Slides from Entergys Presentation on the Turbine Building Siding Damage Investigation
ML101260084
Person / Time
Site: Washington Public Power Supply System
Issue date: 09/08/2008
From:
ABS Consulting, Entergy Corp
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2010-0171
Download: ML101260084 (28)


Text

Turbine Building Siding Damage September Investigation 8, 2008 THE POWER OF PEOPLE

Introduction

  • Root Cause Team Organization
  • Data Gathering
  • Initial Findings
  • Installation Recommendations

"-Entergy THE POWER OF PEOPLE' 2

,*, 'AMSConsulting V,

ISK CGNýýU}tLTlNG*

VIVIS;IN

Root Cause Team Event Analysis _

Paul Bruck, ABS Ben Harrison, ABS Condition Assessment~

~Boh Kon4z Materiai Analysis Boris Goldenberg, LPI iýAlessandro Eldridge, LPI\\

Meteorological Eval, Rolando Vega, ABS THlE POWER~ Of PEOP5'Lm" 3

0!

C ABSUironsulting k RISK

(,ONSU IN DIVIION

Data Gathering Ben Harrison, P.E.

T'HE POWER Of PEOPL ET 4

AB Consulting RISK CONR -ING DIVISION

Easterly face

- ntergy THE POWER Of~ PEOPLEm 5

RISK Consulting

Southern face THlE PO WER Of PEOPLE" a AB Consulting Rl,;SK CONSIUIrNG; EVISION

Westerly face THlE POWER OF PEOPLETU

'4*.* Consulting RISK CONSULTING DIVISION

Girt Close Up Shows Fastener from Panel Bottom is Intact i---'A En tffWv THE POWER OF PEOPLE" 8

-t" (Consulting RISK CONSULTING DIVIS'ION

Wall Panel Attachment Detaile MM!r.,

1R P-ebZ'i Oj vf c44Z*

le-.tya N 0 7E 4 ~

Zi 7,

./Z-~

PLASTEEL PRODUCTS CORPORATION

~~ /10

~

ONDER M40,

~

0Nm LAP DETA/L K-1A1 7-25&~S.

THE POW ER OF PEOPLIET RIS CONSULfINC IVSON

Panel Top Outer Panel Sub Girt Angle at Top of Panel

/

Inside Panel

Top of Panel.

Rivet Sheer Scoring from Rivet in Angle \\

Failure (Girt Shown)

_--Sheared Rivet BSPQ-6 Bottom of C

,,----Girt Eter11 THE POWER OF PEOPLE'u

  • ,
  • Consulting

,RISK C()N

  • I TINOj fIVISIC)N

Inside Panel Bottom Connection Pullover

- Entergy, 12 THE POWER OF PEOPLETM L*i) Cons uing RISK CONSUTING NVIS10)4

Wind Event Summary Rolando Vega, Ph.D., P.E.

--" OEnWtergyO T'HE POWER OF PEOPLE"*

13 RISK Consulting G DSI~VISIN

Definitions of Wind Speed

  • 3 Second Gust

- A gust that is sustained for 3-seconds.

1*1 Hour Wind

- Average of all gusts that occur in that time

" Fastest Mile

- Average wind speed over the shortest time for the wind to travel a mile SEn tergy THE POWER OF PEOPLET 14 CONUrNonsulting

,,, j, t ",

ý,'; ýý,, 1 ý,71 ". ý 11 0

VW, i ý II.....................

!/

Manual Shutdown competej I

I\\ I

~i ~1>

k I~xWind per-ý,.

N 1

A' K;> <4 1

1<

~x ~

U i 1 0 0 :0t0 U:00I i

(~8y E U~it~

Probable gust wind speeds at River Bend LUGal mret. tower- -

Ive[ DHeU I.u I u oparse pine iores[

l u-seconos NWS Baton Rouge Airport 91.0 33 Open field 11-second TTU - StickNet (PRELIMINARY) 67.1 8.2 Open field 1/5 or 1/10 seconds

  • Logarithmic Law for Heit corrections' 8 Durst's curve for averain Tie corrections.
  • Wieringa's Exposure correction factors.

Probable wind speed at River Bend Plant Sorc 3-sec (riph)j

-f astest-mile (mph)

Gmeis Local met. tower (exposure corrected) 64.3 52.7

1.... where the data is averaged spatially or the NOAA - H*WIND (@ 2:30PM) 62.9 51.6 turbulence of the wind is not fully captured.

TTU - StickNet (from preliminary data) I 105.8 NWS Baton Rouge AirportI 92.8

+

86.8 76.1 S2.... where the data better represent the turbulent structure of the wind during the hurricane.

" The probable maximum 3-second gust at 10 meters for the Turbine Building of Entergy at River Bend Nuclear Facility should have been around 100 mph +/- 1Omph.

THE POWER OF PEOPLEO RISK CONSU&TING DIVISION

Wind Speed Damaged Indicators

1. Stand of Pine Trees
2. Cooling Tower 3.

Turbine Building

4. Signage
5. Large Sliding Door
6. Wooden Building Canopy
7. Stand of Pine Trees T EntergO Tile POWER OF PFOPLIEI 17 m

ABConsulting RISK CONSUIING DIVISION

File Edit View Tools Add Help 130 758001 -91 327456686666667 flT1I%~i 1 frI 4ý1 S

NIS,

,4 UWROF PEOPLE"'

18 RISK CNUTConsulting RISK CO.\\SU~i.INC tVI) O0"

WINDGS NNE,E 1

-r

Initial Observations THE POWER OF PEOPLE" 22 ABS Consulting RISK CONSUTIJlNG DIVISION

Structural Considerations

  • Panels Failed Outward.

Scoring on Girts from Fastener Consistent

- Negative Pressure on Side and Rear Walls Pull-Over Capacity of bottom connection Higher load required to fail Therefore, Top Connection Should Fail First

  • Portion of West Girt Not Installed
  • Specification Requirements of Siding Detachment Load of 70 psf Peak Service Load of 50 psf Reserve Capacity on Service Load 70/50 = 1.4
  • Pressure Capacity Of Cladding

- Design Capacity 70 psf

- Preliminary Capacity Estimate 55 psf

- Enterggy 23 THE POWER OF PEOPLIET0

'SConsultin!g RISK CONSULTINn DIVISION

Preliminary Conclusion THE-En terg THlE POWER OF PlEOPLFE 24 Consulting RISK CONSULlING FIVISI(N

Preliminary Conclusions

  • Inspected Panels Not Installed per Design Documents

- Not All Panel Spans.Evaluated

- Large Variance in Rivet Spacing for. Detachment Condition o Detachment Load was Reduced by Installation Deficiencies

  • Wind Evaluation ShOws Evidence of Local Higher Wind Gusts
  • Wind Speeds Were Capable of Achieving Detachment Pressure of 55 psf 25 Consulting T'HE POWER OF PEOPLE" RISK CONSULTING DIVISION

Installation Recommendations

" 'Reinforcement of Comers for Higher Pressures.

" Reevaluate Rivet/Angle Design

- Increase AngleCapacity

- Reduce and Control Rivet Spacing Wind e Complete Installation of Missing Girt THE POWER OF PEOPL E TVKCNS~

N 26 ABSConsulting HISK CONSUIJIMG FINHION

Moving Forward

  • Complete Field Investigation
  • Validate Analysis

- More Detailed Analysis

- Metallurgical Testing

- Laboratory Testing

  • Complete Root.Cause

-En* tergy 27 TilE POWER OF PEOPLE" Analysis RISK CONSULTING 1IIN

Questions THIE POWER~ OF PEOPLE"'

28 RISK CON~S(jti N DIVISIO