associated with the controlling channel. Make Make sure this will not not cause aa reactor trip. Trouble shooting this event event for the rest of of the scenario. Use turbine turbine load to control tave tref mismatch_or_with_boration. mismatch or with boration. 33 BOP (I) Feedwater FlowFlow transmitter transmitter (476) (476) Failure, Failure, Failing Failing closed, closed, slowly, slowly, aa ramp atat approximately mi.nutes from full open approximately 33 minutes open toto closed, this 50% closed, 50% this will will be be mitigated mitigated by taking the by taking the automatic automatic controller to to manual. manual. 44 BOP BOP Running Running EH EH pump pump trips. trips. (Must (Must manually manually start start other other pump) pump) (C) (C) 55 RO (I) RD (I) Pressurizer Pressurizer pressure pressure channel channel 444 444 failure, failure, High. High. Control Control

Facility: Facility: No.: Scenario No.: 2 __..._____ Op-Test No.: No.: _1 Examiners: Operators: Initial Conditions: AT approximately 45 % power and increasing. Turnover: At the point of the GOP when the second feed water pump is going to be placed in service. The crew is to place the B Main Feed Water Pump in service lAW XXXX. Thunder storms in the area, severe weather check list being implemented.

1. A, Small tube leak, approx. 8 gpd. MAL-RCSOO2A S/G "A," MALRCSOO2A
2. Motor Driven AFW Pump "A" A Impeller replacement in progress with 48 hours to complete, have done 12 hours so far.
3. Turnover that the "B"B S/G rad monitor is OOS.
4. Painting in the area of the TD AFW pump.
5. Senior Resident is Walking down the CVCS system with system engineer.

Event Maif. Malt. Event Event No. No. Type* Type* Description Descripton SRO severity to prevent a trip. Adjust as necessary to allow a (TS) PORV to look like its closed but, in fact it is not, this would required the operators to determine that the block valve would need to be isolated. 6 All Small steam line break occurs, to allow determination for a SRO reactor shut down requirement. Run this until the team (TS) realizes a reactor trip is going to happen. This should not be R:o ,\ 1 (f?,). I) dont have to do a reactivity to fast but fast enough that we don't controls evolution. When the reactor is tripped it will not trip,

                       ~Df{f'I) p(,q)        ATWT, since ROD control is backwards, and not fixed from event 2, the crew may elect to not drive rods or they may try the opposite way in order to get rods to move. In any event, they must get the outside operator to trip the Reactor trip breakers ASAP.

7 MAL- All-(M) AII-(M) Just before the reactor is tripped locally, a large main steam MSSOO line break occurs on the C Steam Generator, up stream of 3C the MSIVs. All MSIV do not automatically isolate upon the appropriate signal. A full manual isolation will occur when the appropriate hand switches have been manipulated. The isolation valves from feed water do not isolate automatically (adding energy to the containment), requiring the manual isolation of those feed water valves. Following_to_the_Major_event. Following to the Major event.

                                                    "B" train Containment Spray pump to operate Failure of the B automatically. Will manually start.

Facility: Scenario No.: 2 __.... Op-Test No.: - 1 _i_____ Examiners: Operators: Initial Conditions: AT approximately 45 % power and increasing. Turnover: At the point of the GOP when the second feed water pump is going to be placed in service. The crew is to place the 8 B Main Feed Water Pump in service lAW XXXX. Thunder storms in the area, severe weather check list being implemented.

1. A, Small tube leak, approx. 8 gpd. MAL-RCSOO2A S/G "A,"
2. Motor Driven AFW Pump "A" A Impeller replacement in progress with 48 hours to complete, have done 12 hours so far.
3. Turnover that the "8" B S/G rad monitor is OOS.
4. Painting in the area of the TD AFW pump.
5. Senior Resident is Walking down the CVCS system with system engineer.

Event Malt. Malf. Event Event No. No. Type* Type* Description A train of Containment Spray, the flow meter will read The "A" with Zero or NO flow. Building CoolinQ Will have to manually start a Reactor 8uildinQ Cooling Unit.

    • (N)ormal, (R)eactivity, (l)nstrument, (I)nstrument, (C)omponent, (M)ajor

No.: Op-Test No.: No.: Scenario No.: Event No.: Event No.: Page _of Page_. of

Description:

Event

Description:

Time Position [ Applicants Actions or Behavior I IBOP IPlace B FPT SPEED CONTROL in Cascade Mode I SOP-210 Place B FPT SPEED CONTROL in Cascade Mode as as follows:

1) Increase the MASTER SPEED CNTRl (MOB mla CNTRL (MCB rn/a station) in MAN until the Feed Pump Purnp speed demand, as indicated on SCY-509C, is between 4100 rpm rprn and 5000 rpm (indicated on GRAPHIC 310 screen only). (PEER D) H)
2) Adjust the SP value (up and down arrows) on B FPT SPEED CONTROL until turbine RPM is within 25 rpm of SCY-509C rpm (indicated on GRAPHIC 310 screen only).
3) Click on the C icon on the B FPT SPEED CONTROL (S icon) face plate.

BOP Stop TPP22B-PP2, AUX OIL PP, and return the switch to AUTO.(PEER D) H) BOP Stop Feedwater Pump B TURN GEAR and return switch to AUTO. (PEER D)H) BOP If With more than one Main Feedwater Pump is operating, perform the following for the pump being placed in service:

a. Adjust the setpoint potentiometer dials on PUMP B B SPEED CNTRl CNTRL (MCB MIA station) as necessary to (MOB M/A maintain all operating Feedwater Pumps within 120 RPM of each other.

15%, close MOV-1

b. When plant load is greater than 15%, MOV -

5(B) TURB DRN VLV VlV (MOB). (MCB).

t'a FWP in service event.

End of placing 2

Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: Event No.: Event No.: Page _ _ o Page of f _ Event

Description:

Event

Description:

Time Time Position Position Applicants Applicants Actions or or Behavior Behavior AOP 401.3 FT-477 STEAM FLOW FAILURE. FAIL URE. Enter AOP-401.3. A OP-40 1.3. First 77 steps are Immediate Operator Actions. FCV-478 will travel closed. Alarm XCP-624, 4-4 SG A FWF>STF MISMA TCH BOP 11 Verify the failed channel is the controlling channel. BOP 2 Select the operable flow channel:

                                   *. Place FW CONTROL CHANNEL SEL Switch to the operable channel.
                                   *. Place STEAM CONTROL CHANNEL SEL Switch to the operable channel CRS/BOP         3 Verify Turbine Load'isLoad is LESS THAN 950 MWe CRS/BOP         4 Verify only one SG is AFFECTED CNU~al Critipal     CRS/BOP         5 Adjust the Feedwater Flow Control Valve as necessary to restore feed flow to the AFFECTED SG.

CRS/BOP 6 Restore Narrow Range level in all SGs to between 60% and 65%. CRS/BOP CRS/BOP 77 Check ifif Feedwater Feedwater Pump speed control is is operating properly:

                                 .* Feedwater Feedwater Header Header pressure is   is GREATER GREATER THAN THAN Main Steam Main   Steam Header Header pressure
                                 .* Feed Feed flow isis normal normal for steam steam andand flow and and power power level level
                                 .* All    operating Feedwater Pump All operating               Pump speeds speeds and and flows are_balanced are balanced CRS/BOP CRS/BOP       88 Verify Verify Narrow      Range level Narrow Range     level in in all all SGs SGs is is normal.

normal.

Op-Test No.: Scenario No.: Event No.: Page _ _ of Event

Description:

Time Position Applicants Actions or Behavior CRS/BOP 9 Restore the AFFECTED SG control systems to normal:

                                *. Place the Feedwater Flow Control Valve in AUTO
                                *. Place the Feedwater Pump Speed Control System in AUTO. REFER' REFER TO SOP-210, FEEDWATER SYSTEM CRS            10 Within six hours, place the failed failed' channel protection bistables in a ' tripped condition:
a. Identify the associated bistables for the failed channel.

REFER TO ' Attachment 1.

b. Record the following for each associated bistable on SOP-401, REACTOR PROTECTION AND CONTROL SYSTEM, Attachment I:
                               *. Instrument.
                               *. Associated Bistable.
                               *. Bistable Location.
                               *. STPs.
c. Notify the I&C l&C Department to ' place the identified bistables in trip.

TS 3.3.1, Table 3.3-1, item 14 CRS/SE 11 Determine and correct the cause of the channel failure. No repair will occur for this event. End of FT-477 failure event. ARP 631 1-2 Running EHC pump trips event BOP A EHC Pump trips, Receives alarm XCP 631, 1-2, 1 -2, EHC FLUID PRESS LO, BOP reviews procedure and hands to CRS.

Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: Event No.: Event No.: Page Page _ _ oof f _ Event

Description:

Event

Description:

Time j Position Applicants Actions or Behavior Crew mayor may or may not reference SOP-222 SWITCHOVER OF THE EHC PUMPS for starting the idle EHC pump Critical C~itic~1 BOP/CRS Start the idle EHC pump.pump

           . BOP/CRS      Verify the following:
                               ** Starting amps decay off within 30 seconds.
                              *. The started pump discharge pressure is greater than 1550 psig as indicated at the EHC unit by HFPM-A OUTPUT PRESSURE or HFPM-B OUTPUT PRESSURE.
                              *. EHC header pressure is greater than 1550 psig as P1-5676, EHC FLUID PRESS PSIG.

indicated by PI-5676, BOP/CRS Place the previously running EHC pump switch in After-Stop. CRS may direct placing pump in PTL due to apparent motor failure. End of running EHC pump trips event. AOP-401 AOP-401.5 .5 Start of PT-444 Failure event. RO Receives annunciators XCP 616 2-3 PZR PRESS HI/LO, 6162-3 616 6162-5 2-5 PZR CNTRL PRESS HI, 616 4-4 PRT LVL LO/ 6164-4 LOI TEMP/PRESS/LVL/HI TEMP/PRESS/LVUHI Verifies PT-444 is failing high CRS Enters AOP-401 .5, Pressurizer Pressure Control AOP-401.5, Channel Failure. Verifies first 33 steps are are completed which are immediate actions. Critical RO 1.

1. Verify the PZR PORVs are closed:
                                ** PCV-445A. PWR  PWR RELIEF
                                .* PCV-445B.

PCV-445B. PWRPWR RELIEF

                                .__PCV-444B._PWR_RELIEF
  • PCV-444B. PWR RELIEF

Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: Event No.: Event No.: Page Page _ _ of of Event

Description:

Event

Description:

II Time Position Applicants Actions or Behavior RO 2. Compare the PZR control channel indication to the protection channel indications:

                                   *
  • PI-455.
                                        . P1-455. PRESS PSIG
  • P1-456. PRESS PSIG
                                       *. PI-456.
                                   *.
  • PI-457.
                                        . P1-457. PRESS PSIG RO                            P1-444. CNTRl
3. Check if PI-444. CNTRL CHAN PRESS PSIG is NORMAL Critical C~,iticpl CRS/RO 3. IF PT-444 failed, then perform the following:

a) Ensure the PZR Spray Valves are closed:

                                  *
  • PCV-444C. PZR SPRAY
                                  **__._PCV-444D,_PZR_SPRAY
  • PCV-4440, PZR SPRAY b) Control PZR PRESS MASTER CONTROL in MAN.

c) Operate the PZR Heaters and Spray Valves in manual to control RCS pressure between 2220 psig and 2250 psig. d) Within one hour; close MVG-8000B. RELIEF 444 B ISOL. Per TS 3.4.4.b, must also remove power from block valve, XVG-8000B. CRS/RO 4. Check If P1-445. PI-445. CNTRL CNTRl CHAN PRESS PSIG, indication is NORMAL CRS/RO 5. Ensure ROD CNTRL CNTRl BANK SEL SEl Switch is In AUTO. CRS/RO 6. Maintain RCS pressure between 2220 pslg and 2250 psig.

Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: Event No.: Event No.: Page _ _ o Page of f _ Event

Description:

Event

Description:

Time Position Applicants Actions or Behavior CRS/SE 7. Determine and correct the cause of the channel failure. No repair will occur for this event. CRS Reference TS 3.4.4.b. for PORV failure. Must remove power from block valve in this case. End of PT-444 failure eventevent.... AOP-401.1O AOP-401.10 Start of N-44 Failure and Rods Fail To Move event. Crew should enter:

                               *. AOP-401.10 AOP-401. 10 for N-44 Failure (steps 1&2 are immediate actions).
                               *. AOP-403.4    for Stuck Control Rods (steps 1&2 actions)....

are immediate actions) RO should notice notice_rods_did rods did not movemove_when_N-44 when N-44 failed. RD RO N-44 starts failing hi, the following alarms are received: XCP 6201-1 620 1-1 PR HI SETPT FLUX HI XCP 620 1-4 PR CHAN DEV XCP 620 1-5 PR UP DET FLUX HI DEV AUTO DEFEAT XCP 620 1-6 PR LO DET FLUX HI DEV AUTO DEFEAT RD RO 1. Verify normal indication on Power Range Channel N-44. IF Power Range Channel N-44 has failed, THEN place the ROD CNTRLCNTRl BANK SEL SEl Switch in MAN. RD RO 2. Stabilize any plant transients in progress. CRS/RO 3. Maintain stable plant conditions CRS/RO 4. Verify no testing .is .is in in progress on the operable Power Range channels. CRS/RO S. Place ROD STOP BYPASS Switch for the failed 5. Power Power Range channel in in BYPASS.

Op-Test No.: Scenario No.: Event No.: Page _ _ of Event

Description:

Time Position Applicants Actions or Behavior CRS/RO 6. Verify the appropriate Rod Stop Bypass status light is lit:

                               *. For N-44, B2 OP ROD STOP BYP (XCP-6111 (XCP-61 11 4-4).

CRS/RO 7. Adjust Control Rods to maintain Tavg within l.O°F 1.0°F of Trcf The empty fuse holders should NOT be reinstalled as this will allow a small amount of current flow through the blown fuse indicator CRS/RO 8. Deenergize the failed Power Range channel: .

                              ** Remove the CONTROL POWER fuses from the POWER RANGE A drawer of N-44.
                              *. Remove the INSTR POWER fuses from the POWER RANGE B drawer of N-44.

CRS/RO 9. Align the Power Range channel comparator circuits:

a. Place the following switches to the failed Power Range channel (N-44) position:
                                 *. COMPARATOR CHANNEL DEFEAT Switch (on the COMPARATOR AND RATE drawer)
                                 *. UPPER SECTION Switch (on tre   the DETECTOR CURRENT COMPARATOR drawer)
                                *. LOWER SECTION Switch (on the DETECTOR CURRENT COMPARATOR drawer).

CRS/RO CRS!RO 10. Ensure NR-45 is selected to the appropriate operable channels. CRS/SE 11. Within six hours, place the failed channel

No.: Op-Test No.: Scenario No.: Event No.: Page _ _ of Event

Description:

Event

Description:

Time Position Applicants Actions or Behavior protection bistables in a tripped condition:

a. Identify the associated bistables for the failed channel (N-44). REFER to Attachment 1.
b. Record the following for each associated bistable on SOP-401, REACTOR PROTECTION AND CONTROL SYSTEM, Attachment I:
                              *. Instrument
                              *. Associated Bistable
                              *. Bistable Location.
                              ** STPs.
c. Notify the I&Cl&C Department to place the identified bistables in trip.

CRS/RO 12. Verify Reactor Power is lESS LESS THAN 75%. CRS 13. Refer to Tech Spec 3.3.1. CRS/SE 14. Determine and correct the cause of the Power Range channel failure. Cause of failure will not be determined for this event. AO P-403.4 AOP-403.4 CRS Following are the actions for Failure of Control Rods to Move. Steps 1 & 2 are immediate actions. This event will 1& be occurring simultaneously with the N44 failure so the crew will be forced to prioritize between the two AOPs RO 1. The ROD CNTRL

1. eNTRl BANK SEL SEl Switch is already in MAN RO 2. Main Turbine load is already stabilized

Op-Test No.: Op-Test No.: Scenario No.: Event No.: Page _ _ of Event

Description:

Event

Description:

Time Position Applicants Actions or Behavior CRS/RO 3. Stop any boration or dilution in progress CRS/RO 1. Adjust Control Rods to maintain Tavg within 1.0 degrees of Tref. Since Control Rods will NOT move, THEN perform the following:

                              *. Adjust Main Turbine load until Tavg is within 5 degrees of Tref
                              *. Initiate GTP-702, Attachment IV.A, INOPERABLE CONTROL ROD Critical     CRS                                            3.3.3.1.0 which will require a CRS evaluates Tech Specs 3.3.3.1.C following:

plant shutdown, then performs the followinq: SE a. Notify the following plant personnel;

                                        *. Management Duty Supervisor
                                        *. Reactor Engineering BOP               b. Decrease Main Turbine Load to 50 MW at a rate determined by the Shift Supervisor. (Refer to GOP-4,_POWER GOP-4,              OPERATION,_MODE_1)

POWER OPERATION, MODE 1) BOP/RO BOP/RO' c. Maintain Tavg within 5 degrees of Tref using the following:

                                       .* Main Turbine Load adjustment
                                       .* RCS Boration. Refer to SOP-106, REACTOR_MAKEUP REACTOR MAKEUP WATER SYSTEM While attempting to lower load, the SMALL STEAM LEAK will initiate. A MANUAL Rx    Ax Trip may be initiated due to degrading plant conditions. RX WILL NOT TRIP.

Approximately 20 minutes later LARGE STEAM BREAK. Should receive the following annunciators: XCP 606 2-2 RBCU 1A/2A 6062-2 1A12A DAN DRN FLO HI XCP 607 2-2 RBCU 1B/2B 6072-2 1BI2B DAN DRN FLO HI DNB TS 3.2.5 for low PZR Pressure will occur. (2206 psig) psig)

Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: Event No.: Event No.: Page _ _ of Page of

Description:

Event

Description:

Event Time Position Position Applicants Actions or Applicants or Behavior Behavior } EOP-1.O & EOP-13.0 EOP-1.0 EOP-13.O Crew will enter EOP-1.0.Step Crew EOP-1.0 Step 11 and transition to EOP-EOP 13.0 since Rx 13.0 Ax will not trip. EOP 13.0 1&2 are 13.0 Steps 1&2 immediate actions. RO 1. Verify Reactor Trip SINCE the Reactor will NOT trip NOR is subcritical, THEN insert Control Rods. SINCE Control Rods will NOT insert THEN Trip the ATTACHMENT 1, TRIPPING THE Reactor per ATIACHMENT REACTOR LOCALLY. ' Critical. Critical, Note: At this point the conditions are met to declare an EAL classification of "Site Site Area Emergency". Emergency. This declaration can be made as a follow-up question at the completion of the scenario Critical BOP 2. Verify Turbine/Gen erator Trip: Turbine/Generator

a. Verify all Turbine STM STOP VLVs are closed.
12. Ensure Generator Trip (after 30 second delay):

12.

1) Ensure the GEN BKR is open.

1)

2) Ensure the GEN FIELD BKR is open.
3) Ensure the EXC FIELD CNTRL is tripped.

ALL 3. Ensure EFW Pumps are running:

a. Ensure both MD EFW Pumps are running.
b. Verify the TD TO EFW Pump is running if necessary to maintain maintain SG SG levels.

levels. Critical ALL Initiate emergency

4. Initiate
4. boration of emergency boration RCS:

of the RCS: (Not if SI in progress)

a. Ensure at least one Charging Pump is running.

a._Ensure_at_least_one_Charging_Pump_is_running.

Op-Test No.: Scenario No.: Scenario No.: Event No.: Page _ _ of Event

Description:

Event

Description:

[ Time Position Applicants Actions or Behavior

b. Verify PZR pressure is LESS THAN 2335 psig.
c. Verify SI ACT status light is NOT lit.
d. Open MVT-81MVT-8104, 04, EMERG BORATE.
e. Verify XPP-13B, BA XFER PP B, is running.
f. Verify GREATER THAN 30 gpm on FI-110, Fl-i 10, EMERG BORATE FLOW GPM.

If an SI signal exists or occurs, Steps 11 through 8 of EOP-1O, REACTOR TRIP/SAFETY INJECTION EOP-1.0, ACTUATION, should be performed to verify proper SI actuation, while continuing with this procedure. CRS may hand BOP EOP-1.0 EOP- 1.0 while continuing with wIth EOP- 13.0 EOP-13.0 ALL 12. Verify Containment Ventilation Isolation Valves closed by verifying the following SAFETY INJECTION monitor lights are dim:

                                   *. XCP-6103 3-4 (POST ACCID HR EXH 6057 &           &

6067)

                                  *.           03 2-1 (POST ACCID HR EXH XCP-61032-1 XCP-61 6056/6066).

Critical At this point the building operator is successful at getting the RTBs open locally ALL 6. Verify the Reactor is subcritical:

a. Power Range channels indicate LESS THAN 5%.
b. Intermediate Range channels indicate a negative startup_rate.

startup rate.

Op-Test No.: Scenario No.: Event No.: Page _ _ o of f _ Event

Description:

Event

Description:

Time Position Applicants Actions or Behavior 12.GO TO Step 15. Observe the CAUTION' CAUTION prior to Step 15. This is a continuous action step. Should have the Rx Tripped locally by time arriving at this step. ALL 15. Return to procedure and step in effect. EOP-1 .0 EOP-1.0 EOP- 1.0 Returns to EOP-1. 0 Step 1. Large Steam Break should occur at this time. Most Likely an AUTO SI will occur prior to MANUAL actuation due to size of steam break. RO 1. Verify Reactor Trip:

                                 *. Trip the Reactor using either Reactor Trip Switch
                                 *. Verify all Reactor Trip and Bypass Breakers are open.
                                 *. Verify all Rod Bottom Lights are lit.
                                 *. Verify Reactor Power level is decreasing.

BOP 2. Verify Turbine/Generator Trip:

a. Verify all Turbine STM STOP VLVs are closed.
b. Ensure Generator Trip (after 30 second delay):
1) Ensure the GEN BKR is open.
2) Ensure the GEN FIELD BKR is open.
3) Ensure the EXC FIELD CNTRL is tripped.

BOP 3. Verify both ESF buses are energized. I* ALL 4. Check if SI is actuated:

a. Check if either:
                                    .* SI ACT status light is bright on XCP-61 07 1-1.

1-1 . OR

                                   .* Any red first-out SI annunciator is lit on XCP XCP-626 top row. '
b. Actuate SI using either SI ACTUATION Switch.

GO TO_Step TO Step 6.

Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: Event No.: Event No.: Page Page _ _ ofof Event

Description:

Event

Description:

Time Position Applicants Actions or Behavior ALL 5. Check if SI is required:

a. Check if any of the following conditions exist:
                               *. PZR pressure LESS THAN 1850 psig.

OR

                               *. RB pressure  GREATER THAN 3.6 psig.

OR

                               ** Steamline pressure LESS THAN 675 psig.

OR

                               *. Steamline differential pressure GREATER THAN 97psid.

97 psid.

b. Actuate SI using either SI ACTUATION Switch.

Critical CRS/BOP 6.Complete ATTACHMENT 3, SI EQUIPMENT VERIFICATION. RO Notes that RBCU XFN-0064B did not auto start in SS on the SI and manually starts XFN-0064B CRS/SE 7. Announce plant conditions over the page system. CRS/RO 8.Verify RB pressure has remained LESS THAN 12 a.Verify psig_on_PR-951,_RB_PSIG_(P-951),_red_pen. psig on PR-951, RB PSIG (P-951), red pen. RO 8 Perform the following: a) Verify both the following annunciators are lit: XCP-612 3-2 (RB SPR ACT). XCP-612 4-2 (PHASE B B ISOL). IF either annunciator is NOT lit, THEN actuate RB Spray by placing the following switches to ACTUATE: Both CS-SGA1 CS-SGA 1 and CS-SGA2. OR Both CS-SGB1 and CS-SGB2. MVG-3003A(B),_SPRAY_HDR_ISOL_LOOP MVG-3003A(B), SPRAY HDR ISOL LOOP A(B). RO b) Verify Phase BB Isolation by ensuring RB PRAY/PHASE PRA Y/PHASE B B ISOL ISOL monitor monitor lights lights are bright on XCP XCP-6105. RO Ensure the following are open: c) Ensure MVG-3001A(B), MVG-3001A(B), RWST TO SPRAY PUMP A(B) SUCT. SUCT.

Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: Event No.: Event No.: Page Page _ _ of of

Description:

Event

Description:

Event [ Time Time Position Position Applicants Applicants Actions MVG-3002A(B), NAOH MVG-3002A(B), Actions or NAOH TO or Behavior Behavior TO SPRAY SPRAY PUMP PUMP A(B) SUCT. RO d) Ensure both RB Spray Pumps are running Of (If the RO already done sOz has not alread'/.. so, at this l2.oint point thethe RO manually starts the "B" manuall'/.. B RB Sl2.ra'/..l2.uml2. Spray pump that did not auto start on the Phase B isolation sianal.J signal.) RO e) Verify RB Spray flow is GREATER THAN 2500 gpm for each operating train on FI-7368, SPR PP A DISCH FLOW GPM. Fl-7378, SPR PP B DISCH FLOW GPM. FI-7378, point the RO notes that there is no flow (At this l2.oint Fl-7368 but that all other indications are indicated on FI-7368 diagnoses it as a failed indicator.) normal and diaanoses indicatorj Critical RO f) Stop all RCPs (if not already stopped on <1400 ;psig psig and SI flow). CRS/RO 9.Check RCS temperature:

                                  *. With any RCP running, RCS Tavg is stable at OR trending to 557F 557"F OR
                                  *. With no RCP running, RCS Tcold is stable at OR 557F.

trending to 557"F. IF RCS temperature is LESS THAN 557F 557"F AND decreasing, THEN: a) Place the STM DUMP CNTRL Controller in MAN and closed. b) Place the STM DUMP MODE MODE SELECT Switch in STM PRESS.PRESS. c) Ensure all Steamline PORV5PORVs and Condenser Steam Dumps are closed. Dumps d) d) IF RCS cooldown continues, IF RCS continues, THEN: THEN: (Could get get red path_on_EOP-path on EOP-1S.0 throttle_too 15.0_ififthrott/e too

Op-Test No.: Scenario No.: - - - - - - Event No.: .- - - - - Page _ _ of _~I Event

Description:

Time Position Applicants Actions or Behavior much)

1) IIFF Narrow Range SG level is LESS THAN 30%

[50%] in all SGs, THEN reduce EFW flow as necessary to stop the cooldown, while maintaining total EFW flow GREATER THAN 450 gpm.

2) WHEN Narrow Range SG level is GREATER THAN 30% [50%] in at least one SG, THEN control EFW flow as necessary to stabilize RCS temperature at 557F.

557"F.

3) IF RCS cooldown continues, THEN close:
  • MS Isolation Valves, PVM-2801A(B)(C).
  • MS Isolation Bypass Valves, PVM-2869A(B)(C).

IF ReS RCS temperature is GREATER THAN 557"F 557F AND increasing, THEN: a) Verify PERMISV PERM ISV C-9 status light is bright on XCP XCP-6114 1-3. b) IF the Condenser is available, THEN ensure Condenser Steam Dump Valves are open. c) IF the Condenser is NOT available, THEN open the Steam PCV-2000(20 10) (2020): line PORVs, PCV-2000(2010)(2020): Steamline

1) Place the PWR RELIEF A(B)(C) SETPT 1)

Controllers in MAN and closed. Steam line Power Relief A(B)(C) Mode Place the Steamline Switches in PWR RLF.

Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: Event Event No.: No.: Page Page _ _ ofof Event

Description:

Event

Description:

Time Time Position Position Applicants Actions Applicants Actions or or Behavior Behavior

3) Adjust the PWR RELIEF A(B)(C) SETPT Controllers as necessary to reduce RCS temperature.

Ciritical Critical BOP By step 9 in EOP-1.0 EOP-tO the faulted SG should have been diagnosed as "c" C and EFW to "c" C SG should be secured (FCV closed) (OAP-103.4) (OAP-103A) CRS/RO 10. Check PZR PORVs and Spray Valves:

a. PZR PORVs are closed.
b. PZR Spray Valves are closed.

c.Verify power is available to at least one PZR PORV Block Valve:

                                   *. MVG-8000A, RELI  RELIEFEF 445 A ISOL.
                                   *. MVG-8000B, RELIEF 444 B ISOL.
                                   *. MVG-8000C, RELIEF 445 BISOL. B ISOL.

d.Verify at least one PZR PORV Block Valve is open. OPEN one Block Valve unless it was closed to isolate an open PZR PORV. CRS/RO 11. Check if RCPs should be stopped: a.Check if either of the following criteria is met:

                                 .* Annunciator XCP-612 4-2 is lit (PHASE B         B ISOL).

OR

                                  .* RCS pressure is LESS THAN 1400        1400 psig AND SI flow is indicated on Fl-943, FI-943, CHG LOOP B     B CLD/HOT LG FLOW GPM.

Stop all RCPs (already stopped).

b. Stop CiitaL C~:ijC.,8L CRS/BOP CRS/BOP 12.
12. Verify no no SG SG is is FAULTED:
                                .*     No No SG   pressure is SG pressure    is decreasing decreasing in   an uncontrolled in an  uncontrolled

No.: Op-Test No.: Scenario No.: No.: Event Event No.: Page _ _ of of_ Event

Description:

Time Position manner. Applicants Actions or Behavior ]

                                    . No SG is completely depressurized.

depressurized . GO TO EOP-3.O,EOP-3.0, FAULTED STEAM GENERATOR ISOLATION, Step 1. will leave this procedure and transition to EOP-3.O, Crew will/eave EOP-3.0, step 1. EOP-3.0 EOP-3.O CRS/BOP 1. Ensure all the following are closed:

                               *. MS Isolation Valves, PVM-2801 PVM-2801A(B)(G).

A(B)(G).

                              *.       MS Isolation Bypass Valves, PW-2869A(B)(C).

ALL 2. Check if any SG is NON-FAULTED:

                                 *..                                        increasing..

Pressure in any SG is stable or increasing

  • Any SG is not completely depressurized ALL 3. Identify any FAULTED SG(s):
                               *. Any SG     SO pressure decreasing in an uncontrolled manner.

OR

                              *.       Any SGSO is NOT completely depressurized CRS/BOP       4. Close the following valves for each FAULTED SG:
                              *.       FW Flow Control FCV        -498 FCV-498
                              *.       FW Isolation, isolation, PVG-1611C
                              *.       SG Blowdown. PVG-503C
                              *.       FW Flow Control Bypass FCV    FCV-3341
                                                                         -3341 ALL           5. Complete the isolation of each FAULTED SG:
a. Close SG Chemical Feed Isolation, MVK-1633C a._Close_SG_Chemical_Feed_Isolation,_MVK-1633C

Op-Test No.: Scenario No.: - - - - - - Event No.: ----- Page _ _ o of f _ Event Event

Description:

Description:

Time Position Applicants Actions or Behavior

b. Close MS Drain Isolation PVT-2843C
c. Close MS Drain Isolation, PVT-2877B for SG C.
d. Place the Steamline PWR RELIEF C SETPT Controller in MAN and closed.
e. Place the Steamline Power Relief C Mode Switch in PWR RLF
f. Close FCV-3551 MD EFP TO SG C
g. Close FCV-3556 TD EFP TO SG C XVGO1 01 7C-EF SG C
h. Locally unlock and close XVG01017C-EF MTR DR EF PUMP SUPPLY HEADER VALVE (I B-423).

(IB-423). XVKO1019C-EF

i. Locally unlock and close XVK01 019C-EF SG C MTR DR EF PUMP SUPPLY STOP CHK VLV (IB-423).
j. Locally unlock and close XVG01 018C-EF 01 8C-EF SG C TURB DR EF PUMP SUPPLY HDR VALVE (lB-423). (IB-423).
k. Locally unlock and close XVKO1O2OC-EF XVK01020C-EF SG C TURB DR EF PUMP SUP STOP CHK VALVE (IB-423)

I. Close and locally deenergize the appropriate valve if SG B BorSGCis or SG C is FAULTED:

  • ForSGC:

For SG C:

1) Open XMCIDB2Y O5EH.
1) OSEH.

EMERG FEEDWATER PUMP MAIN STEAM BLOCK XVG28O2B-MS XVG2802B-MS (AB-463).

2) Close MVG-2802B MS LOOP C TO TD EFP

Op-Test No.: No: Scenario No.: Event No.: Page _ _ of Event

Description:

Event

Description:

Time Position Applicants Actions or Behavior Critical BOP Faulted SG is Isolated ALL 6. Check if Secondary radiation levels are normal:

a. Check radiation levels normal on all unisolated radiation monitors:
                                  *. RM-G19C STMLN HI RNG GAMMA.
                                  *. RM-L3, STEAM GENERATOR BLOWDOWN LIQUID MONITORMONITOR..
                                * . RM-LiO.
                                 .    . RM-LIO. SG BLOWDOWN CW DISCHARGE LIQUID MONITOR.
                                *. RM-A9, CNDSR EXHAUST GAS ATMOS MONITOR.
b. Notify Chemistry to sample all SG secondary sides and screen samples for abnormal activity using a frisker.

ALL 7. Check if SI flow should be reduced: Tl-499A(B), A(B) TEMP OF is subcooiing on TI-499A(B),

a. RCS subcooling GREATER THAN 30F.

30"F.

b. Secondary Heat Sink is adequate:
                                *. Total EFW flow to INTACT SG5     SGs is GREATER THAN 450 gpm.

OR

                                . Narrow Range level is GREATER THAN 30%

[50%] in at least one INTACT SG.

c. RCS pressure is stable OR increasing.
d. PZR level is GREATER THAN 18% 18% [38%j

[38%] (IF PZR LEVEL < < 18%[38%J, 18%[38%], THEN transition to EOP EOP-2.0, see attachment of EOP-2.0 steps) CRS/RO 8. Reset both SI RESET TRAIN A(B) A(8) Switches. CRS/RO 9. Reset Containment Isolation:

                               .*    RESET PHASE A TRAIN A(B) CNTMT ISOL.

Op-Test No.: Scenario No.: Event No.: Page _ _ of Event

Description:

Time Position Applicants Actions or Behavior

                                *. RESET PHASE B     B TRAIN A(B) CNTMT ISOL.

CRS/BOP 10. Place both ESF LOADING SEQ A(B) RESETS to:

a. NON-ESF LCKOIJTS.
b. AUTO-START BLOCKS.

CRS/RO 11. Establish Instrument Air to the RB:

a. Start one Instrument Air Compressor and place the other in Standby.
b. Open PVA-2659, INST AIR TO RB AIR SERVo SERV.
c. Open PVT-2660. AIR SPLY TO RB CRS 12. GO TO EOP-1.2, SAFETY INJECTION TERMINATION, Step 1.

Examiners may wish to end scenario at this point point, but have included some actions from EOP-1.2 if needed. EOP-2.O, EOP-2.0 If previously entered EOP-2.0, EOP-2.O will transition back to EOP-1.2. V EOP-1.2 CRS/RO a. Stop all but one Charging Pump and place in Standby. CRS/RO b. Verify ReS RCS pressure is stable OR increasing. CRS/RO 3. Establish Normal Charging:

a. Close FCV-122, CHG FLOW.
b. Open both MVG-8107 and MVG-81 MVG-8108,08, CHG LINE ISOL.
c. Adjust FCV-122, CHG FLOW, to obtain 60 gpm c._Adjust_FCV-122,_CHG_FLOW,_to_obtain_60_gpm

Op-Test No.: Scenario No.: Event No.: Page _ _ of Event

Description:

II Time Position Applicants Actions or Behavior Charging flow.

c. Close both MVG-8801A(B), HI HEAD TO COLD LEG INJ CRS/RO d. Control FCV-122, CHG FLOW, to maintain PZR level.

Critical Critical. RO SI terminated and normal charging restored. CRS/RO 5. Check if RHR Pumps should be stopped:

a. Check if any RHR Pump is running with suction aligned to the RWST.
e. Stop any RHR Pump which is running with suction aligned to the RWST and place in Standby.

CRS!RO CRS/RO f. Verify SI flow is NOT required: Tl-499A(B), A(B) TEMP "F,

g. RCS subcooling on TI-499A(B), F, is GREATER THAN 30"F 30F
h. PZR level is GREATER THAN 18% [38%].

CRS/RO 7. Check if RB Spray should be stopped:

a. Check if any RB Spray Pumps are running.
b. Verify RB pressure is LESS THAN pressure is LESS
  • THAN 111 1 psig.
c. Depress both RESET TRAIN A(B) RB SPRAY.
i. Verify EOP-14.0, EOP-14.O, RESPONSE TO INADEQUATE CORE COOLING, has NOT been implemented.

CORE_COOLING,_has_NOT_been_implemented.

Op-Test No.: No.: _ _ _ Event No.: _ __ Scenario No.: Page _ _ of _ - - I I Event

Description:

Description:

Time Position Applicants Actions or Behavior

e. Stop both RB Spray Pumps and place in Standby.
f. Close MVG-3003A(B), SPRAY HOR HDR ISOL LOOP A(B).

CRS/RO 9. Check if Letdown can be established:

a. Verify PZR level is GREATER THAN 30% [50%]
b. Establish Normal Letdown:
1) Adjust FCV-122, CHG FLOW, to obtain 60 gpm Charging flow.
2) Set PCV-145, LO PRESS LTON, LTDN, to 70%.
3) Open TCV-144, CC TO LTON LTDN HX.
4) Open PVT-8152, L LTDN TON LINE ISOL.
5) Open both LCV-459 and LCV-460, LTON LTDN LINE ISOL.
6) Open desired Orifice Isolation Valve(s) to obtain 60 gpm to 120 gpm:
  • LTDN ORIFICE A ISOL (45 PVT-8149A, LTON gpm).
  • PVT-8149B, LTDN LTON ORIFICE B B ISOL (60 gpm).
  • PVT-8149C, LTDN LTON ORIFICE C ISOL (60 gpm).
7) Adjust FCV-122, CHG FLOW, to maintain TI-140, 140, REGEN HX OUT TEMP F, <IF, between 250F 250"F and 350"F while maintaining PZR level.

350F

8) Adjust PCV-145, LO PRESS LTDN, LTON, to maintain

Op-Test No.: Op-Test No.: Scenario Scenario No.: No.: Event No.: Event No.: Page Page _ _ of of_ Event

Description:

Event

Description:

Time Position Applicants Actions or or Behavior Behavior P1-i 45, LO PRESS LTDN PRESS PSIG, PI-145, between 300 psig and 400 psig.

9) Place PCV-145, LO PRESS LTDN, in AUTO.
10) Place TCV-144, CC TO LTDN HX, in AUTO.

10) CRS/RO CRS!RO 9. Check the Reactor Makeup System: FCV-113

a. Set FCV-1 13 A&B, BA FLOW, Controller to 8.6.
j. Ensure the Reactor Makeup System is in AUTO.

CRS/RO 10. Transfer Charging Pump suction to the VCT: LCV-1 1 5C(E), VCT OUTLET ISOL.

a. Open both LCV-115C(E),

LCV-1 15B(D), RWST TO CHG PP

k. Close both LCV-115B(D),

SUCT. Examiners should end scenario at this point as SI is now secured. EOP-2.0 (if necessarYl EOP-2.O {if necessary) EOP-2.O, Loss of The following are applicable steps of EOP-2.0, Reactor or Secondary Coolant. This would be entered if PZR Level was too low for EOP-1.2 transition. ALL 1. Check if RCPs should be stopped:

a. Check if either of the following criteria is met:
                               *. Annunciator XCP-612 4-2 is lit (PHASE B ISOL)  ISOL)..

OR

                               *. RCS    pressure is LESS THAN 1400 psig AND SI flow is indicated on FI-943, CHG LOOP B CLD/HOT LG FLOW GPM.
b. Sto~ all RCPs.

b._Stop_all_RCPs.

Op-Test No.: Scenario No.: Event No.: Page _ _ o of f _ Event

Description:

Time Position Applicants Actions or Behavior CRS/BOP 2. Verify no SG is FAULTED:

                                   *. No SG pressure is decreasing in an uncontrolled manner.
                                  *. No SG is completely depressurized.

CRS/BOP 3.. Check INTACT SG levels: 3.

a. Verify Narrow Range level in INTACT SGs is GREATER THAN 30% [50%].

I. Control EFW flow to maintain Narrow Range level in each INTACT SG between 40% [50%] and 60%. CRS/RO 4. Reset both SI RESET TRAIN A(8) A(B) Switches. CRS!RO CRS/RO 5. Reset Containment Isolation:

                                 *. RESET PHASE A -TRAIN A(B) CNTMT ISOL.
                                 *.__RESET_PHASE_B_-TRAIN_A(B)_CNTMT_ISOL.

RESET PHASE B -TRAIN A(B) CNTMT ISOL. ALL 6. Check if Secondary radiation levels are normal:

a. Check radiation levels normal on:
                                 *. RM-G19A(B)(C), STMLN HI RNG GAMMA.
                                 *. RM-A9, CNDSR EXHAUST GAS ATMOS MONITOR.
                                *. RM-L3, STEAM GENERATOR BLOWDOWN LIQUID MONITOR.
                                *. RM-L       10, SG BLOWDOWN CW DISCHARGE RM-L10, LIQUID MONITOR.
b. Place SVX-9398A(B)(C), SG A(B)(C) SMPL ISOL, in AUTO.
m. Notify Chemistry to sample all' all SG secondary sides and screen' screen samples for abnormal activity using a frisker.

CRS/RO 7. Check PZR PORVs and Block Valves:

a. Verify power is available to the PZR PORV Block a._Verify_power_is_available_to_the_PZR_PORV_Block

Op-Test No.: Scenario No.: - - - - - - Event No.: ----- Page _ _ of _--II Event

Description:

Time Time Position Applicants Actions or Behavior Valves:

1) MVG-8000A, RELIEF 445 A ISOL.
2) MVG-8000B RELIRELIEF EF 444 B ISOL.
3) MVG-8000C, RELIEF 445 B ISOL.

If any PZR PORV opens because of high PZR pressure, Step 7.b lb should be repeated after pressure decreases to LESS THAN 2300 p51g. psig, to ensure the PORV recloses.

b. Verify all PZR PORVs are closed.
c. Verify at least one PZR PORV Block Valve is open.

CRS/BOP 8. Place both ESF LOADING SEa SEQ A(B) RESETS to:

a. NON-ESF LCKOUTS.
b. AUTO-START BLOCKS.

CRS/R0 CRS/RO 9. Establish Instrument Air to the RB:

a. Start one Instrument Air Compressor and place the other in Standby.
b. Open PVA-2659, INST AIR TO RB AIR SERVo SERV.
c. Open PVT-2660, AIR SPL SPLYY TO RB.

ALL 10. Check if SI flow should be reduced:

a. RCS subcooling on TI-499A(B), A(B) TEMP "F, F, is GREATER THAN 30"F. 30F. *
b. Secondary Heat Sink is adequate:
                               *. Total EFW flow to INTACT SGs is GREATER THAN 450 gpm.

OR

                               *. Narrow Range level is GREATER THAN 30%

[50%] in at least one INTACT SG.

Op-Test No.: Scenario No.: _ _ _ Event No.: _ __ Page _ _ of _ - - I I Event

Description:

Description:

II Time [ Position Applicants Actions or Behavior

c. RCS pressure is stable increasing.

NOTE - Step 10.

                                         -         d 1O.d If PZR level is LESS THAN 18% [38%], [38%J, the PZR should refill from SI flow after pressure is stabilized.
n. PZR level is GREATER THAN 18% [38%]

18%[38%], then go to Step 11), (IF PZR still less than 18%[38%J, 1 1), if not then continue) GO TO Step 11. 1 1. EOP-l .2, SAFETY INJECTION

o. GO TO EOP-1.2, TERMINATION, Step 1.

ALL 11. Check if RB Spray should be stopped:

a. Check if any RSRB Spray Pumps are running
b. Verify RS RB pressure is LESS THAN 11 1 1 psig
c. Depress both RESET TRAIN A(B) A(S) RS I RB SPRAY.

NOTE-Step NOTE - Step 11.d

                                   *. RB Spray must run for a minimum of two hours.
                                   *. Anytime RB Spray Pumps are stopped, MVG-       MVG 3003A(B), SPRAY HDR ISOL LOOP (B), should be closed for containment isolation.
d. Consult with TSC personnel concerning RS RB Spray System operation.

CRS/RO 12. Check if RHR Pumps should be stopped:

a. Check RCS pressure:
1) RCS pressure is GREATER THAN 250 psig
2) RCS pressure is stable OR increasing.

Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: Event Event No.: No.: Page Page _ _ of of Event

Description:

Event

Description:

Time Time j Position Position Applicants Actions Applicants Actions or or Behavior Behavior

b. Check
b. Check ifif any any RHR RHR Pump Pump isis running running with with suction suction aligned to aligned the RWST to the RWST
c. Stop
c. Stop any any RHR RHR Pump Pump which is is running running with with suction suction aligned to the RWST aligned RWST and place place in in Standby.

Standby. CRS/RO 13. Check if RCSRCS pressure is stable OR decreasing. This would be This do loop" be a "do loop back to step step 11 until until PZR PZR Level Level was was greater than 18% than 18% [38%J [38%] RETURN TO Step 1. EOP-2.Ofor This is end of EOP-2.0 for this scenario.

Scenario Event Scenario Description VC Event Description VC Summer-200 Summer-2005-301 5-301 Facility: Facility: IVC Summer VC Summer I Scenario Scenario No.:No.: 33 Op-Test Op-Test No.: No.: 2005-301 2005-301 Examiners: Examiners: Operators: Operators: Initial conditions: Initial Conditions: The Unit The Unit is is at at 0% power in 0% power with aa MOL Mode 22 with in Mode startup in reactor startup MOL reactor in progress. progress. Turnover: Turnover: The previous The previous crew crew has initiated the has initiated startup per the reactor startup per XXX. Source range XXX. Source counts are range counts stable and are stable and Control bank Control 'c' isis presently bank C presently atat XX steps. 1/M XX steps. data now 11M data criticality at projects criticality now projects XX steps at XX steps on Control bank on Control bank

                'D'. Continue D. Continue with with the the reactor             beginning with startup beginning reactor startup                    with step  XX of step XX       XXX, and of XXX,           stabilize reactor and stabilize    reactor power power between 1-3%.

between 1-3%. The Severe The Severe Weather thunderstorms thunderstorms approaching. approaching. High winds are High winds are possible possible within the hour. within the hour. S/G A, SIG "A," Small Small tube leak, approx. approx. 88 gpd. Painting in the area of the TD TO AFW pump. Event Malf. No. I Maif. Event Event Description Description No. Position Type* RO R R Pull control rods to establish critical reactor. 1 BOP C C Train A Service Water Pump #A trips and standby pump needs to be started. Train.'A' 2 SRO (TS) RO II Controlling channel Pressurizer Level Transmitter fails low and UD LID isolates. 3 BOP N Re-establish letdown. 4 BOP II Steam Generator B ARV Pressure Transmitter fails high. 5 BOP/RO BOP / RO C C Letdown Letdown line break inside line break Containment inside Containment 66 SRO SRO(TS)(TS) RO RO C RCP High Vibration and seal failure when secured. RCP High secured. 77 ALL ALL M M Small Small break LOCA break LOCA 88 BOP BOP or or C C Safety Safety injection Train 'A' injection Train fails to A fails actuate and to actuate fails to HSI fails B HSI and 'B' automatically start to automatically when start when 99 RO RO safety safety injection manually initiated. injection isis manually The reactor initiated. The to automatically fails to reactor fails trip. automatically trip.

      *       (N)ormal, (N)ormal, (R)eactivity, (R)eactivity, (I)nstrument,         (C)omponent, (M)ajor (I)nstrument, (C)omponent,             (M)ajor

Scenario Event Description VC Summer-2005-301 Op-Test No.: Scenario No.: Event No.: Page _ _ of _ _ Event

Description:

Time Position Applicants Actions or Behavior I I I I GOP-3.0 GOP-3.O

q. Within 15 minutes before achieving criticality, verify Tavg I

551 °F. greater than or equal to 551°F.

r. Announce criticality over the page system.
s. Verify critical rod position is above the Rod Insertion Limit per 3.1 .3.6.

Tech Spec 3.1.3.6.

t. At the AUDIO COUNT RATE CHANNEL drawer, place the following switches in OFF:
1) AUDIO MULTIPLIER.
2) CHANNEL SELECTOR.

3.1 1 Increase Reactor Power to 10-3% as follows: / 3.11

a. Establish a stable Startup Rate of less than one decade per minute.
b. At 7.5x10-6%, perform the following:
1) Verify P6 Permissive energizes to bright.
2) Verify a minimum of one decade overlap between Source Range Channels and Intermediate Range Channels.

1 CPS, perform the following:

c. Prior to 10°
1) Momentarily place SR TRAIN A Switch in BLOCK.
2) Verify SR A TRIP BLCK Permissive energizes to bright.
3) Momentarily place SR TRAIN B Switch in BLOCK.
4) Verify SR B TRIP BLCK Permissive energizes to bright.
d. Select one Intermediate Range Channel and one Power Range Channel on NR-45, NIS RECORDER.

1 Q3%

e. Stabilize Reactor Power at 10.°%.

This ends the pull to criticality event. RO RD A SWP trips. RO RD responds to various alarms and references the ARP: XCP-604 1-2: SWP A/C AlC TRIP Appendix D, Page 39 of 39

Scenario Event Description VC Summer-2005-301 Op-Test No.: Scenario No.: Event No.: Page _ _ of _ _ Event

Description:

Time Position Applicants Actions or Behavior XCP-604 3-3: SW Sw CCW HX A FLO LOITEMPLO/TEMP HI XCP-604 3-4: DG A A CLR SW sw FLO LO TEMP HI CRS/RO ARP is handed to CRS, the IB IS operator is dispatched to SW PP house to investigate. Electricians may also be notified. CRS Decision should be made to place C SWP on A A Train CORRECTIVE ACTIONS: I. Place the spare Service Water Pump in service per SOP-117. ALL 2.1 Shift from Service Water Pump A to Service Water Pump C in service, as follows:

a. With the exception of racking down XSW1 EA 04, SERVICE WATER PUMP XPP0039A-SW, complete Attachment V.

ALL b. Start XPP-0039C, PUMP C TRAIN A. (PEER 0) El) RD RO c. Verify MVB-3116C, MVB-31 1 6C, SWP C DISCH, automatically opens. ALL/Building ALUBuilding d. Ensure sufficient Service Water Pump C cooling water flow, by throttling the following (SW-436):

1) XVTO31 570-SW, SW PP C MTR UPPER BRG CLG WTR XVT03157C-SW, SUP VALVE, to obtain upper bearing flow between 10 gpm and 12 gpm.

12

2) XVTO31 580-SW, SW PP C MTR LOWER BRG CLG WTR XVT03158C-SW, SUP VALVE, to obtain lower bearing flow between 3 gpm and 4 gpm.

ALUBuilding e. At XPN-1 ALL/Building XPN-13,3, C SERVICE WATER SCREEN Control Panel (SW-436), verify proper traveling screen operation, as follows:

1) Place the Screen Selector Switch, in HAND.
2) Verify proper screen operation and screen wash flow.
3) Place the Screen Selector Switch, in AUTO.

RD RO f. Stop XPP-0039A, PUMP A, and place the control switch, in PULL TO LK NON-A. P0 RO g. Verify MVB-31 1 6A, SWP A DISCH, automatically closes. MVB-3116A, Appendix D,D, Page 39 of 39

Scenario Event Description VC Summer-2005-301 Op-Test No.: Scenario No.: Event No.: Page _ _ of _ _ Event

Description:

Time Position Applicants Actions or Behavior ALL/Building ALUBuilding h. Re-verify Service Water Pump C cooling water flow and adjust as necessary, by throttling the following (SW-436): XVT03157C-SW, SW PP C MTR UPPER BRG CLG WTR

1) XVTO3157C-SW, SUP VALVE, to obtain upper bearing flow between 10 gpm and 12 gpm.
2) XVTO31 580-SW, SW PP C MTR LOWER BRG CLG WTR XVT03158C-SW, SUP VALVE, to obtain lower bearing flow between 3 gpm and 4 gpm.

ALL/Building ALUBuilding I. Rack down XSW1 EA 04, SERVICE WATER PUMP XPPOO39A-SW XPP0039A-SW (SW-425). ALUBuilding j.j. At XPN-1 ALL/Building 1, A SERVICE WATER SCREEN, Control Panel XPN-11, (SW-436), place the Screen Selector Switch, in OFF. ALL/Building ALUBuilding k. Complete Attachment V. ALL I. Ensure proper Service Water flow through the operable Train A Chiller per SOP-501. This ends the A SWP trip event. The following event is the L T-459 Failure, PZR Level LT-459 Controlling channel. LT-459 Fails low and Letdown isolates. The following alarms are received: XCP-6145-1: XCP-614 HI/LO 5-1: CHG LINE FLO HIILO XCP-616 1-3: BLCK HTRS ISOL L LTDN LOS LO TDN PZR LCS XCP-616 1-5: PZR LCS HI/LO LOS DEV HIILO XCP-61 6 3-1: PZR HTR CNTRL OR BU GRP 1/2 TRIP XCP-616 XCP-61 6 4-6: SCR OUTPT LOSS XCP-616 Appendix D, Page 39 of 39

Scenario Event Description VC Summer-2005-301 Op-Test No.: Scenario No.: Event No.: Page _ _ of _ _ Event

Description:

Time Position Applicants Actions or Behavior Crew enters AOP-401.06 PZR Level Control and Protection Channel Failure. Step 11 is an immediate action. AOP-401 .6 AOP-401.6 RO RD 1 Place PZR LEVEL CNTRL Switch to the position with two 1 operable channels. RO RD 2 Select an operable channel on PZR LEVEL RCDR. RO RD 3 Control the PZR Heaters as necessary to maintain PZR pressure: CNTRL GRP Heaters. BU GRP 1 1 Heaters. BU GRP 2 Heaters. RO RD 4 Verify Letdown is in service. 4 Re-establish Letdown. REFER TO SOP-102, CHEMICAL AND VOLUME CONTROL SYSTEM. IF Letdown can NOT be established, THEN REFER TO AOP AOP-102.1, LOSS OF LETDOWN, while continuing with this procedure. RO RD 2.1 Place FCV-122, CHG FLOW, in MAN and close. RO RD 2.2 Place PCV-145, LO PRESS L LTDN, TDN, in MAN and open to 70%. (PEER 0) [1) RO RD 2.3 Place TCV-144, CC TO LTDN HX, in MAN and open to 100%. RO RD 2.4 Place TCV-143, LTDN TO TD VCT ORDR DEMIN, in VCT. RO RD Dpen PVT-8152, L 2.5 Open LTDN TDN LINE ISOL. RO RD Dpen the following: 2.6 Open

a. LCV-459, LTDN LINE ISOL.
b. LCV-460, LTDN LINE ISOL.

Appendix D, Page 39 of 39

Scenario Event Description VC Summer-2005-301 Op-Test No.: Scenario No.: Event No.: Page _ _ of _ _ Event

Description:

Time Position Applicants Actions or Behavior RO 2.7 Ensure the following Charging Line Isolation Valves are open: MVG-8107, CHG LINE ISOL.

a. MVG-S107, MVG-8108, CHG LINE ISOL.
b. MVG-S10S, RO 2.8 Slowly open FCV-122, CHG FLOW, to establish 60 gpm flow 2.S Fl-i 22A, CHG FLOW GPM.

as indicated on FI-122A, RO nO 2.9 Open Orifice Isolation Valves to obtain the desired Letdown flow rate (60 gpm to 120 gpm): PVT-8149A, LTDN ORIFICE A ISOL (45 gpm).

a. PVT-S149A, PVT-8149B, LTDN ORIFICE B ISOL (60 gpm).
b. PVT-S149B, PVT-8149C, LTDN ORIFICE C ISOL (60 gpm).
c. PVT-S149C, RO 2.10 Adjust FCV-122, CHG FLOW, as required to maintain TI- TI 140, REGEN HX OUT TEMP of, °F, between 250°F and 350°F while maintaining Pressurizer level.

RO P1-i 45, LO 2.11 Adjust PCV-145, LO PRESS LTDN, to maintain PI-145, LTDN PRESS LTDN PRESS PSIG, between 300 psig and 400 psig. RO nO 2.12 Place PCV-145, LO PRESS LTDN, in AUTO. RO nO 2.13 Adjust TCV-144, CC TO LTDN HX, potentiometer as necessary to maintain the desired VCT temperature and place in AUTO. Refer to VCS Curve Book, Figure VII.1 5. VII.15. RO 2.14 When Pressurizer level matches reference level, place FCV-122, CHG FLOW, in AUTO per Section IV. RO 2.15 After the Letdown temperatures have stabilized, place TCV-TCV 143, LTDN TO VCT OR DEMIN, in DEMIN/AUTO. RO 5 Check if PZR LVL MASTER CONTROLLER is responding appropriately:

                          *. Verify Charging flow is normal and responding to PZR level error.
                         *. Verify PZR level is stable at OR trending to program level.

Appendix D, Page 39 of 39

Scenario Event Description VC Summer-2005-301 Op-Test No.: Scenario No.: Event No.: Page _ _ of _ _ Event

Description:

Time Position Applicants Actions or Behavior I CRS/SE 6 Within six hours, place the failed channel protection bistables in a tripped condition:

a. Identify the associated bistables for the failed channel REFER TO Attachment 1.
b. Record the following for each associated bistable on SOP-401, REACTOR PROTECTION AND CONTROL SYSTEM, Attachment I:
                           *. Instrument.
                           *. Associated Bistable.
                           *. Bistable Location.
                           *. STPs.
c. Notify the I&C l&C Department to place the identified bistables in trip.

7 Determine and correct the cause of the channel failure This concludes the L T-459 failure event. The next event is IPT-2010 slowly failing tailing high which results 1PV-2010 (8 in SG PORV IPV-2010 (B Loop) slowly going full open. Valve controller can be taken to Manual and closed. No alarms are associated with this event. ALL Crew should notice some excess RCS cooling, increased steam flow and finally notice IPV-2010 is going open. CRS!BOP CRS/BOP CRS and/or BOP should recommend placing 2010 controller in Manual and attempting to close. BOP IPV-2010 placed in Manual and closed. CRS/SE MWR should be written and work order generated to repair transmitter. This concludes the 2010 failing open event. Appendix D, Page 39 of 39

Scenario Event Description VC Summer-2005-301 Op-Test No.: Scenario No.: No.: Event No.: Event No.: Page _ _ of _ _ Page Event

Description:

Time Position Applicants Actions or Behavior The Letdown leak inside containment is the next event. The following alarms are received as leak progresses: XCP-642 3-3: RB ACC AREA RM-G5 HI RAD XCP-642 3-4: RB ACC AREA RM-G5 TRBL XCP-642 3-5: INCOR INSTR AREA RM-G14 HI RAD XCP-642 3-6: INCOR INSTR AREA RM-G14 TRBL AOP-101.1 AOP-1 01.1 RO RD 1 Verify PZR level is at or trending to program level. 1 IF PZR level is decreasing. THEN perform the following: a) Open FCV-1 22. CHG FLOW as necessary to maintain FCV-122. PZR level b) IF IF PZR level continues to decrease, THEN reduce Letdown to one 45 gpm orifice: 1)Set 1)Set PCV-145, LO La PRESS LTDN. To 70%

2) Ensure PVT-8149A. LTDN ORIFICE A ISOL. is open.
3) Close_both_PVT-8149B(C)._LTDN_ORIFICE_B(C)

Close both PVT-8149B(C). LTDN ORIFICE B(C) Appendix D, Page 39 of 39

Scenario Event Description VC Summer-2005-301 Op-Test No.: Scenario No.: Event No.: Page _ _ of _ _ Event

Description:

Time Position Applicants Actions or Behavior ISOL.

4) Adjust PCV-145. LO PRESS LTDN. to maintain P1-i 45. LO PRESS LTDN PRESS PSIG. between 300 PI-145.

psig and400 psig.

5) Place PCV-145, LO PRESS LTDN. in AUTO.

CRS/RO 2 Check if SI is required:

a. Check if jy any of the following criteria are met:
                            *. PZR level is decreasing with Charging maximized and Letdown minimized.
                            *. PZR    level is approaching 12%.
  • PZR pressure is approaching 1870 psig.
                            *. VCT level is approaching 5%.

SI should NOT be required, crew should follow ALTERNATIVE AL TERNA TIVE ACTION of step 2 which is to GO TO STEP 3 CRS/SE 3 Determine RCS leak rate:

a. Estimate the RCS leak rate. REFER TO IPCS CHGNET.
b. Calculate the RCS leak rate. REFER TO STP-114.002.

STP-1 14.002. OPERATIONAL LEAK TEST.

c. Check if the RCS leak rate is GREATER THAN Tech Spec 3.4.6.2
d. Comply with the applicable Tech Spec 3.4.6.2 action statement.

RO P0 4 Verify RCS pressure is GREATER THAN 2210 psig. a) Ensure all PZR Heaters are on. b) the PZR Spray Valves are closed c) Ensure the PZR PORVs are closed. IF any PORV fails to close, THEN close its Block Valve. BOP/CRS 5 Verify no SG tubes are leaking:

a. Narrow Range level in no SG is increasing with feed flow LESS THAN steam flow.
b. Radiation levels on all of the following are normal:
                          *. RM-G19A(B)(C). STMLN HI RNG GAMMA.
                          *. RM-A9. CNDSR EXHAUST GAS ATMOS MONITOR.
                          *. RM-L3. STEAM GENERATOR BLOWDOWN Appendix 0, D, Page 39 of 39

Scenario Event Description VC Summer-2005-301 Op-Test No.: Scenario No.: Page _ _ of _ _

                                      ------ Event No.:     -----

Event

Description:

Time Position Applicants Actions or Behavior LIQUID MONITOR.

                            *. RM-L10. SG BLOWDOWN CW DISCHARGE LIQUID RM-LIO.

MONITOR.

c. No steam flow/feed flow mismatch (feed flow low).
d. As determined by Chemistry sample analysis of ALL SG secondary sides for activity.

RO 6 Check the PZR PORVs:

a. Check if RCS pressure is LESS THAN 2335 psig.
b. Verify all PZR PORVs are closed.
c. Check if PRT conditions are normal by verifying
                                          /TEMP/LVLJPRESS HI (XCP-616 4-4). is not lit.

PRT LVL LO ITEMP/LVUPRESS

d. Verify at least one PZR PORV Block Valve is open.

RO 7 Check If Reactor Building conditions are normal:

a. RB radiation levels are normal on the following:
                           *. RM-GS. RB PERSONNEL ACCESS AREA GAMMA.
                           *. RM-G6. 17 RB REFUEL BRIDGE AREA GAMMA.
                           *. RM-A2. RB SAMPLE LINE PARTICULATE(IODINE)(GAS) ATMOS MONITOR.
b. RB Sump levels are normal
c. RB pressure is LESS THAN 1.5 psig
d. The following annunciators are NOT lit:

IA/2A DRN FLO HI (XCP-606 2-2).

                              *. RBCU IAl2A
  • RBCU IB/2B DRN FLO HI (XCP-607 2-2).

Conditions are not normal, normai so the alternative action of isolating letdown will be performed. RO 7 Attempt to isolate leakage as follows: a) Close all Letdown Isolation Valves:

1) PVT-8149A(B)(G) LTDN ORIFICE A(B)(C) ISOL.
2) LCV-459. LTDN LINE ISOL
3) LCV-460, L LTDN TDN LINE ISOL b) Check RCS parameters for indications of leakage.

Leakage should be isolated by the above actions. Crew should wait and verify no further leakage occurs. Since Normal Letdown isolated crew should place EXCESS LETDOWN in will remain isolated, service. SOP-i 02. CHEMICAL AND VOLUME REFER TO SOP-102. CONTROL SYSTEM Appendix D, Page 39 of 39

Scenario Event Scenario Event Description Description VC VC Summer-2005-301 Summer-2005-301 Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: Event No.: Event No.: Page Page _ _ of of _ _ Event

Description:

Event

Description:

Time Position Applicants Actions or Behavior The following is from SOP-102: SOP-i 02: RO 2.1 Ensure HCV-137, XS LTDN HX, is closed. RO RD 2.2 Place PVM-8143, XS LLTDN TDN TO VCT(PEER D) u) RO RD 2.3 If required, reset Phase A Isolation by depressing the following:

a. RESET PHASE A - TRAIN A CNTMT ISOL.
b. RESET PHASE A - TRAIN B CNTMT ISOL.

RO Open the following: MVT-8100,

a. MVT-81 00, SEAL WTR RTN ISOL.

b._MVT-8112,_SEAL

b. MVT-8112, SEAL WTR WTR_RTN_ISOL.

RTN ISOL. RO RD 2.5 Ensure MVG-9583, FROM XS L LTDN TDN HX, is open. RO PVT-81 53, XS LLTDN 2.6 Open PVT-8153, TDN ISOL. RO RD 2.7 Open PVT-8154, XS LTDN ISOL. RO RD 2.8 Establish Excess Letdown flow as follows:

a. Slowly throttle open HCV-137, HCV-1 37, XS LTDN HX.

TI-i 39, XS LETDOWN HX OUT TEMP of,

b. Monitor TI-139, °F, to maintain less than 165°F.
c. Monitor the following to ensure flow between 0.2 gpm and 5.0 gpm:

1)

1) FR-i 54A, RCP SL LKOFF HI RANGE.

FR-154A,

2) FR-i 54B, RCP SL LKOFF LO RANGE.

FR-154B, This concludes establishing Excess Letdown. More steps do remain from AOP- 101.1 for determining if leakage is AOP-101.1 isolated, but can commence the A RCP Rep high vibration event at this time. Appendix Appendix D,D, Page Page 39 39 of of 39 39

Scenario Event Description VC Summer-2005-301 Op-Test No.: Scenario No.: Event No.: Page _ _ of _ _ Event

Description:

Time Position Applicants Actions or Behavior Crew receives annunciator XCP-617 1-3: RCP A VIBR HI RCPAVIBRHI RO should notice frame and shaft vibration levels are escalating. A RCP should be secured based on increasing levels. The following steps would apply from SOP-10SOP-lOl1 for securing the RCP. RO RD 2.1 Place the Pressurizer Spray Valve for the affected Reactor Coolant Pump in MAN and close:

a. PCV 444D, PZR SPRAY, for Reactor Coolant Pump A.

RO RD 2.2 If the Reactor Coolant System is solid, place PCV-145, LO PRESS L LTDN, TDN, in MAN. RO RD 2.3 Secure one of the following Reactor Coolant Pumps as required:

a. XPP-0030A, PUMP A.

RO RD 2.4 If the Reactor Coolant System is solid, return PCV-145, LO PRESS L LTDN, TDN, to AUTO, if desired. RO RD 2.5 Verify Seal Injection to the secured Reactor Coolant Pump using the applicable following indicator: FLD GPM. Fl-i 30A, RCP A INJ FLO

a. FI-130A, RO RD 2.6 Maintain Component Cooling Water to the secured Reactor Coolant Pump thermal barrier until RCS temperature is less than 150°F.

BOP BDP 2.7 Place the following controllers in MAN, as required for the affected RCS loop and maintain Narrow Range Steam Generator level between 60% and 65%: Appendix D, Page 39 of 39

Scenario Event Description VC Summer-2005-301 Op-Test No.: Scenario No.: Event No.: Page _ _ of _ _

  • Event Event

Description:

Time Position Applicants Actions or Behavior

a. PVT-478, SG A FWF.
b. FCV-3321, LOOP A MAIN FW BYP.

CRS 2.8 If not already in Hot Standby, proceed to Hot Standby lAW GOP-5, Reactor Shutdown From Startup To Hot Standby (Mode 2 To Mode 3). The following steps are from GOP-5, Reactor Shutdown from Mode 2 to Mode 3. These steps will place the Reactor below 7.5x10-5% power. Prior to commencing shutdown, should go ahead and begin Small Break LOCA Event. CRS/SE 3.1 Complete GTP-702 Attachment II.K, Il.K, Operational Mode Change Plant Shutdown - Entering Mode 3 Or Plant Trip To Mode 3 From Modes 1 1 Or 2. RO 3.2 Select both Intermediate Range Channels on NR-45, NIS RECORDER. 3.3 Insert Control Rods with a manual Reactor trip as follows: CRS a. Perform a Pre-job brief per OAP-1 00.3, Human Performance_Tools. Performance Tools. RO b. Select one Intermediate Range and one Source Range Channel_on_NR-45,_NIS_RECORDER Channel on NR-45, NIS RECORDER BOP c. Ensure both Motor Driven Emergency Feedwater Pumps are_running. are running. RO d. (Optional) If desired, commence RCS boration prior to performing a manual Reactor trip: MVT-8104,

1) Open MVT-81 04, EMERG BORATE.
2) Ensure XPP-13A(B), BA XFER PP A(B), is running.
3) Verify greater than 30 gpm flow on FI-11 Fl-i 10, 0, EMERG BORATE FLOW GPM.

STP-i 34.001,

4) Refer to STP-134.00 1, Shutdown Margin Verification, to determine the required boron concentration needed for the anticipated Plant Mode and temperature:

Anticipated Mode: Anticipated RCS temperature: OF °F

                      ,               Required Boron:                 ppm
5) When boration is no longer desired, perform the following:

MVT-8i04, a) Close MVT-81 04, EMERG BORATE. b)_Verify_no b) flow_on_Fl-i Verify no flow on FI-1110,_EM ERG_BORATE 0, EMERG BORATE Appendix D, Page 39 of 39

Scenario Event Description VC Summer-2005-301 Op-Test No.: Scenario No.: ------- Event No.: Page ____ of ____ Event

Description:

Time Position Applicants Actions or Behavior FLOW GPM. RO e. Place RX TRIP Switch CS-CR01CS-CRO1 in TRIP.

f. Verify all Reactor Trip and Bypass Breakers are open.
g. Verify all Rod Bottom lights are lit.
h. If two or more Control Rods are not fully inserted, then emergency borate as follows:

MVT-8104,

1) Open MVT-81 04, EMERG BORATE.

Fl-i 10, EMERG

2) Verify greater than 30 gpm flow on FI-110, BORATE FLOW GPM.
3) If required, refer to AOP-1 06.1, Emergency Boration, to establish greater than 30 gpm flow.
4) Borate 2500 gallons if two Control Rods are not fully inserted.
5) Borate 5800 gallons ifit greater than two Control Rods are not fully inserted.
i. Verify Reactor Power level is decreasing.

j.j. Ensure RCS temperature is being maintained between 555°F and 559°F using the Steam Dump System or Steamline PORVs.

k. Place both SOURCE RANGE HIGH FLUX AT SHUTDOWN Switches in BLOCK.

I. When Reactor Power decreases below 7.5 x 10-6%, iO-6%, complete the following: i) Verify P6 Permissive de-energizes to dim. 1)

2) When on scale indication is observed, select both Source Range Channels on NR-45, NIS RECORDER.

This concludes the high vibration on A RGP RCP event. The Small Break LOGA LOCA event can now commence if not already performed earlier. The following steps would again be the repeat of AOP- 01.1 until the size of the leak would require AOP-1101.1 EOP-1.0 ently entry for TRIP and SI. Appendix D, Page 39 of 39

Scenario Event Description VC Summer-2005-301 Op-Test No.: Scenario No.: Event No.: Page _ _ of _ _ Event

Description:

Time Position Applicants Actions or Behavior The following annunciators should come into alarm: XCP 606 2-2: RBCU 1Af2A 1AJ2A DRN FLO HI XCP 607 2-2: RBCU 1 1B/2B B/2B DRN FLO HI XCP 616 3-6:PZR PCS LO BU HTRS ON AOP-101.1 AOP-1 011 1 Verify PZR level is at or trending to program level. 1 1 IF PZR level is decreasing. THEN perform the 1 following: FCV-1 22. CHG FLOW. as necessary to maintain a) Open FCV-122. PZR level b) IF PZR level continues to decrease, THEN reduce Letdown to one 45 gpm orifice:

1) Set PVT-145, LO PRESS LTDN. To 70%
2) Ensure PVT-8149A. LTDN ORIFICE A ISOL. is open.
3) Close both PVT-8149B(C). LTDN ORIFICE B(C)

ISOL.

4) Adjust PCV-145. LO PRESS LTDN. to maintain P1-i 45. LO PRESS LTDN PRESS PSIG. Between PI-145.

300 psig and 400 psig. LO PRESS LTDN. in AUTO.

5) Place PCV-145, LOPRESS 2 Check if SI is required:
a. Check if any of the following criteria are met:
                           ** PZR level is decreasing with Charging maximized and Letdown minimized.
                           ** PZR level is approaching 12%.
                          ** PZR pressure is approaching 1870  1870 psig.
                          ** VCT level is approaching 5%
b. Perform the following:
1) Trip the Reactor.

EOP-i .0. REACTOR TRIP/SAFETY INJECTION

2) GO TO EOP-1.0.

ACTUATION. WHEN EOP-i EOP-1.0.0 Immediate Actions are complete, THEN actuate SI. Appendix D,0, Page 39 of 39

Scenario Event Scenario Event Description Description VC VC Summer-2005-301 Summer-2005-301 Op-Test No.: Op-Test No.: Scenario No.: Scenario No.: Event No.: Event No.: Page _ _ of Page of _ _ Event

Description:

Event

Description:

Time Position L Applicants Actions or or Behavior Behavior Crew should transition to EOP-1.O.EOP-1. O. The first 5 steps are immediate operator actions. A Train of SI will fail to actuate in BOTH Manual and Automatic. Individual components can be manually started. Reactor will NOT trip in Automatic. Reactor can be tripped manually from the BOP side MCB Switch. 1 1 Verify Reactor Trip:

                               *. Trip the Reactor using either Reactor Trip
                              *. Verify all Reactor Trip and Bypass Breakers are open.
                              *. Verify all Rod Bottom Lights are lit.
                               *. Verify Reactor Power level is decreasing.

2 Verify Turbine/Generator Trip:

a. Verify all Turbine STM STOP VLVs are closed.
b. Ensure Generator Trip (after 30 second delay):

1}

1) Ensure the GEN BKR is open.

2}

2) Ensure the GEN FIELD BKR is open.

3}

3) Ensure the EXC FIELD CNTRL is tripped.

3 Verify both ESF buses are energized. 4 Check if SI is actuated: SI may have actuated by this time. Step 5 is the final immediate action.

a. Check if either:
                                    *. SI ACT status light is bright on XCP-6107XCP-61 07 1-1   1 -1..

OR

                                    *. Any redred first-out SI SI annunciator annunciator is    lit on is lit  on XCP-626 top row.

(If no SI then: GO TO Step 5.)

b. Actuate SI using either SI ACTUATION Switch.

b. c.

c. GO GO TO TO Step Step 6. 6.

66 Initiate Initiate ATTACHMENT ATTACHMENT 3, 3, SI SI EQUIPMENT VERIFICATION. EQUIPMENT VERIFICATION. The The "B" B Charging Charging pumppump fails fails to automatically start to automatically start on on SI.SI. The The operator operator isis expected expected to attempt to to attempt manually start to manually start "B"B Charging Charging pump pump and and itit will will start. start. Appendix Appendix D, D, Page Page 3939 ofof 39 39

Scenario Event Description VC Summer-2005-301 Event Description Summer-200S-301 Op-Test No.: Scenario No.: - - - - - - Event Scenario No.: Event No.: No.: ----- Page _ _ of _ _ Event

Description:

Event

Description:

Time Position Applicants Actions or Behavior 7 Announce plant conditions over the page system. 88 Verify RB pressure has remained LESS THAN 12 12 psig on PR-951, RB PSIG (P-951), red pen. 8 Perform the following: a) Verify both the following annunciators are lit:

  • XCP-612 3-2 (RB SPR ACT).
  • XCP-612 XCP-6124-24-2 (PHASE B ISOL).

IF either annunciator is NOT lit, THEN actuate RB Spray by placing the following switches to ACTUATE:

  • CS-SGA11 and CS-SGA2.

Both CS-SGA OR

  • Both CS-SGB1 and CS-SGB2.

b) Verify Phase B Isolation by ensuring RB SPRAY/PHASE B ISOL monitor lights are bright on XCP-6105. XCP-61 OS. c) Ensure the following are open: MVG-3001A(B),

  • MVG-3001 RWSTTO A(B), RWST TO SPRAY PUMP A(B) SUCT.

MVG-.3002A(B), NAOH TO SPRAY PUMP A(B) SUCT.

  • MVG-3002A(B),
  • MVG-3003A(B), SPRAY HDR ISOL LOOP A(B).

d) Ensure both RB Spray Pumps are running. e) Verify RB Spray flow is GREATER THAN 2S00 2500 gpm for each operating train on: SPA PP A DISCH FLOW GPM. Fl-7368, SPR

  • FI-7368,
  • FI-7378, SPR PP B DISCH FLOW GPM.

f) Stop all RCPs. 9 Check RCS temperature:

  • With any RCP running, RCS Tavg is stable at OR 557:F.

trending to 5S7:F. Appendix D, Page 39 of 39

Scenario Event Scenario Description VC Event Description VC Summer-200 Summer-2005-3015-301 Event No.: Page Page ___ of Op-Test No.: Op-Test Scenario No.: No.: - - - Scenario No.:

                                              - - - - - Event       No.:

of _ _ Event

Description:

Event

Description:

II Time Time Position Position Applicants Actions Applicants Actions oror Behavior Behavior OR OR

  • With With no running, RCS RCP running, no RCP Tcold is RCS Tcold stable at is stable at OR OR trending to trending to 557Fc) 557"Fc) 99 IF RCS temperature is IF RCS LESS THAN is LESS 557"F AND THAN 557F AND decreasing, THEN:

Place the STM DUMP CNTRLCont a) Place CNTRLControlierroller in MAN and in MAN Closed Closed b) Place the STM DUMP DUMP MODE SELECT Switch in MODE SELECT in STM PRESS. c) Ensure all Steamline PORVs and Condenser Steam Dumps are closed. d) IF RCS cooldown continues, THEN: IF Narrow Range SG level is LESS THAN 30%

1) IF

[50%] in all SGs, THEN reduce EFW flow as necessary to stop the cooldown, while maintaining total EFW flow GREATER THAN 450 gpm.

2) WHEN Narrow Range SG level is GREATER THAN 30% [50%] in at least one SG, THEN control EFW flow as necessary to stabilize RCS 557F.

temperature at 557"F. e) IF RCS cooldown continues, THEN close:

                                  ** MS Isolation Valves, PVM-2801  PVM-2801A      (B)(C).

A(B)(C). PVM-2869A(B)(C).. Isolation Bypass Valves, PVM-2869A(B)(C)

                                  ** MS Isolation IF  RCS temperature is IF RCS                          GREATER THAN 557"F is GREATER                 557F AND increasing, THEN:

a) a) Verify Verify PERMISV PERMISV C-9 light is status light C-9 status bright on is bright XCP61 14 on XCP-6114 1-3. 1-3. IF the b) IF b) Condenser is the Condenser available, THEN is available, THEN ensure Condenser ensure Condenser Steam Steam Dump Dump Valves open. are open. Valves are c) IF the c) IF Condenser isis NOT the Condenser NOT available, THEN open available, THEN the open the Steamline PORVs, Steamline PCV-2000(201 0)(2020): PORVs, PCV-2000(2010)(2020):

1) Place the
1) Place RELIEF A(B)(C)

PWR RELIEF the PWR A(B)(C) SETPT Controllers SETPT Controllers in in MAN MAN and closed. and closed. Appendix D, Appendix Page 39 D, Page of 39 39 of 39

ScenarioEvent Scenario DescriptionVC EventDescription VCSummer-200 5-301 Summer-2005-301 No.: Op-TestNo.: Op-Test ScenarioNo.: Scenario No.: EventNo.: Event No.: Page _ _ofof - - Page Event

Description:

Event

Description:

Time Time Position Position Actions or Applicants Actions Applicants or Behavior Behavior

2) Place
2) Place thethe Steamline Power Relief Steamline Power A(B)(C) Mode Relief A(B)(C) Mode Switches Switches in in PWR PWR RLF.

RLF. Adjust the

3) Adjust
3) the PWR RELIEF A(B)(C)

PWR RELIEF SETPT Controllers A(B)(C) SETPT Controllers as necessary to as necessary reduce RCS to reduce RCS temperature. temperature. 10 Check 10 Check PZR PORVs and PZR PORVs Spray Valves: and Spray Valves:

a. PZR
a. PZR PORVs PORVs are are closed.

closed.

b. PZR
b. PZR Spray Valves are Spray Valves are closed.

closed. power is available to at least one PZR

c. Verify power
c. PZR PORV Block Valve:
                             .*      MVG-8000A,, RELIEF 445 A ISOL.

MVG-8000A ISOL. MVG-8000B, RELIEF 444 B ISOL.

                              ** MVG-8000B, MVG-8000C,, RELIEF 445 B
  • MVG-8000C
                               .                                        B ISOL.
d. Verify at least one PZR PORV Block Valve is open.. open ..

11 Check if RCPs should be stopped: stopped:

a. Check if either of the following criteria is met:
                                *. Annunciator XCP-612 4-2 is lit (PHASE B ISOL)          ISOL)..

OR

                                *. RCS     pressure    is  LESS THAN 1400 is LESS              1400 psig AND SI SI flow is flow is indicated indicated     on  FI-943, FI-943,   CHG    LOOP LOOP     B B CLD/HOT    LG LG FLOW FLOW GPM. GPM.

b.

b. Stop Stop all all RCPs.