MONTHYEARML24228A1922024-07-29029 July 2024 Request for Additional Information Response Due Date Extension E-Mail String ML24192A3642024-06-21021 June 2024 State Rad Health Reply Email Re Draft Environmental Assessment for the Three Mile Island Unit 2 ML24011A2332024-01-11011 January 2024 Request for Additional Information - License Amendment Request (ML23058A064) (EPID L-2023-LLA-0026 - Three Mile Island, U2: Amendment Historic and Cultural Resources) ML24130A2692023-08-30030 August 2023 TMI-2 Consultation Invitation Letter PSA Reply ML24130A2652023-08-21021 August 2023 TMI-2 Consultation Invitation Letter Reply from CAP ML23187A0202023-06-29029 June 2023 TMI Unit 2 RAI Related to the Amended Post-Shutdown Decommissioning Activities Report ML23135A3992023-05-12012 May 2023 (External_Sender) Section 106 Consultation - NRC NHPA for Three Mile Island Unit 2 ML23159A1642023-05-11011 May 2023 Email TMI-2 Pol Am. 67 SE Minor Discrepancies ML23107A2232023-04-14014 April 2023 Response Re State Consultation-TMI-2 Solutions - Draft EA Fonsi Criticality Exemption Request ML23094A1482023-03-30030 March 2023 TMI-2 TS 6.0 Draft Wording Agreement ML23090A2142023-03-30030 March 2023 Asnyder, NRC Email from Tdevik, Energysolutions, Three Mile Island, Unit 2 -Response Regarding MC&A TS Change, Modification ML23094A0602023-03-30030 March 2023 TMI-2 Response on Draft TS Wording ML23068A4682023-03-0909 March 2023 Response Re State Consultation - License Amendment Request TMI-2 Solutions - Update Technical Specifications and Remove Certain License Conditions Applicable to Pdms ML23057A0062023-02-24024 February 2023 State Consultation - License Amendment Request TMI-2 Solutions - Update Technical Specifications and Remove Certain License Conditions Applicable to Pdms ML23051A0412023-02-15015 February 2023 Email from TMI-2 Solutions Regarding Commitment Date, Dated 02/15/2023 ML22364A1942022-12-30030 December 2022 Email Mitigation for Hydrogen Concerns Commitment, Dated December 30, 2022 ML22357A0142022-12-22022 December 2022 NRC Request for Additional Information Related to the TMI-2 Pdms Transition License Amendment Request ML22321A0072022-11-16016 November 2022 Material Control and Accounting RAI Response Clarification Call Docket No 50-320 ML23069A1582022-09-22022 September 2022 NRC Response TMI-2 Solutions Exemption Question ML22214A0482022-08-0101 August 2022 TMI-2 Response: License Amendment Request TMI-2 Solutions Physical Materials Security Plan - Revised Modified License Condition 2.C(2) ML22208A0492022-07-21021 July 2022 State Consultation Response: License Amendment Request TMI-2 Solutions Physical Materials Security Plan ML22199A2762022-07-18018 July 2022 E-mail from A. Snyder, NRC, to B. Werner, PDEP, Regarding State Consultation Proposed Conforming Amendment Related to Proposed Exemption Request from Certain Record Retention Requirements ML22199A2772022-07-15015 July 2022 E-mail Attachment: Federal Register Notice - Volume 87 ML22189A2032022-07-0808 July 2022 E-mail from A. Snyder, NRC, to B. Werner, PA Department of Environment Protection - Three Mile Island, Unit 2 - State Consultation - License Amendment Request TMI-2 Solutions Physical Materials Security Plan ML22189A2042022-06-28028 June 2022 NRC-2022-0131-0001_Content - Federal Register Vol. 87, No. 123 ML22143A8902022-05-23023 May 2022 Request for Additional information- TMI-1 ISFSI Only Physical Security License Amendment Request ML22131A1382022-05-10010 May 2022 E-mail from T. Devik, Energysolutions TMI-2, to A. Snyder, NRC, Physical Security Plan May 9 Submittal Typo Correction ML22125A0162022-05-0303 May 2022 Email from T Devik to a Snyder: Three Mile Island 2 - Security Plan Proposed Revision License Condition 2.C.(2) (EPID: L-2021-LLA-0103) Proposed License Condition - May 3, 2022 Response Courtesy Copy ML22125A0102022-05-0303 May 2022 Proposed Action- Proposed Fonsi for TMI-1 Exemption Request from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) Notification of Commonwealth of Pennsylvania Response ML22125A0092022-05-0303 May 2022 Proposed Action- Proposed Fonsi for TMI-1 Exemption Request from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) Notification of Commonwealth of Pennsylvania ML22125A0132022-04-28028 April 2022 Security Plan Proposed Revision License Condition 2.C.(2) (EPID: L-2021-LLA-0103) Proposed License Condition - Partial Response ML22125A0122022-04-28028 April 2022 Clarification RAI Partial Response Email from C Smith to a Snyder ML22110A0212022-04-19019 April 2022 Security Plan Proposed Revision License Condition 2.C.(2) (EPID: L-2021-LLA-0103) Proposed License Condition ML22110A0202022-04-19019 April 2022 Unit 1 Request for Additional Information ML22108A1762022-04-14014 April 2022 E-mail: Proposed Order Conditions for In-Direct Transfer of Licenses Held by Energysolutions, LLC (Zion, TMI Unit-2, La Crosse Boiling Water Reactor, Kewaunee, Energysolutions Radioactive Materials License, and Energysolutions Export Licens ML22102A3062022-03-31031 March 2022 Email from T. Divik, Energy Solutions, to A. Snyder Clarification of Security License Condition Amendment Request ML22094A1812022-03-22022 March 2022 Licensee High Confidence Dates for Submittals ML22108A1022022-03-18018 March 2022 Email from A. Snyder, NRC to G. Van Noordennen, Energy Solutions, Clarification Request - September 21, 2021 Supplement- TMI-2 Physical Security Plan LAR ML22090A0142022-03-17017 March 2022 TMI, Unit 1 - Commonwealth of PA Response to Request for Consultation on the Proposed Revision to the License and the Permanently Defueled Technical Specifications to Align to the Requirements for Permanent Removal of Spent Fuel from the Sp ML22070A1202022-03-10010 March 2022 E-mail from S. Acker, PADEP, to A. Snyder, NRC - Three Mile Island Unit 1, State Consultation - License Amendment Request TMI-1 in Support of the ISFSI Only Security Plan License Amendment Request ML22068A1792022-03-0909 March 2022 Email from a Snyder to Acker State Consultation- License Amendment Request TMI-1 in Support of the ISFSI Only Emergency Plan and Emergency Action Level Scheme ML22068A1672022-03-0909 March 2022 Email from a Snyder to Acker State Consultation - License Amendment Request TMI-1 in Support of the ISFSI Only Security Plan License ML22068A1462022-03-0909 March 2022 Email from a Snyder to Acker Three Mile Island Unit 1, State Consultation- License Amendment Request TMI-1 in Support of the ISFSI Only Tech Spec License Amendment Request ML22090A0232022-03-0909 March 2022 Email from A. Snyder, NRC to Craig Smith, Constellation Energy Generation, License Amendment Request - Proposed ISFSI-Only Technical Specifications, Dated March 9, 2022 ML22047A2392022-02-16016 February 2022 E-mail from D. Kenney to A. Snyder Dated 2/16/2022 TMI Unit 1 Typo Correction to February 8, 2022 Submittal ML22038A9352022-02-0707 February 2022 TMI-2 Pdms LAR Email Dated 2/7/2022 from T. Smith, NRC to G. Van Noordennen ML22034A6702022-02-0303 February 2022 LTR-22-0020 Eric Epstein, E-mail Follow-up on Decommissioning and Tax Question from December 8, 2021 on TMI Cleanup Funding, Docket Id NRC-2021-0230 - Region I Response ML22343A1612021-11-0909 November 2021 Shpo Email 11-9-2021 Alowery to Gvannoordennen and Hpell ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21230A3812021-08-18018 August 2021 TMI-1 ISFSI-Only Security Plan License Amendment Request 2024-07-29
[Table view] |
Text
Lew, David From: Mallett, Bruce Sent: Sunday, November 22, 2009 10:28 AM To: Svinicki, Kristine; Klein, Dale; Weaver, Doug; Sharkey, Jeffry Cc: Collins, Sam; Lew, David; Virgilio, Martin; Johnson, Michael; Batkin, Joshua; Borchardt, Bill
Subject:
Fw: Update on the TMI event Commissioners Klein and Svinicki As you are aware from the HOO highlight, there was a contamination event yesterday at TMI. The note below provides some update. The plan is for a further update today via the HOO. Currently, Region I is planning for that at 4:30 pm. You can call into the ops center to participate in the brief. If you desire more info sooner, Region I is following in their office; Sam Collins or David Lew would be glad to update you. Sam Collins is updating the Chairman this morning.
Bruce O-riginal Message -----
From: Lew, David To: Lew, David; Collins, Sam; Spindler, David, en Elizabeth; Powell, Amy; Grobe, Jack; Johnson, Michael; Roberts, Darrell; Mallett, Bruce; Leeds, Eric; Trocine, Leigh Cc: Screnci, Diane; McNamara, Nancy; McKinley, Raymond; McDermott, Brian; White, John; Newport, Christopher; Bamford, Peter; Barber, Scott; HOO Hod; Kern, David; Brand, Javier; Bellamy, Ronald Sent: Sun Nov 22 10:00:02 2009
Subject:
RE: Update on the TMI event We are revising the time for an internal briefing. Region I will provide an update brief via the HOO at 4:30 pin, after PAO and staff have met with the media. Anyone interested can particpate by calling the HOO.
Separately, one of our SPEs (Scott Barber) will being working on talking points to support the media outre* ch at 2 pm. Nancy McNamara with also be coming into the office to support communication needs for OCA.
-- Original
--- Message -----
From: Lew, David Sent: Sunday, November 22, 2009 9:47 AM To: Collins, Sam; Spindler, David; Hayden, Elizabeth; Powell, Amy; Grobe, Jack; Johnson, Michael; Rober S, Darrell Cc: Screnci, Diane; McNamara, Nancy; McKinley, Raymond; McDermott, Brian; White, John; Newport, Christopher; Bamford, Peter; Barber, Scott; HOO Hoc; Kern, David; Brand, Javier; Bellamy, Ronald
Subject:
Update on the TMI event The HOO has established a bridge for Region I to facilitate internal communications and coordination in response to the anticipated media issues. The staff should provide information via this bridge by calling t e HOO and asking to be put on the TMI bridge. We will be looking to set up a general briefing for internal stakeholders later this morning (expected around 11 am).
update on meaia interest:
- 1. Numerous calls last night from external stakeholders were address but the HOO and Region I PAO; however, few calls were received after 2 am this morning.
- 2. The Region I PAO (Diane Screnci), a DRS Branch Chief (John White) and a senior Health Physicists (Ron Nimitz) will be on site today. Tentatively, they will meet with the media at 2 pm at the training center to ansver questions.
3.-he staff continues to monitor media interest on the web.
,.,ýExelon public affairs will been meeting with the media this morning.
1/
I Update on the plant
- 1. The licensee has completed the whole body count of about 150 workers in containment. 20 of these workers had estimated between 10 mrem and 36 mrem. 5 of these workers initially show higher doses, but th results are suspect and are being evaluated.
- 2. The licensee continues to maintain a tarp on the containment hole for the SG replacement.
- 3. Two potential causes of the airborne contamination event are being reviewed. The first is associated with welding activities on a small plug inside the skirt on the bottom of the B SG, during which the associated HEP filter which is powered via an extension cord was found tripped. The other is pipe decontamination and preparation activities associated with the A cold leg, which they identified high contamination on the outside of a wet vac located near the work.
- 4. Both these two activities are located in the D ring. The license has maintained a hold on work in these areas, as they continue to assess the cause and clean up areas of high containment.