ML100920204
| ML100920204 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 04/02/2010 |
| From: | Gerald Mccoy NRC/RGN-II/DRP/RPB5 |
| To: | Heacock D Virginia Electric & Power Co (VEPCO) |
| References | |
| Download: ML100920204 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 April 2, 2010 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
NOTIFICATION OF RELOCATION OF U. S. NUCLEAR REGULATORY COMMISSION, REGION II OFFICES
Dear Mr. Heacock:
On April 12, 2010, the Region II offices will be relocated to another building in the downtown Atlanta area. Beginning April 12, 2010, all routine correspondence should be sent to the following address; U.S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 The Marquis One Tower is part of the Peachtree Center office complex and is located at the Peachtree Center stop (N1) on the north line of the MARTA mass transit rail system. Should you visit Region II visitors will be registered by and receive a Region II visitor badge from the NRC receptionist office located on the 12th floor of the Marquis One Tower. Region II staff will be located on floors 9 through 14.
In addition, our address for mailing classified information to Region II will change. Region II will be approved to receive classified information up to the Secret level, either National Security Information or Restricted Data, at the following address only; Outer Envelope:
U.S. Nuclear Regulatory Commission, Region II P. O. Box 56267 Atlanta, GA 30343 Inner Envelope:
U.S. Nuclear Regulatory Commission, Region II ATTN: (Intended Recipient)
P. O. Box 56267 Atlanta, GA 30343
VEPCO 2
Marking and transmission of classified information remains the same. Please refer to Title 10 of the Code of Federal Regulations Part 95.39 for further information.
The telephone extensions for NRC staff members will remain the same as currently being used; however, the dialing prefix will change to (404) 997-xxxx. If you are unable to reach NRC staff member, the main switchboard telephone number is (404) 997-4000. Should you or your staff have any questions or require additional information, please contact me after April 12, 2010 at (404) 997-4551.
Sincerely,
/RA/
Gerald J. McCoy, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket No.: 50-338, 50-339 License No.: NPF-4, NPF-7 cc: (See next page)
VEPCO 3
cc:
Larry Lane Site Vice President Virginia Electric and Power Company Electronic Mail Distribution Eric Hendrixson Director, Nuclear Safety and Licensing Virginia Electric and Power Company Electronic Mail Distribution Chris L. Funderburk Director, Nuclear Licensing & Operations Support Virginia Electric and Power Company Electronic Mail Distribution Lillian M. Cuoco, Esq.
Senior Counsel Dominion Resources Services, Inc.
Electronic Mail Distribution Executive Vice President Old Dominion Electric Cooperative Electronic Mail Distribution Ginger L. Alligood Virginia Electric and Power Company Electronic Mail Distribution Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219 Senior Resident Inspector North Anna Power Station U.S. Nuclear Regulatory Commission P.O. Box 490 Mineral, VA 23117 Michael M. Cline Director Virginia Department of Emergency Services Management Electronic Mail Distribution County Administrator Louisa County P.O. Box 160 Louisa, VA 23093