MONTHYEARML24298A1172024-10-24024 October 2024 Cycle 26, 180-Day Steam Generator Tube Inspection Report CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000327/LER-2024-001, Reactor Trip Due to a Turbine Trip2024-10-17017 October 2024 Reactor Trip Due to a Turbine Trip ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 05000328/LER-2024-001, Reactor Trip Due to an Electrical Trouble Turbine Trip2024-09-25025 September 2024 Reactor Trip Due to an Electrical Trouble Turbine Trip CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24267A0402024-09-19019 September 2024 Cycle 27 Core Operating Limits Report Revision 0 ML24185A1742024-09-18018 September 2024 Cover Letter - Issuance of Exemption Related to Non-Destructive Examination Compliance Regarding Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24253A0152024-09-0808 September 2024 Emergency Plan Implementing Procedure Revisions ML24247A2212024-08-29029 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021 ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24177A0282024-06-25025 June 2024 Emergency Plan Implementing Procedure Revisions ML24176A0222024-06-24024 June 2024 Retraction of Interim Report of a Deviation or Failure to Comply – Transducer Model 8005N ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter ML24145A1052024-05-29029 May 2024 301 Exam Approval Letter ML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24128A0352024-05-0707 May 2024 Providing Supplemental Information to Apparent Violation ML24120A0582024-04-26026 April 2024 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML24116A2612024-04-25025 April 2024 Interim Report of a Deviation or Failure to Comply - Transducer Model 8005N ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 ML24089A0882024-04-18018 April 2024 – Exemption from Select Requirements of 10 CFR Part 73; Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 ML24109A0272024-04-16016 April 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-23-006, Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03)2024-04-15015 April 2024 Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03) ML24106A0502024-04-12012 April 2024 Discharge Monitoring Report (Dmr), February 2024 ML24100A0162024-04-11011 April 2024 Request for Regulatory Conference (Tennessee Valley Authority - Sequoyah Nuclear Plant) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements 2024-09-08
[Table view] |
Text
Tennessee Valley Authority, Post Office Box 2000, Soddy Daisy, Tennessee 37384-2000 May 04, 2010 Chattanooga Environmental Field Office Division of Water Pollution Control State Office Building, Suite 550 540 McCallie Avenue Chattanooga, Tennessee 37402 TENNESSEE VALLEY AUTHORITY - SEQUOYAH NUCLEAR PLANT - TENNESSEE STORM WATER MULTI-SECTOR GENERAL PERMIT FOR INDUSTRIAL ACTIVITIES PERMIT NO.
TNR050015 SECTOR 0 EXCEEDANCE OF THE BENCHMARK MONITORING REQUIREMENT This letter provides the sixty day notification of the review of Sequoyah Nuclear Plant's Storm Water Pollution Prevention Plan (SWPPP) and summary of the Best Management Practices (BMPs) modifications and additions concerning the exceedance of the benchmark monitoring requirement for total recoverable iron for Storm Water Outfall Nos. 1, 2, 15, and 17.
Description of Event Tennessee Storm Water Multi-Sector General Permit for Industrial Activities Sector 0 requires annual monitoring of total recoverable iron. Sequoyah Nuclear Plant sampled for total recoverable iron on March 2, 2010 and March 11,2010. The storm water analytical monitoring results were received on March 8, 2010 and March 19, 2010. The analytical monitoring results for Storm Water Outfalls Nos. 1, 2, 15 and 17 exceeded the benchmark monitoring requirement for total recoverable iron as stated in Table 0-2, Benchmark Monitoring Requirements for Steam Electric Power Generating Facilities.
Storm Water Outfall No. 2 was sampled for total recoverable iron on March 2, 2010 and results were received on March 8, 2010. The analytical monitoring result for Storm Water Outfall No. 2 was 6.3mg/L. The backup sample for Storm Water Outfall No. 2 was sent for analysis on March 8, 2010 and results were received on March 10, 2010. The backup analytical monitoring result for Storm Water Outfall No. 2 was 4.3mg/L. Since the backup sample result was below the benchmark of 5.Omg/L, SQN had the original and the backup samples reanalyzed. The original sample was reanalyzed and the iron results were 5.5mg/L and 5.2mg/L. The backup sample was reanalyzed and the iron results were 5.2mg/L and 5.2mg/L. The average of the six analytical monitoring results for Storm Water Outfall No. 2 was 5.3mg/L. (See Table 1)
Storm Water Outfall Nos. 1, 15, and 17 were sampled for total recoverable iron on March 11, 2010 and results were received on March 19, 2010. The analytical monitoring results for Storm Water Outfall Nos. 1, 15, and 17 were 12.Omg/L, 7.4mg/L, and 6.2mg/L respectively. Backup samples for Storm Water Outfall Nos. 1, 15, and 17 were sent for analysis on March 22, 2010 and results were received on March 26, 2010. The backup analytical monitoring results for Storm Water Outfall Nos. 1, 15, and 17 were 1 1.Omg/L, 7.6mg/L, and 6.9mg/L respectively. The average analytical monitoring results for Storm Water Outfall Nos. 1, 15, and 17 were 11.5mg/L, 7.5mg/L, and 6.6mg/L respectively. (See Table 1)
TABLE 1 Storm Sample Received Original Backup Average Benchmark Water Date Date Sample Sample Sample Monitoring.
Outfall Results Results Results Requirement No. (mg/L) (mg/L) (mgfL) (mg/L) 1 3/11/2010 3/19/2010 12.0 11.0 11.5 5.0 2 3/02/2010 3/08/2010 6.3, 5.5, 5.2 4.3, 5.2, 5.2 5.3 5.0 15 3/11/2010 3/19/2010 7.4 7.6 7.5 5.0 17 3/11/2010 3/19/2010 6.2 6.9 6.6 5.0 Likely Cause of the Exceedance(s)
The likely cause of the exceedances of the benchmark monitoring requirement for total recoverable iron is elevated background iron concentration in the soil around the storm water outfalls (based on historical sampling) and the need for more effective best management practices (BMPs). Sequoyah is examining the use of more effective filtration methods at these outfalls, as discussed in the thirty day notification letter dated April 1, 2010.
Preventative Measures taken to Minimize a Reoccurrence Sequoyah Nuclear Plant's SWPPP has been reviewed to determine the modifications and additions to the plan which would assist in reducing the iron effluent concentration of Storm Water Outfall Nos. 1, 2, 15, and 17.
Storm Water No. 1 Per the SQN SWPPP, there are no paved surfaces in this drainage area. Ground cover consists of rip-rap and grass.
The following modifications will be made within 60 days: The area will be reseeded and new booms will be added around Storm Water No. 1. Storm water sampling and analysis will be conducted during 2010 to determine if these modifications and additions have been effective and if additional measures should be taken.
Storm Water No. 2 Per the SQN SWPPP, there are no paved surfaces in this drainage area. Ground cover consists of crushed stone, gravel, and grass. Drainage ditches are equipped with check dams as BMPs.
The following modifications were made: New hay bales and booms have been placed in the drainage ditch and general housekeeping has taken place in the area around Storm Water No. 2.
Storm water sampling and analysis will be conducted during 2010 to determine if these modifications and additions have been effective and if additional measures should be taken.
Storm Water No. 15 Per the SQN SWPPP, there are no paved surfaces in this drainage area. Ground cover consists of rip-rap and grass. Rock lined drainage ditches are equipped with check dams as BMPs.
The following modifications were made: New booms have been placed in the drainage ditch and general housekeeping has taken place in the area around Storm Water No. 15. Gravel will be added to the drainage ditch within 60 days. Storm water sampling and analysis will be conducted during 2010 to determine if these modifications and additions have been effective and if additional measures should be taken.
Storm Water No. 17 Per the SQN SWPPP, ground cover and erosion controls consist of pavement, gravel, and rip rap in this drainage area.
The following modifications were made: New hay bales and silt fencing have been added in the drainage ditch and general housekeeping has taken place in the area around Storm Water No.
- 17. Storm water sampling and analysis will be conducted during 2010 to determine if these modifications and additions have been effective and if additional measures should be taken.
If you have any questions or need additional information, please contact Ann Hurt at (423) 843-6714 or Stephanie Howard at (423) 843-6700 of Sequoyah's Environmental staff.
I certify under penalty of law that this document and all attachments were preparedunder my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significantpenalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Sincerely, Christopher R. Church Site Vice President Sequoyah Nuclear Plant cc: