ML101550530

From kanterella
Jump to navigation Jump to search
E-mail from J. Newman of Exelon Corp to J. Brand of USNRC, Copy of Containment Breach Brief Rev 3
ML101550530
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 12/02/2009
From: Newman J
Exelon Corp
To: Javier Brand
NRC Region 1
References
FOIA/PA-2010-0118
Download: ML101550530 (6)


Text

Brand, Javier From: Jonathan.Newman@exeloncorp.com Sent: Wednesday, December 02, 2009 8:51 AM To: Brand, Javier

Subject:

, FW: Containment Breach Standing Order Rev 2 Attachments: Copy of containment breach brief rev 3.doc From: Roberts, Todd:(GenCo-N uc)

Sent: Wednesday, December 02, 2009 1:38 AM To: Barwis, Moises:(GenCo-Nuc); Beaden, Stewart H.:(GenCo-Nuc); Boddy, Timothy J:(GenCo-Nuc); Conjar, Edward L.:(GenCo-Nuc); Darkes, Scott C:(GenCo-Nuc); Davis, Richard (TMI):(GenCo-Nuc); DiVittore, Dean A:(GenCo-Nuc);

Ethridge, David W.:(GenCo-Nuc); Giard, Troy M.:(GenCo-Nuc); Hanlon, Mark S.:(GenCo-Nuc); Hardee, Catherine G.:(GenCo-Nuc); Harris, Willie O.:(GenCo-Nuc); Hinkley, Mark C:(GenCo-Nuc); Hostetter, Laverne E.:(GenCo-Nuc);

Johnson, Pamela A:(GenCo-Nuc); Kimball, Andrew C:(GenCo-Nuc); Linsenbach III, Frank W.:(GenCo-Nuc); McCarty, George P:(GenCo-Nuc); McDonald, Robert E Jr:(GenCo-Nuc); Merchant, Dale:(GenCo-Nuc); Morley, Melissa:(GenCo-Nuc);

Newman, Jonathan R:(GenCo-Nuc); Page, David A:(GenCo-Nuc); Viola, Dennis A:(GenCo-Nuc); Vorisek, Charles F:(GenCo-Nuc); Zeiter, David E:(GenCo-Nuc)

Subject:

FW: Containment Breach Standing Order Rev 2 From: Goldman, Jeffrey A:(GenCo-Nuc)

Sent: Wednesday, December 02, 2009 1:16 AM To: Goldman, Jeffrey A:(GenCo-Nuc); Sallade, Susan H.:(GenCo-Nuc); Piazza, John J:(GenCo-Nuc); Wend, John C.:(GenCo-Nuc); Carsky, William:(GenCo-Nuc); Blair, John A.:(GenCo-Nuc); Alvey, Tim D.:(GenCo-Nuc); Weber, Laura K:(GenCo-Nuc); Ethridge, David W.:(GenCo-Nuc); Baker, Chris (TMI):(GenCo-Nuc); Parfitt, Bradley A.:(GenCo-Nuc);

Haaf, Thomas P.:(GenCo-Nuc); Davis, Richard (TMI):(GenCo-Nuc); DiVittore, Dean A:(GenCo-Nuc); Libra, Rick:(GenCo-Nuc)

Cc: Heishman, James B.:(GenCo-Nuc); Smith Jr, George W:(GenCo-Nuc); Roberts, Todd:(GenCo-Nuc); Wilkerson, Scott:(GenCo-Nuc); Carreras, Edward M.:(GenCo-Nuc); Haaf, Thomas P.:(GenCo-Nuc)

Subject:

RE: Containment Breach Standing Order Rev 2 Rev 3 issued tonight based on experience with outward airflow at the RB construction opening

<<Copy of containment breach brief rev 3.doc>>

From: Goldman, Jeffrey A:(GenCo-Nuc)

Sent: Friday, November 27, 2009 4:01 AM To: Goldman, Jeffrey A:(GenCo-Nuc); Sallade, Susan H.:(GenCo-Nuc); Piazza, John J:(GenCo-Nuc); Wend, John C.:(GenCo-Nuc); Carsky, William:(GenCo-Nuc); Blair, John A.:(GenCo-Nuc); Alvey, Tim D.:(GenCo-Nuc); Weber, Laura K:(GenCo-Nuc); Ethridge, David W.:(GenCo-Nuc); Baker, Chris (TMI):(GenCo-Nuc); Parfitt, Bradley A.:(GenCo-Nuc);

Haaf, Thomas P.:(GenCo-Nuc); Davis, Richard (TMI):(GenCo-Nuc); DiVittore, Dean A:(GenCo-Nuc); Libra, Rick:(GenCo-Nuc)

Cc: Coughlin, Kevin R.:(GenCo-Nuc); Heishman, James B.:(GenCo-Nuc); Smith Jr, George W:(GenCo-Nuc); Roberts, Todd:(GenCo-Nuc); Paules, James R:(GenCo-Nuc); Wilkerson, Scott:(GenCo-Nuc)

Subject:

RE: Containment Breach Standing Order Rev 2 Rev 2 issued tonight based on experience with routine personnel transport under tarp, and to recognize daily I&C flow readings

<< File: containment breach brief rev 2.doc >>

From: Goldman, Jeffrey A:(GenCo-Nuc)

Sent: Thursday, November 26, 2009 6:57 PM To: Goldman, Jeffrey A:(GenCo-Nuc); Sallade, Susan H.:(GenCo-Nuc); Piazza, John J:(GenCo-Nuc); Wend, John 1

C.:(GenCo-Nuc); Carsky, William:(GenCo-Nuc); Blair, John A.:(GenCo-Nuc); Alvey, Tim D.:(GenCo-Nuc); Weber, Laura K:(GenCo-Nuc); Ethridge, David W.:(GenCo-Nuc); Baker, Chris (TMI):(GenCo-Nuc); Parfitt, Bradley A.:(GenCo-Nuc);

Haaf, Thomas P.:(GenCo-Nuc); Davis, Richard (TMI):(GenCo-Nuc); DiVittore, Dean A:(GenCo-Nuc); Libra, Rick:(GenCo-Nuc)

Cc: Coughlin, Kevin R.:(GenCo-Nuc); Heishman, James B.:(GenCo-Nuc); Smith Jr, George W:(GenCo-Nuc); Roberts, Todd:(GenCo-Nuc); Paules, James R:(GenCo-Nuc)

Subject:

RE: Draft Containment Breach Standing Order Rev 1 was issued on day shift today

<< File: containment breach brief rev 1.doc >>

From: Goldman, Jeffrey A:(GenCo-Nuc)

Sent: Thursday, November 26, 2009 4:33 AM To: Sallade, Susan H.:(GenCo-Nuc); Piazza, John J:(GenCo-Nuc); Wend, John C.:(GenCo-Nuc); Carsky, William:(GenCo-Nuc); Blair, John A.:(GenCo-Nuc); Alvey, Tim D.:(GenCo-Nuc); Weber, Laura K:(GenCo-Nuc); Ethridge, David W.:(GenCo-Nuc); Baker, Chris. (TMI):(GenCo-Nuc); Parfitt, Bradley A.:(GenCo-Nuc); Haaf, Thomas P.:(GenCo-Nuc); Davis, Richard (TMI):(GenCo-Nuc); DiVittore, Dean A:(GenCo-Nuc); Libra, Rick:(GenCo-Nuc)

Cc: Coughlin, Kevin R.:(GenCo-Nuc); Heishman, James B.:(GenCo-Nuc); Smith Jr, George W:(GenCo-Nuc); Roberts, Todd:(GenCo-Nuc)

Subject:

RE: Draft Containment Breach Standing Order Attached is final version which incorporates comments received. I will go over this with night shift OCC folks and ensure they turn over to their day shift counterparts. << File: Containment Breach Standing Order (6).doc >>

From: Sallade, Susan H.:(GenCo-Nuc)

Sent: Wednesday, November 25, 2009 6:32 PM To: Piazza, John J:(GenCo-Nuc); Wend, John C.:(GenCo-Nuc); Carsky, William:(GenCo-Nuc); Blair, John A.:(GenCo-Nuc);

Goldman, Jeffrey A:(GenCo-Nuc); Alvey, Tim D.:(GenCo-Nuc); Weber, Laura K:(GenCo-Nuc); Ethridge, David W.:(GenCo-Nuc); Baker, Chris (TMI):(GenCo-Nuc); Parfitt, Bradley A.:(GenCo-Nuc); Haaf, Thomas P.:(GenCo-Nuc); Davis, Richard (TMI):(GenCo-Nuc); DiVittore, Dean A:(GenCo-Nuc); Libra, Rick:(GenCo-Nuc)

Subject:

Draft Containment Breach Standing Order Please provide comment on draft standing order, plan is to issue it tonight-comments should be provided to both Jeff Goldman and myself.

Thank-you, Sue Sallade 571-4343

<< File: Containment Breach Standing Order.doc >>

                                                                                                    • This e-mail and any of its attachments may contain Exelon Corporation proprietary information, which is privileged, confidential, or subject to copyright belonging to the Exelon Corporation family of Companies. This e-mail is intended solely for the use of the individual or entity to which it is addressed. If you are not the intended recipient of this e-mail, you are hereby notified that any dissemination, distribution, copying, or action taken in relation to the contents of and attachments to this e-mail is strictly prohibited and may be unlawful. If you have received this e-mail in error, 2

'please notify the sender immediately and permanently delete the original and any copy of this e-mail and any printout. Thank You. **************************************************

3

TMI- 1 Standing Order Rev. 3- Issued 12/2/09@ 0'1:05ý This order applies any time the Containment Liner Plate is breached and is applicable to all station personnel, including but not limited to Operations, Maintenance., SGT, Shaw, Rad Pro and Chemistry Operations will maintain RB Purge Exhaust flow in order to maximize air inflow thru the RB Openings (both the Equipment Hatch and the RB construction opening)

If at any time airflow is observed by any personnel to be out of the RB openings, notify the Operations Control Room Supervisor (x8071).

The Radiation Protection GRCS will ensure documented observation of air inflow/tarp inward deflection at a minimum of once every 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> by observing ribbon strips or tarp deflection at the RB openings (see attached table). In addition, once per day I&C will take airflow measurements at the construction opening and the equipment hatch.

All personnel will obtain permission from the Operations Control Room Supervisor (x8071) prior to changing the configuration of RB openings. Personnel may pass through the tarps without contacting Operations. They shall ensure the tarps are fully closed after each passage.

Prior to granting permission to manipulate RB openings, The Operations Control Room Supervisor will evaluate the following:

___ Stable Purge exhaust Stable Aux and FHB exhaust flow

___ Discuss with the duty RPM or the OCC RPM any radiological evolutions in progress or planned and ensure adequate controls are established to allow opening of containment

___ The duty RPM or the OCC RPM will verify stable RB airborne activity

___ Airborne activity monitors near RB openings are operating

___ An RB opening closure plan is established that includes at a minimum, the supervisor responsible to close the opening, contact phone # and radio channel, and estimated time to close the opening A continuous airborne radioactivity monitor capable of alarming shall be operating near the RB openings. This requirement can be waived by duty RPM provided the requirements of RAF 09-011 are met.

The Radiation Protection GRCS will ensure recording of airborne radiation monitor indications near the RB openings at a minimum of once every 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> (see attached table)

If airflow exists out of an RB opening or if an airborne Radiation Monitor at an RB opening rises to > 0.3 DAC, then perform the following:

Discontinue work activities with potential to cause airborne contamination in the RB until evaluated by ttieduity RPM or the OCC RPM to ensure propr egineering controls are in place, and approved by the Shift Outage Manager

___ Evaluate radiation release impact

___ Close the opening with outflow or if closure is not possible, document the time, airflow measurement/estimate, and duration of outward flow for evaluation of non-routine release Evaluate EAL's Generate IR

Six Hour Monitoring of RB Openings Date/Time Air Inflow Radiation Air inflow or Radiation Data or inward Monitor inward tarp Monitor Recorded tarp Indication direction @ Indication at By:

direction at RB RB Equipment Construction Construction Equipment Hatch Opening Opening Hatch In DAC In DAC via Via AMS- Circle AMS-3 or Circle 3 or ribbon/tarp equivalent ribbon/tarp equivalent direction direction IN/ IN / OUT OUT IN! IN / OUT OUT IN! IN / OUT OUT IN/ IN / OUT OUT IN! IN / OUT OUT IN! IN / OUT OUT IN! IN / OUT OUT IN! IN / OUT OUT IN IN /OUT OUT IN! IN /OUT OUT IN! IN /OUT OUT Immediately notify the control room (x8071) if:

___ Airflow/tarp direction is out of any opening or

____ The radiation monitor reading at any opening rises to > 0.3 DAC