Letter Sequence RAI |
---|
|
|
MONTHYEARML0933506002009-11-24024 November 2009 Fourth Interval Inservice Testing Program Plan and Proposed Alternatives and Relief Requests Project stage: Request ML0935801512009-12-24024 December 2009 Acceptance Review, 4th Interval Inservice Testing (IST) Program Relief Requests Project stage: Acceptance Review ML1009603862010-04-0606 April 2010 E-mail from V. Sreenivas to D. Heacock, Request for Additional Information, Relief Request for Fourth 10-Year Interval Inservice Testing Program for Pumps and Valves Project stage: RAI ML1011705892010-04-27027 April 2010 Response to Request for Additional Information Fourth Interval Inservice Testing Program Plan and Proposed Alternatives and Relief Requests Project stage: Response to RAI ML1014401282010-05-20020 May 2010 Revised Pump Relief Request P-1, Fourth Interval Inservice Testing Program Plan Project stage: Request ML1023600412010-08-19019 August 2010 Fourth Interval Inservice Testing Program Plan, Pump Relief Request P-6, Response to Request for Additional Information Project stage: Response to RAI ML1024602232010-09-30030 September 2010 Fourth 10-Year Interval Inservice Inspection (ISI) Program, Pumps and Valves Project stage: Other ML1030600972010-11-15015 November 2010 (Naps), Units 1 and 2, Fourth 10-Year Inservice Testing Interval Program, Pumps and Valves Relief Request (RR) (TAC Nos. ME2776 and ME2777) Project stage: Other 2010-04-27
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML23320A1122024-01-18018 January 2024 NRC to Fws, Concurrence with Endangered Species Act Determinations for North Anna Power Station, Units 1 and 2, Subsequent License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment ML23355A2722023-12-21021 December 2023 NRR E-mail Capture - Schedule Revision for Emergency Preparedness Staff Augmentation Times License Amendment Request ML23318A1172023-11-13013 November 2023 NRR E-mail Capture - Formal Issuance of RAIs for North Anna Technical Support Center (TSC) License Amendment Request (LAR) (L-2023-LLA-0006) ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23219A1602023-08-0707 August 2023 003 Radiation Safety Baseline Inspection Information Request ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23075A0232023-03-15015 March 2023 NRR E-mail Capture - RAI - License Amend Req (LAR) to Revise Tech Spec (Ts) 3.6.8 Limiting Condition for Operation to Remove Refueling Water Chemical Addition Tank and Replace the Containment Sump Buffer North Anna, 1 and 2 (L-2022-LLA-0162 ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23060A0932023-03-0101 March 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry/North Anna Emergency Plans LAR ML23059A2282023-02-28028 February 2023 NRR E-mail Capture - Draft RAIs for Containment Buffer Change to Natb (L-2022-LLA-0162) ML23039A1712023-02-0808 February 2023 NRR E-mail Capture - Acceptance Review for Technical Support Center (TSC) Relocation (L-2023-LLA-0006) ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML22342B1472022-12-0808 December 2022 NRR E-mail Capture - Acceptance Review for LAR Re NAPS Post LOCA Buffer Change (L-2022-LLA-0162) ML22335A4842022-12-0101 December 2022 NRR E-mail Capture - Acceptance Review for LAR North Anna Power Station - Units 1 and 2 and Surry Power Station - Units 1 and 2 Emergency Plan Staff Augmentation Times (L-2022-LLA-0166) ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22104A0252022-04-14014 April 2022 NRR E-mail Capture - Dominion Presentation Slides for April 21, 2022 Public Meeting on Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station ML22083A2102022-03-24024 March 2022 NRR E-mail Capture - Draft RAI - Relief Request N2-14-LMT-003 Fourth Ten Year Inservice Inspection Interval ML22032A0962022-02-0101 February 2022 002 Radiation Safety Baseline Inspection Information Request ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22007A2672022-01-0707 January 2022 NRR E-mail Capture - North Anna, Unit 2, ASME Section XI Inservice Inspection Program Relief Request N2-14-LMT-003 Fourth Interval Third Period Limited Examinations (L-2021-LLR-0088) ML21335A0812021-12-0101 December 2021 NRR E-mail Capture - Acceptance Review for OMN-28 Request Alternative to ISTC-3700, Position Verification Testing (L-2021-LLR-0086) ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21327A3652021-11-23023 November 2021 NRR E-mail Capture - Draft RAI for TSTF-577 LAR ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21322A0962021-11-18018 November 2021 Final Request for Additional Information Set 5 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21312A0082021-11-0404 November 2021 Enclosure 2 - NAPS Draft SER Table A.1-1 Markup ML21312A0112021-11-0404 November 2021 Enclosure 3 - NAPS Draft SER Section 3 Comments ML21312A0012021-11-0404 November 2021 Comments on North Anna Draft SER ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21274A0022021-09-30030 September 2021 NRR E-mail Capture - Acceptance Review for TSTF-577 LAR (L-2021-LLA-0158) ML21312A0022021-09-21021 September 2021 Enclosure 1 - E-mail - NAPS SLR SER Appendix a for Dominion Review ML21312A0072021-09-21021 September 2021 Enclosure 1 - E-mail - Enclosure B - NAPS SER App a - Dominion Comments 9-21-2021 ML21312A0032021-09-21021 September 2021 Enclosure 1 - E-mail - Enclosure a - Dominion Table A4.4-1 Clean Version ML21256A0672021-09-13013 September 2021 Final Request for Confirmation of Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21152A1722021-09-0707 September 2021 NRC to Fws, NRC Issuance of Draft Environmental Impact Statement for North Anna Subsequent License Renewal, Opportunity for Public Comment, and Endangered Species Act Determinations ML21238A0942021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21225A5512021-08-13013 August 2021 Discussion Point for Public Meeting Regarding Fire Protection Piping Cyclic Loading - Transmittal E-mail ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21188A1632021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21154A0152021-06-0101 June 2021 NRR E-mail Capture - Acceptance Review for Primary Grade Water LAR (L-2021-LLA-0082) ML21140A3682021-05-20020 May 2021 Response to North Anna Hardship (Temporary Staff Guidance Additional Guidance for FOF Inspections During the PHE) ML21140A3712021-05-19019 May 2021 FOF Discussion ML21123A2972021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - E-mail ML21091A0022021-04-0101 April 2021 Final Request for Additional Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21076A4622021-03-17017 March 2021 NRR E-mail Capture - Draft RAI for Versatile Internals and Component Program for Reactors Vipre Code Review (L-2021-LLT-0000) ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21069A3522021-03-10010 March 2021 NRR E-mail Capture - Acceptance Review for Topical Report DOM-NAF-2 VIPRE-D 2024-01-18
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23318A1172023-11-13013 November 2023 NRR E-mail Capture - Formal Issuance of RAIs for North Anna Technical Support Center (TSC) License Amendment Request (LAR) (L-2023-LLA-0006) ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23219A1602023-08-0707 August 2023 003 Radiation Safety Baseline Inspection Information Request ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23081A5282023-04-26026 April 2023 Request for Additional Information - North Anna Subsequent License Renewal Application Environmental Review ML23075A0232023-03-15015 March 2023 NRR E-mail Capture - RAI - License Amend Req (LAR) to Revise Tech Spec (Ts) 3.6.8 Limiting Condition for Operation to Remove Refueling Water Chemical Addition Tank and Replace the Containment Sump Buffer North Anna, 1 and 2 (L-2022-LLA-0162 ML23060A0932023-03-0101 March 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry/North Anna Emergency Plans LAR ML23059A2282023-02-28028 February 2023 NRR E-mail Capture - Draft RAIs for Containment Buffer Change to Natb (L-2022-LLA-0162) ML22251A1292022-09-0909 September 2022 Request for Additional Information Related to Response to Generic Letter 2004-04 ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22083A2102022-03-24024 March 2022 NRR E-mail Capture - Draft RAI - Relief Request N2-14-LMT-003 Fourth Ten Year Inservice Inspection Interval ML21327A3652021-11-23023 November 2021 NRR E-mail Capture - Draft RAI for TSTF-577 LAR ML21322A0962021-11-18018 November 2021 Final Request for Additional Information Set 5 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21322A0992021-11-18018 November 2021 Final Request for Additional Information Set 5 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21256A0672021-09-13013 September 2021 Final Request for Confirmation of Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21256A0692021-09-13013 September 2021 Final Request for Confirmation of Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Request for Confirmation of Information ML21238A0942021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21238A0982021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21225A5022021-08-13013 August 2021 Request for Additional Information for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Appendix E of Fleet Report Com-Naf-2 (EPID:L02021-LLT-0000) Public Version ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21188A1632021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21188A1652021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21174A1952021-06-23023 June 2021 Safety RAIs - Set Y - Draft - Enclosure ML21166A3512021-06-15015 June 2021 Safety RAIs - Set 4 - Draft ML21123A2972021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - E-mail ML21123A2982021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21091A0032021-04-0101 April 2021 Final Request for Additional Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure 1 - RAIs ML21091A0042021-04-0101 April 2021 SLRA Safety Review - Withdrawn Requests for Information (EPID No. L-2020-SLR-0000) - Enclosure 2 ML21076A4622021-03-17017 March 2021 NRR E-mail Capture - Draft RAI for Versatile Internals and Component Program for Reactors Vipre Code Review (L-2021-LLT-0000) ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21063A5602021-03-0404 March 2021 Final Request for Additional Information Set 1 - North Anna SLRA Safety Review (EPID L-2020-SLR-0000) - Enclosure ML21049A0212021-02-17017 February 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000338/2021012 and 05000339/2021012) and Request for Information (RFI) ML21028A3902021-01-29029 January 2021 Request for Additional Information - North Anna Subsequent License Renewal Application Environmental Review (EPID Number: L-2020-SLE-0000) (Docket: 50-338 and 50-339) ML21028A4352021-01-28028 January 2021 Notification of Target Set Inspection and Request for Information (NRC Inspection Report No. 05000338/2021404 and 05000339/2021404) ML21012A3412021-01-22022 January 2021 Requests for Confirmation of Information for the Environmental Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application (EPID Number: L-2020-SLE-0000) (Docket: 50-338 and 50-339) ML21019A4512021-01-19019 January 2021 Notification of Inspection and Request for Information ML20316A0422020-11-10010 November 2020 NRR E-mail Capture - FW: Draft RAI for North Anna Unit 2 Steam Generator Tube Inspection Report (ML19179A075) ML20223A3412020-08-10010 August 2020 003 Radiation Safety Baseline Inspection Information Request ML20218A4282020-08-0505 August 2020 Notification of Inspection and Request for Information ML20125A0762020-05-0101 May 2020 NRR E-mail Capture - Draft RAI Related to Revised Reactor Vessel Material Surveillance Capsule Withdrawal Schedule Dominion Energy Virginia North Anna Power Station Units 1 and 2 (L-2020-LLL-0038) ML20113A5792020-04-21021 April 2020 NRR E-mail Capture - Draft RAI North Anna Fifth 10-year Interval Relief Request (L-2020-LLR-0023) ML19354B6142019-12-20020 December 2019 NRR E-mail Capture - Draft RAI for North Anna Relief Request P-9 ML19317F1042019-11-0707 November 2019 NRR E-mail Capture - Draft RAIs for SB LOCA LAR (Non Prop) ML19191A2512019-07-10010 July 2019 NRR E-mail Capture - Request for Additional Information Open Phase Condition LAR ML19169A0962019-06-17017 June 2019 NRR E-mail Capture - Request for Additional Information Emergency Action Level Scheme Change for Millstone Power Station - Units 1, 2, and 3, North Anna Power Station - Units 1 and 2, and Surry Power Station - Units 1 and 2 ML19162A0052019-06-10010 June 2019 NRR E-mail Capture - Draft RAIs for Dominion EAL Scheme Change ML19108A1902019-04-18018 April 2019 Emergency Preparedness Program Inspection Request for Information ML19060A2432019-03-0101 March 2019 Related to License Amendment Request to Address Open Phase Conditions ML18337A1312018-11-29029 November 2018 NRR E-mail Capture - North Anna SPRA (Fukushima 50.54f) Audit Follow-Up Clarification Question on Plant Modifications 2023-09-14
[Table view] |
Text
From: Sreenivas, V Sent: Tuesday, April 06, 2010 1:44 PM To: 'david.heacock@dom.com' Cc: 'david.sommers@dom.com'; 'Tom Shaub'; Kulesa, Gloria; Cotton, Karen; Bedi, Gurjendra; McMurtray, Anthony
Subject:
NORTH ANNA, UNITS 1 AND 2, REQUEST FOR ADDITIONAL INFORMATION-Relief Request for Fourth 10-year Interval Inservice Testing Program for Pumps and Valves REQUEST FOR ADDITIONAL INFORMATION (RAI) FOR NORTH ANNA POWER STATIONS (NAPS)
(TAC Nos ME2748, ME2749, ME2753 thru ME2760, ME2763 thru ME2772, and ME2776 thru ME2789)
By letter dated November 24, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML093350600), Virginia Electric and Power Company, (the licensee) submitted Fourth Interval Inservice Testing (IST) Program Relief Requests from certain Code requirements for P-1 thru P-8 for pumps, and V-1 thru V-3 for North Anna Power Station, Units 1 and 2, respectively.
RAI P-1-1: Pump Relief Request No. P-1, Section 4.0, Reason for Request, first paragraph, second line states There is at least one pump in each group with at least one vibration reference value (Vr) that is currently less than 0.05 inch per second (ips). Please specify and clarify which pump(s) from each of the pump groups have vibration reference value less than 0.05 ips, because this relief request is only applicable to pumps whose measured reference value (Vr) is less than 0.05 ips.
RAI P-1-2: Pump Relief Request No. P-1, Section 4.0, Reason for Request, third paragraph, second line states This minimum value will be applied to individual vibration locations for the pumps listed in Table P-1 where the measured reference value is less than 0.05 ips. Please verify and confirm that each pump listed in Table P-1 has at least one reference value less than 0.05 ips.
RAI P-1-3: Pump Relief Request No. P-1, Section 4.0, Reason for Request, does not include information on (1) bearing temperature measurement and trending; (2) thermography analysis; and (3) enhanced vibration monitoring, as part of NAPS Predictive Maintenance Program (PdM). Please confirm that the PdM at NAPS, Units 1 and 2 includes information such as bearing temperature trending, thermographic analysis, and enhanced vibration monitoring.
RAI P-1-4: Pump Relief Request No. P-1, Section 7.0, Precedents, the last paragraph, states that Note that Relief Request P-1 applies to all pumps within the group listed in Table P-1. Pumps 1-CH-P-1B, 1- HV-P-20C and 1-RS-P-3B for NAPS Unit 1, and 2-CH-P-1A, 2-CH-P-1C, 2-FW-P-3B, 2-HV-P-20C and 2-SI-P-1B for NAPS Unit 2 do not have a measured reference value below 0.05 ips for a particular vibration location but are included in the relief request scope. Please provide the measured reference values for these pumps.
RAI-P-5-1: Pump Relief Request No. P-5, Section 5.0, Proposed Alternative and Bases for Use, second paragraph, first line states The removal of quarterly flow testing of these pumps has been deemed acceptable per NRC Generic Letter (GL) 89-04, Position 9. Please note that the use the GL 89-04, Position 9 requires that data (differential pressure and vibration) collected during minimum-flow testing (quarterly) and data from full flow (cold-
shutdown or refueling outage) should be trended as required by IWP-6000 (Now it is ISTB-6000). Relief Request P-5 does not discuss trending of the measured data while using GL 89-04, Position 9. Please confirm that the trending of measured data will be performed at NAPS, Units 1 and 2 for P-5 as required by GL 89-04, Position 9.
RAI-P-6-1: Pump Relief Request No. P-6, Section 4.0, Reason for Request, ISTB-3300(e)(1), first paragraph, fourth line states that the The LOCA containment analysis flow rate of 3350 gpm will be used as the pump design flow. In the NAPS, Units 1 and 2 previous (third) 10-year IST program, the design flow used for these pumps 1-RS-P-2A/2B and 2-RS-P-2A/2B was 3640 gpm. Please explain the different design flow values for these pumps.
Docket Nos. 50-338, 50-339 for NAPS Please submit the docketed response to these RAI's by May 5, 2010. If you have any questions, please contact me at 301-415-2597.
V. Sreenivas, PH.D., C.P.M.,
Project Manager, LPL2-1, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation The image cannot be display ed. Your computer may not hav e enough memory to open the image, or the image may hav e been corrupted. Restart y our computer, and then open the file again. If the red x still appears, y ou may hav e to delete the image and then insert it again.
E-mail Properties Mail Envelope Properties (AF843158D8D87443918BD3AA953ABF780CE73E4F0D)
Subject:
NORTH ANNA, UNITS 1 AND 2, REQUEST FOR ADDITIONAL INFORMATION-Relief Request for Fourth 10-year Interval Inservice Testing Program for Pumps and Valves Sent Date: 4/6/2010 1:43:37 PM Received Date: 4/6/2010 1:43:00 PM From: Sreenivas, V Created By: V.Sreenivas@nrc.gov Recipients:
david.heacock@dom.com ('david.heacock@dom.com')
Tracking Status: None david.sommers@dom.com ('david.sommers@dom.com')
Tracking Status: None tom.shaub@dom.com ('Tom Shaub')
Tracking Status: None Gloria.Kulesa@nrc.gov (Kulesa, Gloria)
Tracking Status: None
Karen.Cotton@nrc.gov (Cotton, Karen)
Tracking Status: None Gurjendra.Bedi@nrc.gov (Bedi, Gurjendra)
Tracking Status: None Anthony.McMurtray@nrc.gov (McMurtray, Anthony)
Tracking Status: None Post Office:
HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 20216 4/6/2010 image001.jpg 1965 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: