UNIVERSITY of MISSOURI RESEARCH REACTOR CENTER May 18, 2010 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Mail Station P 1-37 Washington, DC 20555-0001
Reference:
Docket 50-186 University of Missouri-Columbia Research Reactor Amended Facility License R-103 Enclosed you will find the University of Missouri-Columbia Research Reactor's responses to the U.S. Nuclear Regulatory Commission's (NRC) request for additional information, dated April 20, 2010, regarding our renewal request for Amended Facility Operating License R- 103, which was submitted to the NRC on August 31, 2006, as supplemented.
If you have any questions, please contact Leslie P. Foyto, the facility Reactor Manager, at (573) 882-5276 or foytol(imissouri.edu.
Sincerely, Ralph A. Butler, P.E.
Director ~\~W Pe~'. ARGEE P.STOU SEAL.:
Z Marh 24, 2012 RAB/djr Enclosures 1513 Research Park Drive Columbia, MO 65211 Phone: 573-882-4211 Fax: 573-882-6360 Web: http://web.missouri.edu/-murrwww Fighting Cancer with Tomorrow's Technology
UNIVERSITY of MISSOURI RESEARCH REACTOR CENTER May 18, 2010 U.S. Nuclear Regulatory Comnussion Attention: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001
REFERENCE:
Docket 50-186 University of Missouri - Columbia Research Reactor Amended Facility License R-1.03
SUBJECT:
Written communication as specified by 10 CFR 50.4(b)(1) regarding the response to the "University of Missouri at Columbia - Request for Additional Information Re: License Renewal, National Historic Preservation Act (TAC No. MD3034)," dated April 30, 2010 On August 31, 2006, the University of Missouri-Columbia Research Reactor (MURR) submitted a request to the U.S. Nuclear Regulatory Commission (NRC) to renew Amended Facility Operating License R-103.
On April 20, 2010, the NRC requested additional information and clarification regarding the renewal request in the form of six (6) questions. Those questions, and the MURR's responses to those questions, are attached.
If there are questions regarding this response, please contact me at (573) 882-5276 or foytol(imissouri.edu. I declare under penalty of perjury that the foregoing is true and correct.
ENDORSEMENT:
Sincerely, Reviewed and Approved, Leslie P. Foyto Ralph A. Butler, P.E.
Reactor Manager Director xc: Reactor Advisory Committee tMRGEE P.STOWr Mycerjslo Eqphg Reactor Safety Subcommittee March 24, 012 SEAL!
-Dr. Robert Duncan, Vice Chancellor for Research Mr. Alexander Adams, U.S. NRC CoMmnon #W61 1486 Mr. Craig Basset, U.S. NRC 1513 Research Park Drive Columbia, MO 65211 Phone: 573-882-4211 Fax: 573-882-6360 Web: http-//web.missouri.edu/-murrwww Fighting Cancer with Tomorrow's Technology
Enclosed: Attachment 1: USGS 7.5 min. Topographic Map, Columbia Quadrangle - Relevant Portion Attachment 2: USGS 7.5 min. Topographic Map, Columbia Quadrangle - Large Scale Attachment 3: Topographic Map - MURR Site Grading Plan Attachment 4: Photo of MURR Construction Site - Ungraded Attachment 5: Photo of MURR Construction Site - Graded Attachment 6: Topographic Map - Archaeological Sites within 1 Kilometer of MURR Attachment 7: Topographic Map - Historic Sites and Districts in the Vicinity of MURR Attachment 8: Photos (12) of MURR Site Structures Attachment 9: Map of MURR Facility - Reference for Photographs of MURR Site Structures Attachment 10: Map of MURR Facility - Reference for All MURR Site Structures
Please provide the name of the United States Geological Survey (USGS) topological map quadrangle in which MURR is located. Also, for the map you are referencing,please state the year, township, range and section. Please attach a copy of the relevant portion (8V x 11) of the current USGS 7.5 min. topographic map and, if necessary, a large scale project map. Please do not send an individual map with each structureor site. While the originalmap is preferable,a good copy is acceptable. USGS 7.5 min. topographic maps may be orderedfrom the Geological Survey and Resource Assessment Division, Department of NaturalResources, 111 Fairground,Rolla, MO 65402, Telephone: (573) 368-2125, orprintedfrom the website http.//www.topozone.com/.
The MURR facility is located in the Columbia quadrangle, Missouri - Boone County, Township 48N, Range 13W and Section 24. The most current USGS 7.5 min. topographic map that is being referenced was printed in 1967 and photorevised i'n 1981. Attached are the relevant portion (81/2" x II ") and large scale topographic maps of where the MURR site is located (Attachments I and 2).
- 2. For the MURR facility, please state if the ground involved was graded, built on, borrowed, or otherwise disturbed. If so, please describe in detail and provide photographs, if applicable. Iffill material was used, indicate "borrow areas'" on the topographicmap from which fill material was taken.
The building area of the MURR site at the time construction commenced had a gradual rise from south to north. In addition to the removal of existing trees on the site, approximately 15,000 cubic yards of fill was deposited on the south and central portions of the site. Fill material was removed from the east side of Research Park Drive (formerly known as "Reactor Park Road"). The attached topographic map (Attachment 3) indicates relevant fill and cut areas. Also attached are photos of the site prior to grading (Attachment 4) and after grading (Attachment 5).
- 3. Please state if you are aware of any archaeologicalsites on or adjacent to the MURR site. If so, identify them on the topographicmap.
A review of the archaeological records of the Missouri Department of Natural Resources and the Archaeology Survey of Missouri found no evidence of archaeological sites on the 7.5 acre MURR site. The nearest recorded archaeological site is approximately 1000 feet (304.8 m) from the facility. See attached topographical map (Attachment 6).
- 4. Please state if the MURR is located in an area previously surveyed for historic properties, or a National Register District, or a local historic district. If so, please provide the name of the survey or district.
The attached topographical map (Attachment 7) illustrates the proximity of National Register Sites, National Register Districts, and Certified Local Districts to the facility. There are no National Register Districts, or local historical districts on or near the 7.5 acre MURR site.
The closest National Register site, the Sanford F. Conley House, is located approximately one mile (1.6 km) from the facility. A State historic site, the Jewell Cemetery, a 0.45 acre historic cemetery, is located approximately 0.9 miles (1.5 kin) from the MURR site.
3
- 5. Please provide photographs of all structures. All photographs should be labeled and keyed to one map of the project area. Photographsmust be clear black and white or color photographs on photographic paper, of minimum 3" x 5 "size. Polaroid's, photocopies, emailed, or faxed photographs are not acceptable. Photographsof neighboringor nearby buildings are also helpful and should be labeled and keyed to one map of the project area.
Attached are twelve (12) 4" x 6" color photographs (Attachment 8) of all of the MURR site structures. The photos are labeled and keyed to the attached map of the MURR site (Attachment 9). Arrows on the map depict the directions that the photographs were taken.
- 6. Please provide a briefhistory of the building(s), including construction dates and building uses.
The MURR was originally constructed in 1963-65 with two structures: the main building, which houses the Laboratory and Reactor Containment Buildings, and the associated Cooling Tower. The main building is now colloquially known as the "Laboratory Building." Several additions and an additional building have been added over the years.
For reference, please see the attached site map (Attachment 10) of these locations.
Cooling Tower 3 rd cell: The Cooling Tower was originally built as a two cell tower. A third cell was added in 1972 to support the upgrade in power from 5 to 10 MWs.
Room 231 Addition: A complex of three rooms, now called Rooms 231A, B, and C, was added to the west side of the Laboratory Building in late 1978. These rooms were originally used for machine shop spaces, and have undergone many transitions over the intervening years. This space is currently used for offices, a welding shop, and a shipping work space.
Temporary Office Buildings #1 and #2: In 1990, in order to accommodate a growing staff, Temporary Office Buildings (TOBs) were added to the west side of the Laboratory Building, extending from the north outer corridor. These and the other TOBs are trailers mounted on concrete pads, rather than permanent structures.
Emergency Diesel Generator Addition: An additional two rooms were added in 1990 extending west from the Room 231 addition to accommodate a newer and larger capacity Emergency Diesel Generator (EDG) and an electrical Substation.
Temporary Office Building #3: Additional office space was added in 1992 in the form of a TOB, which extends south from the Laboratory Building, just west of the east loading dock.
Temporary Office Buildings #4 and #5: Additional office space was again added in 1999-2000, this time to the northwest side of the Laboratory Building, opposite TOBs #1 and #2.
Industrial Building Addition: A 60,000 sq ft shell industrial building was added in 2002 to the southwest of the Laboratory Building. This space has housed clean rooms, processing, and laboratories, along with storage and shipping functions.
North Office Addition: In 2007, a large addition was added to the northeast of the Laboratory Building, adding space for offices, conference rooms, a shell space to build out for classrooms and laboratories, and a cyclotron facility. Construction of the North Office Addition (NOA) also moved the facility front entrance from the Laboratory Building lobby to the area between the Laboratory Building and NOA.
4
Shipping and Receiving Building: In an effort to minimize traffic within the 7.5 acre facility site, the Shipping and Receiving Building was built to the southeast of the main building complex in 2009-2010. This building allows couriers to drop off or pick up packages at MURR without entering the fenced area. This building is the only structure other than the cooling tower which is detached from the Laboratory Building.
5
ATTACHMENT I 0
I Vt> I Cý 0) 0 240 480 720 960 1,200 meters Feeat 0 1,000 2,000 3,000 4,000 The MURR facility (designated "Nuclear Reactor") is located in the Columbia quadrangle, Township 48N, Range 13W, and Section 24. Basemap: USGS 7.5-minute Columbia, MO topographic quadrangle (1967, photorevised in 1981). Prepared by Matthew T. Boulanger, May, 2010.
THIS PAGE IS AN OVERSIZED DRAWING OR FIGURE, THAT CAN BE VIEWED AT THE RECORD TITLED:
ATTACHMENT 2 COLUBIA QUADRANGLE MISSOURI-BOONE CO.
7.5 MINUTE SERIES (TOPOGRAPHIC).
WITHIN THIS PACKAGE...OR BY SEARCHING USING THE DOCUMENT/REPORT NO.
D-01X
ATTACHMENT 3 1..-
7 720 t 1<
Q30 AA~0O v~0o 666*
GRADING PLAN 0 400' SCALE CUT 15,000 CU. Y,
. FILL 15,000 CUYD.
CUT TREES
/1.0r 0~
gI
.7-.-.~-...--.4---T---.~-.--- --
ATTACHMENT 4 ATTACHMENT 5 ATTACHMENT 6 I~~I Co B-CO) 7
""Vt (nsý) (
2 I
- N
/,/
0 260 520 780 1,040 N Met ers Feet 0 1,000 2,000 3,000 4,000 Known archaeological sites within 1 km of the University of Missouri Research Reactor, as of May 2010.
Site locations are approximate and based on data from the Missouri Department of Natural Resources and the Archaeology Survey of Missouri. Basemap: USGS 7.5-minute Columbia, MO topographic quadrangle (1967, photorevised 1981). Prepared by Matthew T. Boulanger, May, 2010.
ATTACHMENT 7 Meters H Hp NRHP Sites Fe,0 E-tI .
0 1,600 3,200 4,800 6,400 ...
NRHP Districts Historic sites and districts listed on the National Register of Historic Places, and State Historical Sites in the vicinity of the University of Missouri Research Reactor, as of May 2010. Locations are approximate and based on data from the Missouri Department of Natural Resources. Basemap: USGS 7.5-minute Columbia, MO topographic quadrangle (1967, photorevised 1981). Prepared by Matthew T. Boulanger, May, 2010.
ATTACHMENT 8
.0
A 4
-1
I
F
ATTACHMENT 9
/*
Zi2
/
)/
"I" I.
Cooling Tower 1964 Laboratory Building 1964 Cooling Tower Cell #3 1972 Room 231 Addition 1978 Temporary Office Building #1 1990 Temporary Office Building #2 1990 Emergency Diesel Generator Room Addition 1990 /
Temporary Office Building #3 1992 Temporary Office Building #4 1999 Temporary Office Building #5 2000 Industrial Building Addition 2002 North Office Addition 2007 Shipping and Receiving Building 2009 Map of MURR Facility
ATTACHMENT 10 n
t7J!
/
/
II I!
ii.
~I 1.
- 1 Cooling Tower 1964 Laboratory Building 1964 Cooling Tower Cell #3 1972 Room 231 Addition 1978 Temporary Office Building #1 1990 'p'x Temporary Office Building #2 1990 Emergency Diesel Generator Room Addition 1990 Temporary Office Building #3 1992 Temporary Office Building #4 1999 Temporary Office Building #5 2000 Industrial Building Addition 2002 North Office Addition 2007 Shipping and Receiving Building 2009 Map of MURR Facility