G20100272/EDATS: OEDO-2010-0343 - Response to 2.206 - Prevent Restart of Millstone Power Station, Unit 3
ML101450266
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 06/04/2010
From: Giitter J
Division of Operating Reactor Licensing
To: Dan Collins
- No Known Affiliation
Sandeers, Carleen, NRR/DORL, 415-1603
Shared Package
ml101390153 List:
References
G20100272, OEDO-2010-0343, FOIA/PA-2011-0115
Download: ML101450266 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 4,2010 Mr. David Collins 6 Katherine Road Old Lyme, CT 06371

Dear Mr. Collins:

The purpose of this letter is to inform you that no further action will be taken on your April 21, 2010, request to prevent the restart of Millstone Power Station, Unit NO.3 (MPS3),

since on May 20,2010, you withdrew your request for action. Your original request was made to prevent the restart of MPS3 in a paper regarding Millstone Power Station (Millstone), which was received by the NRC on April 21,2010. Additional revisions to your paper were submitted to the NRC on April 22, April 29, and May 6, 2010. The NRC contacted you on May 3, 2010, to confirm review of your request under Title 10 of the Code of Federal Regulations (10 CFR),

Section 2.206, "Request for Action under this subpart." You confirmed your intention of NRC review under this Section. A public version of all four revisions of your paper can be found at Agencywide Documents Access and Management System (ADAMS) Accession No.

rvlL 101390172.

You requested that the NRC not allow MPS3, operated by Dominion Nuclear Connecticut, Inc.

(DNC or the licensee), to restart after its scheduled refueling outage until the staffing safety issue (associated with the recent reduction in staff at Millstone), and other safety issues identified in your paper, are fully investigated and addressed to the satisfaction of: (1) NRC resident inspectors; (2) Institute of Nuclear Power Operations (INPO) representatives; (3)

Millstone Oversight department; (4) Millstone managers; (5) Millstone workers; and (6) the Connecticut Attorney General's office. In the April 21 and April 22, 2010, revisions of your paper, you requested the Governor of Connecticut to prevent the restart of MPS3. You subsequently revised your request in the April 29 and May 6, 2010, revisions, to request the Nuclear Energy Advisory Group' to recommend that the Connecticut Governor prevent restart.

However, the authority to prevent the restart of MPS3 lies with the NRC. Hereafter, your request is referred to as "the petition."

The petition was assigned to the NRC's Office of Nuclear Reactor Regulation (NRR). NRR's Petition Review Board (PRB) met on May 3, 2010, and made an initial determination that no immediate action should be taken. The PRB made this determination based on the absence of an immediate safety concern. On May 10, 2010, you were advised of the PRB's decision and were provided the opportunity to address the PRB. You requested to address the PRB and a teleconference was scheduled for May 20, 2010.

1 The Nuclear Energy Advisory Group is an advisory group that reports to the Connecticut Governor.

D. Collins - 2 On May 20, 2010, prior to the scheduled teleconference, you contacted the NRC to request cancellation of the teleconference and withdrawal of your 10 CFR 2.206 request (ADAMS Accession No. ML101450184). Therefore, the NRC staff cancelled the May 20,2010, teleconference. TAC Nos. ME3878 and ME3879, which were used to track this work, will be closed.

I would like to express my appreciation for bringing this matter to the attention of the NRC. If you have any questions with regards to this matter, you can contact the Millstone Project Manager, Carleen Sanders, at 301-415-1603.

Sincerely,

/ ~/ ~

Jo eph G. Giitter, Director ision of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-336 and 50-423 cc: Listserv

D. Collins -2 On May 20, 2010, prior to the scheduled teleconference, you contacted the NRC to request cancellation of the teleconference and withdrawal of your 10 CFR 2.206 request (ADAMS Accession No. ML101450184). Therefore, the NRC staff cancelled the May 20, 2010, teleconference. TAC Nos. ME3878 and ME3879, which were used to track this work, will be closed.

I would like to express my appreciation for bringing this matter to the attention of the NRC. If you have any questions with regards to this matter, you can contact the Millstone Project Manager, Carleen Sanders, at 301-415-1603.

Sincerely,

/raJ Joseph G. Giitter, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-336 and 50-423 cc: Listserv DISTRIBUTION: G20100272/EDATS: OEDO-2010-0343 PUBLIC LPL1-1 R/F RidsNrrDorl RidsNrrDorlLpll-2 RidsNrrDORLDpr RidsNrrPMMilistone RidsNrrLAABaxter TBlount TMensah ELenning DJackson JCai AKlett HBalian RidsNrrMailCenter RidsOgcRp RidsEdoMailCenter RidsOpaMail RidsRgn1 MailCenter RidsNrrOd RidsSecyMailCenter RidsOcaMailCenter ADAMS Accession No.' ML101450266 OFFICE LPL1-2/PM LPL 1-2/LA RI LPL 1-2/BC DPRIDD DORLID NAME CSanders ABaxter DJackson HChernoff TBlount JGiitter DATE 6/1/10 6/1/10 6/2/10 6/1/10 6/1/10 6/4/10 Official Record Copy