ML101320396

From kanterella
Jump to navigation Jump to search
Security Plan Changes Revisions 8 and 9
ML101320396
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 05/04/2010
From: Costanzo C
NextEra Energy Duane Arnold
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
S1-10-17
Download: ML101320396 (2)


Text

NEXTeram ENERC-17L&.4 SAFEGUARDS INFORMATION May 4, 2010 S1-10-17 10 CFR 50.54(p)(2)

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Duane Arnold Energy Center Docket 50-331 License No. DPR-49 Duane Arnold Enerqy Center Security Plan Changes Revision 8 and 9 In accordance with the Code of Federal Regulations, Title 10, Part 50.54(p)(2),

NextEra Energy Duane Arnold, LLC, hereby submits Revision 8 and Revision 9 of the Duane Arnold Energy Center (DAEC) Security Plan. These Revisions incorporate changes required due to recent 10 CFR Part 73 changes as well as other minor changes. It has been determined the changes do not reduce the effectiveness of the DAEC Security Plan and therefore the changes have been made pursuant to 10 CFR 50.54(p)(2). The enclosed -C-ontains Change Synopses for Revision 8 and 9 of the Security Plan as well as copies of Revision 8 and 9 of the Plan. The-GIlso includes an underlined version of Revision 9 of the Plan indicating differences from NEI 03-12 Revision 6, "Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, [and Independent Spent Fuel Storage Installation Security Program]."

RcleO NCopy eFr fjj60fr9iL-The enclosed-G,.

contains "SAFEGUARDS INFORMATION" and must be protected 0,2O accordingly. Unauthorized disclosure could result in civil and/or criminal sanctions.

511' Upon separation this page is "DECONTROLLED."

SAFEGUARDS INFORMATION

ýý 00 (

NextEra Energy Duane Arnold, LLC, 3277 DAEC Road, Palo, IA 52324 1, n NEXli r ENERGY~

SAFEGUARDS INFORMATION May 4,2010 u.s. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Duane Arnold Energy Center Docket 50-331 License No. DPR-49 DUANE ARNOLD SI-10-17 10 CFR 50.54(p)(2)

Duane Arnold Energy Center Security Plan Changes Revision 8 and 9 In accordance with the Code of Federal Regulations, Title 10, Part 50.54(p)(2),

NextEra Energy Duane Arnold, LLC, hereby submits Revision 8 and Revision 9 of the Duane Arnold Energy Center (DAEC) Security Plan. These Revisions incorporate changes required due to recent 10 CFR Part 73 changes as well as other minor changes. It has been determined the changes do not reduce the effectiveness of the DAEC Security Plan and therefore the changes have been made pursuant to 10 CFR 50.54(p )(2). The enclosed #contains Change Synopses for Revision 8 and 9 of the Security Plan as well as copies of Revision 8 and 9 of the Plan. The~lso includes an underlined version of '

Revision 9 of the Plan indicating differences from NEI 03-12 Revision 6, "Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, [and Independent Spent Fuel Storage Installation Security Program]."

'* 1<CCIVEO '%fEJt

, COpy til" S*i.I/;l'/Irri~L

/

/O"J;!1

It NOTE

'-16fJ.ll1JJt; The enclosedts-contains "SAFEGUARDS INFORMATION" and must be protected

, 'dzIJJO accordingly. Unauthorized disclosure could result in civil and/or criminal sanctions.

5/1 Upon separation this page is "DECONTROLLED."

SAFEGUARDS INFORMATION

~OO(

NextEra Energy Duane Arnold, LLC, 3277 DAEC Road, Palo, IA 52324

SAFEGUARDS INFORMATION SI-10-17 May 4, 2010 Page 2 of 2 This letter contains no new commitments and no revisions to existing commitments.

Should you have any questions regarding this matter, please contact Ben Kindred, DAEC Security Manager, at (319) 851-7959.

Christopher R. Costanzo Vice President, Duane Arnold Energy Center NextEra Energy Duane Arnold, LLC cc:

Administrator, Region III, USNRC Resident Inspector, DAEC, USNRC D. Barta w/o CTS Project w/o IRMS A-53 w/o NOTE The enclosed--4 contains "SAFEGUARDS INFORMATION" and must be protected accordingly. Unauthorized disclosure could result in civil and/or criminal sanctions.

Upon separation this page is "DECONTROLLED."

SAFEGUARDS INFORMATION SI-10-17 May 4,2010 Page 2 of 2 SAFEGUARDS INFORMATION This letter contains no new commitments and no revisions to existing commitments.

Should you have any questions regarding this matter, please contact Ben Kindred, DAEC Security Manager, at (319) 851-7959.

UAIoftplWc K LdmJd Christopher R. Costanzo Vice President, Duane Arnold Energy Center NextEra Energy Duan~ Arnold, LLC Enclo6yre (CD) )f cc:

Administrator, Region III, USNRC Resident Inspector, DAEC, USNRC D. Barta wlo CTS Project wlo IRMS A-53 wlo NOTE The enclose~contains "SAFEGUARDS INFORMATION" and must be protected accordingly. Unauthorized disclosure could result in civil andlor criminal sanctions.

Upon separation this page is "DECONTROLLED."

SAFEGUARDS INFORMATION