ML100840472

From kanterella
Jump to navigation Jump to search
Notification of Relocation of U.S. Nuclear Regulatory Commission, Region II Offices
ML100840472
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/26/2010
From: Marvin Sykes
NRC/RGN-II/DRP/RPB3
To: Nazar M
Florida Power & Light Co
References
Download: ML100840472 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 March 26, 2010 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

NOTIFICATION OF RELOCATION OF U. S. NUCLEAR REGULATORY COMMISSION, REGION II OFFICES

Dear Mr. Nazar:

On April 12, 2010, the Region II offices will be relocated to another building in the downtown Atlanta area. Beginning April 12, 2010, all routine correspondence should be sent to the following address; U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 The Marquis One Tower is part of the Peachtree Center office complex and is located at the Peachtree Center stop (N1) on the north line of the MARTA mass transit rail system. Visitors to the Region II office will be registered by and receive a Region II visitor badge from the NRC receptionist office located on the 12th floor of the Marquis One Tower. Region II staff will be located on floors 9 through 14.

In addition, our address for mailing classified information to Region II will change. Region II will be approved to receive classified information up to the Secret level, either National Security Information or Restricted Data, at the following address only; Outer Envelope:

U.S. Nuclear Regulatory Commission, Region II P. O. Box 56267 Atlanta, GA 30343 Inner Envelope:

U.S. Nuclear Regulatory Commission, Region II ATTN: (Intended Recipient)

P. O. Box 56267 Atlanta, GA 30343

FP&L 2

Marking and transmission of classified information remains the same. Please refer to Title 10 of the Code of Federal Regulations Part 95.39 for further information.

The telephone extensions for NRC staff members will remain the same as currently being used; however, the dialing prefix will change to (404) 997-xxxx. If you are unable to reach a NRC staff member, the main switchboard telephone number is (404) 997-4000. Should you or your staff have any questions or require additional information, please contact me at (404) 562-4629 before April 12, 2010 or at (404) 997-4629 after April 12, 2010.

Sincerely,

/RA/

Marvin D. Sykes, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket No.: 50-250, 50-251 License No.: DPR-31, DPR-41 cc: (See next page)

FP&L 3

cc:

Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution Larry Nicholson Director Licensing Florida Power & Light Company Electronic Mail Distribution Michael Kiley Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Niel Batista Emergency Management Coordinator Department of Emergency Management and Homeland Security Electronic Mail Distribution Paul Rubin (Acting) Plant General Manager Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Abdy Khanpour Vice President Engineering Support Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mark E. Warner Vice President, Nuclear Operations South Region Florida Power & Light Company Electronic Mail Distribution Mitch S. Ross Vice President and Associate General Counsel Florida Power & Light Company Electronic Mail Distribution Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Ruben D. Almaguer Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408 (Vacant)

Vice President Nuclear Plant Support Florida Power & Light Company Electronic Mail Distribution Senior Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission 9760 SW 344th St.

Florida City, FL 33035 Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL 32399-1050 Mike A. Shehadeh, P.E.

City Manager City of Homestead Electronic Mail Distribution County Manager of Miami-Dade County 111 NW 1st Street, 29th Floor Miami, FL 33128 Gene St. Pierre Vice President, Fleet Support Florida Power & Light Company Electronic Mail Distribution