Summary of Public Meeting with Exelon Generation Company, LLC, to Discuss the 2009 Dresden Nuclear Power Station Units 2 and 3 End-of-Cycle Performance Assessment
ML101330514
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 05/13/2010
From: Ring M
NRC/RGN-III/DRP/B1
To:
References
Download: ML101330514 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 13, 2010 LICENSEE: Exelon Generation Company, LLC FACILITY: Dresden Nuclear Power Station Units 2 and 3

SUBJECT:

SUMMARY

OF THE APRIL 28, 2010, PUBLIC MEETING TO DISCUSS THE 2009 DRESDEN NUCLEAR POWER STATION UNITS 2 AND 3 END-OF-CYCLE PERFORMANCE ASSESSMENT On April 28, 2010, the U.S. Nuclear Regulatory Commission (NRC) held a public meeting at the Grundy County Administration Building in Morris, Illinois. The meeting was between NRC Region III and Exelon Generation Company representatives to discuss the NRCs 2009 End-of-Cycle Assessment of Dresden Nuclear Power Station Units 2 and 3 safety performance.

The results of that assessment were discussed in a letter to the licensee dated March 3, 2010, which can be found in ADAMS at ML100610336.

The NRC began the meeting with an overview of the NRC and the nuclear industry, the NRCs Reactor Oversight Process (ROP) and national ROP results. This was followed by a summary of the NRCs 2009 assessment of safety performance for Dresden Nuclear Power Station Units 2 and 3. The NRCs meeting presentation slides can be found in ADAMS at ML101200033. A list of principal meeting attendees can be found in the attached Enclosure.

Mr. Tim Hanley, Dresden Site Vice President, provided an oral response to the NRCs assessment. Mr. Hanley concurred with the NRCs assessment that Dresden Nuclear Power Station Units 2 and 3 were operated in a manner that preserved the health and safety of the public and the environment. In addition, Mr. Hanley discussed the licensee's view on both the White finding for uncontrolled rod withdrawal and the substantive cross-cutting issue in the area of Human Resources, Error Prevention Techniques. Mr. Hanley also described some of the actions the licensee is taking to address these issues.

C. Pardee At the end of the meeting, both the NRC staff and the licensee answered a number of questions from members of the public.

/RA/

Mark A. Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-237, 50-249,72-037 License No. DPR-19, DPR-25

Enclosure:

As stated cc w/encl: Distribution via List Serve

C. Pardee At the end of the meeting, both the NRC staff and the licensee answered a number of questions from members of the public.

/RA/

Mark A. Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-237, 50-249,72-037 License No. DPR-19, DPR-25

Enclosure:

As stated cc w/encl: Distribution via List Serve DOCUMENT NAME: G:\1-SECY\1-WORK IN PROGRESS\DRES

SUMMARY

LETTER 04-28-2010.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII N RIII E RIII RIII NAME MRing for ECoffman:cs MRing DATE 05/13 /10 05/13/10 OFFICIAL RECORD COPY

PUBLIC MEETING PRINCIPAL ATTENDEES April 28, 2010 Exelon Generation Company, LLC Tim Hanley, Site Vice President, Dresden Station Shane Marik, Plant Manager, Dresden Station Bob Osgood, Public Affairs, Dresden Station Dennis Leggett, Regulatory Assurance Manager, Dresden Station Jeff Hansen, Licensing Manager, Exelon Nuclear Nuclear Regulatory Commission Gary Shear, Deputy Director, Division Reactor Projects Mark Ring, Branch Chief, Division Reactor Projects Chuck Phillips, Senior Resident Inspector, Dresden Station Daniera Melendez-Colon, Resident Inspector, Dresden Station Karen Gladden, Resident Inspector Office, Dresden Station Viktoria Miltyng, Regional Public Affairs Other Attendees Cecil Settles, IEMA Kay Hansen, Citizen Wanda Alderson, Citizen Charles W. Birch, Citizen Enclosure

Letter to C. Pardee from M. Ring dated May 13, 2010

SUBJECT:

SUMMARY

OF THE APRIL 28, 2010, PUBLIC MEETING TO DISCUSS THE 2009 DRESDEN NUCLEAR POWER STATION UNITS 2 AND 3 END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-2 RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource