Summary of Public Meeting with Firstenergy Nuclear Operating Company (FENOC) to Discuss the Results of Repairs Made to the Reactor Vessel Head and the Basis for Davis-Besse's Decision to Start Up
ML101610792
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/10/2010
From: Jamnes Cameron
NRC/RGN-III/DRP/B6
To:
References
Download: ML101610792 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 10, 2010 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station

SUBJECT:

SUMMARY

OF THE JUNE 3, 2010, PUBLIC MEETING TO DISCUSS THE RESULTS OF REPAIRS MADE TO THE REACTOR VESSEL HEAD AND THE BASIS FOR DAVIS-BESSES DECISION TO START UP On June 3, 2010, the Nuclear Regulatory Commission (NRC) held a public meeting at the Camp Perry Lodging & Conference Center in Port Clinton, Ohio. The meeting was between NRC Region III senior management and FirstEnergy Nuclear Operating Company (FENOC) representatives to discuss inspections and repairs of the reactor vessel head and technical questions regarding the basis for their decision to start up the Davis-Besse Nuclear Power Station.

The NRC began the meeting by sharing background information on the initial NRC actions upon the discovery of nozzle cracking at the Davis-Besse nuclear plant. This was followed by a discussion of the NRCs expectations about the information they would receive from FENOC at the meeting.

The licensee then provided a presentation of their site activities during recent months, including discussion of the control rod drive mechanism (CRDM) issue. During their presentation, the licensee discussed refueling outage activities and plant performance through their most recent cycle. In addition, they shared the results of the exams performed on the reactor vessel head, described the methods being used to repair the damaged CRDM nozzles, and addressed the results of their root cause analysis. They also discussed their basis for determining that the reactor vessel head could be safely returned to service, and the remaining activities that needed to be completed before starting up the plant. The NRCs questions and comments were addressed by the licensee throughout the presentation.

Following the licensees presentation, the NRC provided their closing remarks. During these remarks, the NRC discussed the next steps in their process to evaluate the information FENOC has provided to date, including the information gathered at the meeting. The NRC did not make any regulatory decisions regarding the acceptability of inspections and repairs or the suitability of startup during this meeting. However, the results of the NRCs evaluation will be documented and made publically available in ADAMS at a later date.

FirstEnergy Nuclear Operating Company (FENOC)

The NRCs meeting presentation slides as well as the licensees meeting slides can be found in the Agencywide Documents Access and Management System (ADAMS) at ML101540031. A list of principal meeting attendees can be found in the attached enclosure.

At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials and engage the licensee.

/RA/ By Frances C. Ramirez Acting For/

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

As stated cc w/encl: Distribution via ListServ

PUBLIC MEETING PRINCIPAL ATTENDEES June 3, 2010 FirstEnergy B. Allen, Site Vice President, Davis-Besse B. Boles, Director, Site Operations C. Price, Director, Site Performance Improvement, Davis-Besse V. Kaminskas, Director, Site Engineering, Davis-Besse S. Plymale, Manager, Plant Engineering K. Byrd, Manager, Design Engineering Nuclear Regulatory Commission C. Pederson, Deputy Regional Administrator, Region III A. Boland, Director, Division of Reactor Safety, Region III M. Evans, Director, Division of Component Integrity, Office of Nuclear Reactor Regulation J. Cameron, Chief, Branch 6, Division of Reactor Projects, Region III D. Hills, Chief, Engineering Branch 1, Division of Reactor Safety, Region III T. Lupold, Chief, Piping and NDE Branch, Division of Component Integrity, Office of Nuclear Reactor Regulation M. Mahoney, Project Manager, Division of Operating Reactor Licensing, Licensing Branch III-2, Office of Nuclear Reactor Regulation J. Rutkowski, Senior Resident Inspector, Davis-Besse Other Attendees M. Stahl, Ottawa County (Ohio) Commissioner, President J. Sass, Ottawa County (Ohio) Commissioner S. Arndt, Ottawa County (Ohio) Commissioner J. Witt, Ottawa County (Ohio) Administrator R. Bratton, Ottawa County (Ohio) Sheriff Enclosure

FirstEnergy Nuclear Operating Company (FENOC)

The NRCs meeting presentation slides as well as the licensees meeting slides can be found in the Agencywide Documents Access and Management System (ADAMS) at ML101540031. A list of principal meeting attendees can be found in the attached enclosure.

At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials and engage the licensee.

/RA/ By Frances C. Ramirez Acting For/

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

As stated cc w/encl: Distribution via ListServ DOCUMENT NAME: G:\DAVI\Davis Besse Mtng Summary for June 3 2010 Management Mtng.docx G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME PVoss:dtp FRamirez for JCameron DATE 06/10/10 06/10/10 OFFICIAL RECORD COPY

Letter to FirstEnergy Nuclear Operating Company from J. Cameron dated June 10, 2010

SUBJECT:

SUMMARY

OF THE JUNE 3, 2010, PUBLIC MEETING TO DISCUSS THE RESULTS OF REPAIRS MADE TO THE REACTOR VESSEL HEAD AND THE BASIS FOR DAVIS-BESSES DECISION TO START UP DISTRIBUTION:

RidsNrrDorlLpl3-2 Resource Susan Bagley RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource