UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 14, 2010 LICENSEE: Detroit Edison Company FACILITY: Fermi Power Plant, Unit 2

SUBJECT:

SUMMARY

OF THE MAY 5, 2010, PUBLIC MEETING TO DISCUSS THE 2009 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT On May 5, 2010, the Nuclear Regulatory Commission (NRC) held a public meeting at the Monroe County Board of Commissioners Chambers in Monroe, Michigan. The meeting was between NRC Region III management and Detroit Edison Company representatives to discuss the NRCs assessment of the safety performance of Fermi Power Plant Unit 2 for the period from January 1, 2009, through December 31, 2009. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML100990171 and ML101190209, respectively.

The NRC began the meeting with an overview of the NRCs Mission, the Reactor Oversight Process (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of Fermi Unit 2 performance in 2009, which was documented in the March 3, 2010, End-Of-Cycle assessment letter (ML100610249).

The licensee then provided a response to the NRCs assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure.

/RA by Robert M. Lerch for/

John B. Giessner, Chief Branch 4 Division of Reactor Projects Docket No. 50-341 License No. NPF-43

Enclosure:

As Stated cc w/encl: Distribution via ListServ

PUBLIC MEETING PRINCIPAL ATTENDEES May 5, 2010 Nuclear Regulatory Commission J. Giessner, Chief, Branch 4, Division of Reactor Projects R. Morris, Senior Resident Inspector, Fermi R. Jones, Resident Inspector, Fermi M. Chawla, Project Manager, NRR C. Patel, Project Manager, NRO P. Chandrathil, Public Affairs Officer, RIII M. Learn, Reactor Engineer, DNMS M. Kamprath, Resident Office Assistant, Fermi Detroit Edison Company T. Conner, Plant Manager M. Caragher, Director, Nuclear Engineering C. Walker, Director, Organization Effectiveness W. Colonnello, Director, Nuclear Support R. Johnson, Fermi 2 G. Strobel, Fermi 2 R. Salmon, Fermi 2 S. Hassoun, Fermi 2 G. Cerullo, Fermi 2 R. Thompson, Fermi 2 P. Smith, DTE M. Loy, DTE J. Pendergast, DTE Other Attendees J. Myers, Office of Rep. Dingell F. Mentel, County Commissioner C. Manoleas, Sierra Club E. McArdle, S.E. Mich. Sierra Club M. Meyers

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 14, 2010 LICENSEE: Detroit Edison Company FACILITY: Fermi Power Plant, Unit 2

SUBJECT:

SUMMARY

OF THE MAY 5, 2010, PUBLIC MEETING TO DISCUSS THE 2009 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT On May 5, 2010, the Nuclear Regulatory Commission (NRC) held a public meeting at the Monroe County Board of Commissioners Chambers in Monroe, Michigan. The meeting was between NRC Region III management and Detroit Edison Company representatives to discuss the NRCs assessment of the safety performance of Fermi Power Plant Unit 2 for the period from January 1, 2009, through December 31, 2009. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML100990171 and ML101190209, respectively.

The NRC began the meeting with an overview of the NRCs Mission, the Reactor Oversight Process (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of Fermi Unit 2 performance in 2009, which was documented in the March 3, 2010, End-Of-Cycle assessment letter (ML100610249).

The licensee then provided a response to the NRCs assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure.

/RA by Robert M. Lerch for/

John B. Giessner, Chief Branch 4 Division of Reactor Projects Docket No. 50-341 License No. NPF-43

Enclosure:

As Stated cc w/encl: Distribution via ListServ DOCUMENT NAME: G:\Branch TSS\ALL EOC\EOC CY 2009\EOC Letters\EOC Meeting Summaries\Fermi EOC 09 public meeting summary.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME FTran:dtp JGiessner*RML for DATE 05/13/2010 05/14/2010 OFFICIAL RECORD COPY

Letter to Detroit Edison Company from J. Giessner dated May 14, 2010.

SUBJECT:

SUMMARY

OF THE MAY 5, 2010, PUBLIC MEETING TO DISCUSS THE 2009 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-1 RidsNrrPMFerm2 Resource RidsNrrDirsIpab Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource