Text
Thomas L. Harding R.E. Ginna Nuclear Power Plant, LLC Director - Licensing 1503 Lake Road Ontario, New York 14519-9364 585.771.5219 Thomas. HardingJr@cenglIc.com CENG
- a joint venture of ConIstllationt Energy April 13, 2010 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Document Control Desk
SUBJECT:
R.E. Ginna Nuclear Power Plant Docket No. 50-244 Additional Information Associated with Revised Pressure Temperature Limits Report Commitment Change
Reference:
(1)
Letter from T. Harding, Ginna LLC, to NRC Document Control Desk,
Subject:
Commitment Change Associated with the Submittal of a Revised Pressure Temperature Limits Report, dated February 18, 2010.
On February 18, 2010 R.E. Ginna Nuclear Power Plant, LLC (Ginna LLC) submitted a revised commitment date for the submittal of an updated Pressure Temperature Limits Report (PTLR) incorporating the Ginna Capsule "N" test results (Reference 1). Following the submittal a verbal request was made to Ginna LLC by the NRC staff to augment the referenced letter with additional information supporting the revised commitment date.
The Capsule "N" test results have been evaluated and the existing Pressure-Temperature (P-T) limit curves in the current PTLR will remain bounding for plant operation until 34 effective full power years, which is beyond the date at which we plan to implement the revised PTLR.
This letter contains no NRC commitments. If you should you have any questions regarding this submittal, please contact Mr. Thomas Harding at (585) 771-5219 or Thomas. Hard ingJr(cengl 1c.com.
Very Truly Yours, Thomas L. Harding cc: