MONTHYEARML24011A2332024-01-11011 January 2024 Request for Additional Information - License Amendment Request (ML23058A064) (EPID L-2023-LLA-0026 - Three Mile Island, U2: Amendment Historic and Cultural Resources) ML23187A0202023-06-29029 June 2023 TMI Unit 2 RAI Related to the Amended Post-Shutdown Decommissioning Activities Report ML23135A3992023-05-12012 May 2023 (External_Sender) Section 106 Consultation - NRC NHPA for Three Mile Island Unit 2 ML23159A1642023-05-11011 May 2023 Email TMI-2 Pol Am. 67 SE Minor Discrepancies ML23107A2232023-04-14014 April 2023 Response Re State Consultation-TMI-2 Solutions - Draft EA Fonsi Criticality Exemption Request ML23094A1482023-03-30030 March 2023 TMI-2 TS 6.0 Draft Wording Agreement ML23090A2142023-03-30030 March 2023 Asnyder, NRC Email from Tdevik, Energysolutions, Three Mile Island, Unit 2 -Response Regarding MC&A TS Change, Modification ML23094A0602023-03-30030 March 2023 TMI-2 Response on Draft TS Wording ML23068A4682023-03-0909 March 2023 Response Re State Consultation - License Amendment Request TMI-2 Solutions - Update Technical Specifications and Remove Certain License Conditions Applicable to Pdms ML23057A0062023-02-24024 February 2023 State Consultation - License Amendment Request TMI-2 Solutions - Update Technical Specifications and Remove Certain License Conditions Applicable to Pdms ML23051A0412023-02-15015 February 2023 Email from TMI-2 Solutions Regarding Commitment Date, Dated 02/15/2023 ML22364A1942022-12-30030 December 2022 Email Mitigation for Hydrogen Concerns Commitment, Dated December 30, 2022 ML22357A0142022-12-22022 December 2022 NRC Request for Additional Information Related to the TMI-2 Pdms Transition License Amendment Request ML22321A0072022-11-16016 November 2022 Material Control and Accounting RAI Response Clarification Call Docket No 50-320 ML23069A1582022-09-22022 September 2022 NRC Response TMI-2 Solutions Exemption Question ML22214A0482022-08-0101 August 2022 TMI-2 Response: License Amendment Request TMI-2 Solutions Physical Materials Security Plan - Revised Modified License Condition 2.C(2) ML22208A0492022-07-21021 July 2022 State Consultation Response: License Amendment Request TMI-2 Solutions Physical Materials Security Plan ML22199A2762022-07-18018 July 2022 E-mail from A. Snyder, NRC, to B. Werner, PDEP, Regarding State Consultation Proposed Conforming Amendment Related to Proposed Exemption Request from Certain Record Retention Requirements ML22199A2772022-07-15015 July 2022 E-mail Attachment: Federal Register Notice - Volume 87 ML22189A2032022-07-0808 July 2022 E-mail from A. Snyder, NRC, to B. Werner, PA Department of Environment Protection - Three Mile Island, Unit 2 - State Consultation - License Amendment Request TMI-2 Solutions Physical Materials Security Plan ML22189A2042022-06-28028 June 2022 NRC-2022-0131-0001_Content - Federal Register Vol. 87, No. 123 ML22143A8902022-05-23023 May 2022 Request for Additional information- TMI-1 ISFSI Only Physical Security License Amendment Request ML22131A1382022-05-10010 May 2022 E-mail from T. Devik, Energysolutions TMI-2, to A. Snyder, NRC, Physical Security Plan May 9 Submittal Typo Correction ML22125A0162022-05-0303 May 2022 Email from T Devik to a Snyder: Three Mile Island 2 - Security Plan Proposed Revision License Condition 2.C.(2) (EPID: L-2021-LLA-0103) Proposed License Condition - May 3, 2022 Response Courtesy Copy ML22125A0102022-05-0303 May 2022 Proposed Action- Proposed Fonsi for TMI-1 Exemption Request from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) Notification of Commonwealth of Pennsylvania Response ML22125A0092022-05-0303 May 2022 Proposed Action- Proposed Fonsi for TMI-1 Exemption Request from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) Notification of Commonwealth of Pennsylvania ML22125A0132022-04-28028 April 2022 Security Plan Proposed Revision License Condition 2.C.(2) (EPID: L-2021-LLA-0103) Proposed License Condition - Partial Response ML22125A0122022-04-28028 April 2022 Clarification RAI Partial Response Email from C Smith to a Snyder ML22110A0212022-04-19019 April 2022 Security Plan Proposed Revision License Condition 2.C.(2) (EPID: L-2021-LLA-0103) Proposed License Condition ML22110A0202022-04-19019 April 2022 Unit 1 Request for Additional Information ML22108A1762022-04-14014 April 2022 E-mail: Proposed Order Conditions for In-Direct Transfer of Licenses Held by Energysolutions, LLC (Zion, TMI Unit-2, La Crosse Boiling Water Reactor, Kewaunee, Energysolutions Radioactive Materials License, and Energysolutions Export Licens ML22102A3062022-03-31031 March 2022 Email from T. Divik, Energy Solutions, to A. Snyder Clarification of Security License Condition Amendment Request ML22094A1812022-03-22022 March 2022 Licensee High Confidence Dates for Submittals ML22108A1022022-03-18018 March 2022 Email from A. Snyder, NRC to G. Van Noordennen, Energy Solutions, Clarification Request - September 21, 2021 Supplement- TMI-2 Physical Security Plan LAR ML22090A0142022-03-17017 March 2022 TMI, Unit 1 - Commonwealth of PA Response to Request for Consultation on the Proposed Revision to the License and the Permanently Defueled Technical Specifications to Align to the Requirements for Permanent Removal of Spent Fuel from the Sp ML22070A1202022-03-10010 March 2022 E-mail from S. Acker, PADEP, to A. Snyder, NRC - Three Mile Island Unit 1, State Consultation - License Amendment Request TMI-1 in Support of the ISFSI Only Security Plan License Amendment Request ML22068A1792022-03-0909 March 2022 Email from a Snyder to Acker State Consultation- License Amendment Request TMI-1 in Support of the ISFSI Only Emergency Plan and Emergency Action Level Scheme ML22068A1672022-03-0909 March 2022 Email from a Snyder to Acker State Consultation - License Amendment Request TMI-1 in Support of the ISFSI Only Security Plan License ML22068A1462022-03-0909 March 2022 Email from a Snyder to Acker Three Mile Island Unit 1, State Consultation- License Amendment Request TMI-1 in Support of the ISFSI Only Tech Spec License Amendment Request ML22090A0232022-03-0909 March 2022 Email from A. Snyder, NRC to Craig Smith, Constellation Energy Generation, License Amendment Request - Proposed ISFSI-Only Technical Specifications, Dated March 9, 2022 ML22047A2392022-02-16016 February 2022 E-mail from D. Kenney to A. Snyder Dated 2/16/2022 TMI Unit 1 Typo Correction to February 8, 2022 Submittal ML22038A9352022-02-0707 February 2022 TMI-2 Pdms LAR Email Dated 2/7/2022 from T. Smith, NRC to G. Van Noordennen ML22034A6702022-02-0303 February 2022 LTR-22-0020 Eric Epstein, E-mail Follow-up on Decommissioning and Tax Question from December 8, 2021 on TMI Cleanup Funding, Docket Id NRC-2021-0230 - Region I Response ML22343A1612021-11-0909 November 2021 Shpo Email 11-9-2021 Alowery to Gvannoordennen and Hpell ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21230A3812021-08-18018 August 2021 TMI-1 ISFSI-Only Security Plan License Amendment Request ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application 2024-01-11
[Table view] |
Text
Brand, Javier From: Nimitz, Ronald Sent: Thursday, January 21, 2010 12:31 PM To: Kern, David Cc: Brand, Javier
Subject:
RE: summary of ventilation status next week is fine., thanks From: Kern, David Sent: Thursday, January 21, 2010 11:36 AM To: Nimitz, Ronald Cc: Brand, Javier
Subject:
RE: summary of ventilation status Hi Ron:
I got your message on phone late yesterday. We were doing a lot of containtment and other plant walkdowns in preps for restart. We haven't done our inspection activity yet, but plan to get it done (including feeders) next week. If this doesn't-work, please give me a call and I'll see if we can make some other adjustments here.
Dave.
p.s. Thanks for offering to bring the PC out with you. The week of 2/1/10 is great. This just saves some shipping money and the potential for it to get lost in the warehouse. We'll come out to bring it in from the parking lot after you get here.
From: Nimitz, Ronald Sent: Thursday, January 21, 2010 8:22 AM To: Kern, David; Brand,.Javier
Subject:
RE: summary. of ventilation status Do you folks have any input yet I can put in ??
I am actively working the report here..
ron From: Kern, David Sent: Tuesday, December 22, 2009 3:53 PM To: Nimitz, Ronald; Burket, Elise Cc: Brand, Javier
Subject:
RE: summary of ventilation status Ron's right. Javier and I will be reviewing (and documenting) 3 elements of this event.
- RB flow characterization for the period 11/12 - 11/21/09 (broken into 4 separate segments).
- TMI response to the IR regarding unplanned Co-58 release when not maintaining negative RB pressure (prior to the 11/21 event).
- Station implementation of the containment evacuation procedure on 11/21/09.
Javier said he planned to talk with Elise (possibly work together) and incorporate the work/info she had already done in early event follow-up.
Dave S
From: Nimitz, Ronald Sent: Tuesday, December 22, 2009 11:03 AM To: Burket, Elise Cc: Brand, Javier; Kern, David
Subject:
RE: summary of ventilation status I thought Javiar and Dave were going to write this up plus discuss evacuation ?
From: Burket, Elise Sent: Monday, December 21, 2009-6:20 PM To: Nimitz, Ronald Cc: Brand, Javier
Subject:
summary of ventilation status Hello Ron -
I'm at TMI this week and spoke with Javier yesterday regarding the ventilation investigation for the PCE on 11/21. I did not realize we needed to provide more information. Please see my write-up below and let me and Javier know if this is sufficient. Thanks. Elise NOTE: THIS
SUMMARY
IS
- MAY CONTAIN SENSITIVE/ PROPRIETARY .L I I if DO NOT FORWARD ANY PORTIONS OUT OF NRC WITHOUT FIRST OBTAINING PERMISSION
,,FROM ORIGINATOR About two weeks prior to the PCE, the RB supply fans were removed from service to support heater maintenance (clearance 09500607). The exhaust fans were set-up to start if needed. On 11/18, AR994989 was written voicing concern over the inability to purge the RB and the length of the clearance which was preventing the purge occur. The AR recommends an alternate method be developed to operate purge with supplyfans not available to ensure a negative pressure in the RB during tasks that could create airborne activity. Concerns about the airflow out of the temporary access hole in containment was also expressed in the AR. Per ECR TM 06-00816, "Containment Structural Opening,' if the RB purge is unavailable, an airborne radioactivity monitor shall be established near the temporary construction opening for continuous assessment.
An AMS-4 was stationed at the opening and daily airborne samples were being taken. As stated in the AR and by a chemist, the Co & Cs concentrations increased mid-week prior to the event. At about 2200 on 11/20, the purge was operating or increase the temperature on the NDTT(nil-ductility transistion temperature)-concern components. Around 0500.on 11/21, the purge was secured based on temperature. -1430, a new permit to purge was approved. -1540 the purge was in service (2 exhaust/1 supply fan). -1600, airborne alarms are received. The supply fans are shutdown and the exhaust fans are running fully following the alarming conditions.
During a discussion with the mechanical design supervisor, it was expressed to me that more attention should have have been given to the concerns in the AR mentioned above. The Root Cause Team was made aware of the AR. Following the airborne alarms the following actions were taken to reduce an airborne release: the canvas was put down on the equipment hatch, the canvas on the contruction hole was pulled down, and actions were taken to remove the personnel monorail system in the personnel hatch.
NOTE: THIS