UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 April 6, 2010 Mr. Jack M. Davis Senior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166
SUBJECT:
FATIGUE MANAGEMENT PROGRAM INSPECTION
Dear Mr. Davis:
In a telephone conversation on March 3, 2010, Mr. S. Hassoun, Fermi Licensing Supervisor, and Mr. B. Palagi, Lead Inspector, made arrangements for the NRC to inspect the fatigue management program at the Fermi Power Plant. The inspection is planned for May 20, 2010, and will be conducted in accordance with TEMPORARY INSTRUCTION 2515/180 INSPECTION OF PROCEDURES AND PROCESSES FOR MANAGING FATIGUE.
In order for the NRC to adequately prepare for this inspection, please furnish copies of the site fatigue management policy, procedures, and training materials to the NRC by the week of April 19, 2010. Additionally, to facilitate the efficient conduct of this inspection, please have available on site personnel familiar with the processes used to document, report, and audit the management of the worker fatigue program, to interface with the inspector. Mr. Hassoun has been advised of this request and provided with the name and address of the NRC inspector assigned to this inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
J. Davis Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Bruce Palagi at 630-829-9611, or me at 630-829-9707.
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-341 License Nos. NPF-43 cc: Distribution via ListServ
J. Davis Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Bruce Palagi at 630-829-9611, or me at 630-829-9707.
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-341 License Nos. NPF-43 cc: Distribution via ListServ DISTRIBUTION:
Susan Bagley RidsNrrDorlLpl3-1 Resource RidsNrrPMFermi2 Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\\DRS\\WORK IN PROGRESS\\FER 040610 DRS OL FATIGUE RQI.DOC To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII:DRS RIII:DRS NAME BPalagi:co HPeterson DATE 03/30/10 04/06/10 OFFICIAL RECORD COPY