ML100750095
| ML100750095 | |
| Person / Time | |
|---|---|
| Site: | Monticello, Prairie Island |
| Issue date: | 03/15/2010 |
| From: | Salamon G Northern States Power Co, Xcel Energy |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-XE-10-003 | |
| Download: ML100750095 (9) | |
Text
/@ Xcel EnergyB March 15, 2010 414 Nicollet Mall - MP4 Minneapolis, MN 55401 L-XE-10-003 10 CFR 140.21 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Prairie Island Nuclear Generating Plant, Monticello Nuclear Generating Plant Units 1 and 2 Docket 50-263 Dockets 50-282, 50-306 Renewed License No. DPR-22 License Nos. DPR-42 and DPR-60 Guarantee of Payment of Deferred Premiums
References:
- 1) Memo from NRC (Leah P. Tremper), dated November 15,2006
- 2) Federal Register Notice 72 FR 59574, Withdrawal of Regulatory Guide, dated October 22, 2007 Please find enclosed the Northern States Power Company, a Minnesota Corporation (NSPM), submittal of the 201 0 Annual proof of licensee guarantees of payment of deferred premiums in accordance with 1 OCFR140.21 (a) for the following:
Company, a Minnesota company Company, a Minnesota company Company, a Minnesota company I Plant 1 SFP I Endorsement # - Purpose Endorsement 43-AN1 Bond for Payment Monticello Certificate #
N - 0017 Prairie Island 46 - 2009 Annual Premium I
Unit N - 0036 Endorsement 43 - AN1 Bond for Payment Prairie Island Reference 1 states that the NRC will remove the annual cash flow statement requirement and accept the American Nuclear Insurers Bond for payment of retrospective premiums as proof of ability to pay deferred premiums in an amount of $17.5 million for each reactor licensed to operate.
of Retrospective premiums 46 - 2009 Annual Premium Unit 2 N - 0037 Endorsement 43 - AN1 Bond for Payment of Retrospective Premiums of Retrospective premiums 46 - 2009 Annual Premium
Document Control Desk Page 2 Reference 2 states, "The method described in Regulatory Guide 9.4 unnecessarily duplicates other financial and insurance verification documents submitted by the licensees to demonstrate compliance with other sections of 10 CFR Part 140. Rather than submit separate cash flow and financial assurance statements, licensees may submit proof of sufficient insurance bonding through American Nuclear Insurers or similar insurance groups. This insurance bond meets the requirements of 10 CFR 140.21 (a) and eliminates the need for a separate cash flow statement."
NSPM has elected to satisfy the 10CFR140.21 annual filing requirement under subsection (a)
Surety Bond vice subsection (e) Annual certified financial statement.
While NSPM is not officially submitting the (e) Annual certified financial statement, NSPM has these documents prepared in the event that the NRC requires them at a future date.
Summaw of Commitments This letter contains no new commitments and no revisions to existing commitments.
Gabor Salamon Director, Nuclear Licensing and Emergency Preparedness Northern States Power Company - Minnesota Enclosure cc:
Administrator, Region Ill, USNRC Project Managers, Prairie Island and Monticello, USNRC Resident Inspectors, Prairie Island and Monticello, USNRC Minnesota ~epartment of Commerce Marsh USA Inc. (Shannon Moyer)
AN1 (Gary Uricchio)
ENCLOSURE Guarantee of Payment of Deferred Premiums 6 Pages Follow
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSQCIATIQN ANNUAL PREMIUM ENDORSEMENT CALENDAR YEAR 20 10 1, ANNUAL PREMIUM: It is agreed that the Annual Premium due the companies for the period designated above is: $9,492.00 Effective Date of this Endorsement:
January 1,2010 (12:Ol A.M. Standard Time)
Issued To: Northern States Power Company Date of Issue:
November 13,2009 Endorsement No:
46 To form a part of Certificate No. N -0017 For the subscribing companies BY President Countersigned by
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION ENDORSEMENT TO CERTIFICATE NO. N -0017 Forming Part of Master Policy No. 1 Nuclear Energy Liability Insurance (Secondary Financial Protection)
It is agreed that effective October 29, 2008, Item 7. of the certificate is amended to read as follows:
Item 7.
Maximum retrospective premium (exclusive of allowance for premium taxes) payable pursuant to Condition 2 of the Mastex. Policy with respect to each nuclear incident: $1 17,495,000, Effective Date of this Endorsement:
October 29,2008 (12:Ol A.M. Standard Time)
Issued to:
Northern States Power Company Date of Issue:
October 29,2008 Endorsement No.:
NE-S-28 To form a part of Certificate No, N 4017 For the subscribing corn f, \\ nies By t).
Iw/L*I President Countersigned by
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LlABlLITY INSURANCE ASSOCiATlON ANNUAL P R E W M ENDORSEMENT CALENDAR YEAR 20 10 1, ANNUAL PREMIUM: It is agreed that the Annual Premium due the companies for the period designated above is: $9,492.00 Effective Date of this Endorsement:
January 1,2010
( 1 2:0 1 A.M. Standard Tirne) issued To: Northern States Power Company Date of Issue; November 13,2009 To form a part of Certificate No. N -0036 For the subscribina companies Endorsement No:
46 Countersigned by
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION ENDORSEMENT TO CERTIFICATE NO, N -0036 Fortning Part of Master Policy No. 1 Nuclear Energy Liability Insurance (Sec~nda~y Financial Protection)
It is agreed that effective October 29, 2008, Item 7. of the certificate is ame~lded to read as follows:
Item 7.
Maximum retrospective premitrm (exclusive of allowance for premium taxes) payable pursuant to Condition 2 of the Master Policy with respect to each nuclear incident: $1 17,495,000.
Effective Date of this Endorsement:
October 29,2008 (1 2:01 A.M. Standard Time)
To form a part of Certificate No. N -0036 Issued to:
Northern States Power Company Date of Issue:
October 29,2008 Endorsement No.:
NE-S-28 F
B Countersigned by
NUCLEAR ENERGY LIAFSlLifY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSQCIATIQN ANNUAL PREMIUM ENDORSEMENT CALENDAR YEAR 2010
- 1. ANNUAL PREMIUM:
It is agreed that the Annual Premium due the colnpanies for the period designated above is: $9,492.00 Effective Date of this Endorsement:
January 1,2010 (12:01 A.M. Standard Tiwe)
Issued To: Northern States Power Company Date of Issue:
November 13,2009 Endorsement No:
46 To form a part of Certificate No. N -0037 For the subscribing companies E ~ Y 0
, b, / w J President Countersigned by
NUCLEAR ENERGY LIABlLlTY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION ENDORSEMENT TO CERTIFICATE NO, N -0037 Forming Part of Master Policy No. 1.
Nuclear Energy Liability Insurance (Secondary Financial Protection)
It is agreed that effective October 29, 2008, Item 7. of the certificate is amended to read as follows:
Item 7, Maximum retrospective premium (exclusive of allowance for pse1.nium taxes) payable pursuant to Condition 2 of the Master Policy with respect to each nuclear incident: $1 17,495,000.
Effective Date of this Endorsement:
October 29,2008 (12:Ol A.M. Standard Time)
Issued to:
Northern States Power Company Date of Issue:
October 29,2008 Endorsement No.:
43 NE-S-28 To form a part of Certificate No. N -0037 For the subscribing co f ) \\
B Countersigned by