Ltr. 05/06/2010 Dresden Re Fatigue Management Program Inspection
ML101300467
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 05/06/2010
From: Hironori Peterson
Operations Branch III
To: Pardee C
Exelon Generation Co, Exelon Nuclear
References
Download: ML101300467 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 6, 2010 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555

SUBJECT:

FATIGUE MANAGEMENT PROGRAM INSPECTION

Dear Mr. Pardee:

In a telephone conversation on April 22, 2010, Mr. R. Rybak, of Regulatory Assurance, and Mr. B. Palagi, Lead Inspector, made arrangements for the NRC to inspect the fatigue management program at the Dresden Nuclear Power Station. The inspection is planned for June 17, 2010, and will be conducted in accordance with TEMPORARY INSTRUCTION 2515/180 INSPECTION OF PROCEDURES AND PROCESSES FOR MANAGING FATIGUE.

In order for the NRC to adequately prepare for this inspection, please furnish copies of the site fatigue management policy, procedures, and training materials to the NRC by the week of May 31, 2010. Additionally, to facilitate the efficient conduct of this inspection, please have available on site personnel familiar with the processes used to document, report, and audit the management of the worker fatigue program, to interface with the inspector. Mr. Rybak has been advised of this request and provided with the name and address of the NRC inspector assigned to this inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

C. Pardee Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Bruce Palagi at 630-829-9611, or me at 630-829-9707.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc: Distribution via ListServ

C. Pardee Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Bruce Palagi at 630-829-9611, or me at 630-829-9707.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc: Distribution via ListServ DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-2 RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\\DRS\\WORK IN PROGRESS\\DRE 050610 DRS OL FATIGUE RQI.DOC To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII:DRS RIII:DRS NAME BPalagi:co HPeterson DATE 05/06/10 05/06/10 OFFICIAL RECORD COPY