April 14, 2010 Mr. Joseph H. Plona, Assistant Vice President, Nuclear Generation DTE Energy 6400 North Dixie Hwy Newport, MI 48166
SUBJECT:
REPORT OF APRIL 7, 2010 CATEGORY 1 MEETING, FERMI-1, DOCKET 050-00016 (TAC J00334)
Dear Mr. Plona:
Enclosed is the meeting report for the above referenced meeting. I would like to thank you and your staff for providing an update on the status of the Fermi-1 reactor.
If you have any questions regarding this letter or the enclosure, please contact me at (301) 415-6721, or by e-mail, to Theodore.Smith@nrc.gov.
In accordance with 10 CFR 2.390 of the U.S. Nuclear Regulatory Commissions (NRC=s) ARules of Practice for Domestic Licensing Proceedings and Issuance of Orders,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC=s Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Theodore Smith, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 050-00016
Enclosure:
Meeting Report
April 14, 2010 Mr. Joseph H. Plona, Assistant Vice President, Nuclear Generation DTE Energy 6400 North Dixie Hwy Newport, MI 48166
SUBJECT:
REPORT OF APRIL 7, 2010 CATEGORY 1 MEETING, FERMI-1, DOCKET 050-00016 (TAC J00334)
Dear Mr. Plona:
Enclosed is the meeting report for the above referenced meeting. I would like to thank you and your staff for providing an update on the status of the Fermi-1 reactor.
If you have any questions regarding this letter or the enclosure, please contact me at (301) 415-6721, or by e-mail, to Theodore.Smith@nrc.gov.
In accordance with 10 CFR 2.390 of the U.S. Nuclear Regulatory Commissions (NRC=s) ARules of Practice for Domestic Licensing Proceedings and Issuance of Orders,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC=s Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Theodore Smith, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 050-00016
Enclosure:
Meeting Report Distribution:
HFelsher KMcConnell DOrlando RidsRgn3MailCenter Meeting Attendees via E-mail ML101030824 Office DWMEP DWMEP DWMEP Name TSmith CHolston BWatson Date 4/13/2010 4/14/2010 4/14/2010 OFFICIAL RECORD COPY
Enclosure MEETING REPORT DATE:
April 7, 2010 TIME:
11:00 a.m. Eastern PLACE:
Two White Flint North, Room T-8C5 U.S. Nuclear Regulatory Commission Headquarters Rockville, Maryland (NRC)
PURPOSE:
To discuss groundwater characterization and site decommissioning plans for the Fermi-1 reactor.
ATTENDEES:
SEE ATTACHED LIST BACKGROUND:
The Fermi-1 reactor is located at Lagoona Beach, Frenchtown Township, Michigan. The reactor was shutdown in 1972. DTE Energy has been stabilizing the facility by passivating residual sodium and disposing of plant components and systems. DTE Energy has submitted a license termination plan, and plans to terminate their license in 2012.
DISCUSSION:
The meeting was publicly noticed on March 23, 2010, by posting on the U.S. Nuclear Regulatory Commission web site. The meeting began at approximately 11:00 a.m. EST. The following issues were discussed during the meeting:
- 1.
NRC (Ted Smith) made introductions and an opening statement, including opportunity to provide meeting feedback.
- 2.
DTE Energy (Lynne Goodman) presented the status of the Fermi-1 site groundwater conceptual model, well and sump monitoring locations and recent sampling results.
ACTION ITEMS:
NRC agreed to coordinate a call to discuss embedded piping in the next few weeks.
DTE agreed to continue working on a revised groundwater characterization report.
Attachments:
- 1. Meeting Agenda
- 2. Attendee List
AGENDA Public Meeting - NRC & Fermi-1 Status Report on Groundwater Characterization and Site Decommissioning Planning Date Time Wednesday April 7, 2010 11:00 a.m. - 4:00 p.m.
Session Time Topic Participants 11:00 a.m.
Introductions, clarification of Aground rules@
concerning public portion of meeting and opening remarks NRC/Fermi-1 11:15 a.m.
Fermi-1 staff presentation on groundwater characterization report, and recent sampling results.
Fermi-1 1:30 p.m. - 2:15 Break for lunch NRC/ Fermi-1 4:00 p.m.
Adjournment
MEETING ATTENDEES Date: April, 7, 2010 Topic: Fermi-1 Groundwater Characterization NAME AFFILIATION Lynne Goodman DTE John Garges DTE contractor Ted Smith NRC/FSME Bruce Watson NRC/FSME Matt Meyer NRC/FSME Leah Spradley NRC/FSME Hans Arlt NRC/FSME