UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 March 10, 2010 Mr. Timothy J. OConnor Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT REQUEST FOR INFORMATION FOR AN NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL

Dear Mr. OConnor:

On June 28, 2010, the NRC will begin a Post-Approval Site Inspection For License Renewal.

A team of five inspectors will perform a 3-week Phase 2 inspection in accordance with NRC Inspection Procedure (IP) 71003. This inspection will include two weeks on-site, the week of June 28, 2010 and the week of July 12, 2010.

This inspection will focus on verifying that license conditions added as part of the renewed license, license renewal commitments, and selected aging management programs are implemented in accordance with Title 10 of the Code of Federal Regulations (CFR) Part 54, Requirements for the Renewal of Operating Licenses for Nuclear Power Plants.

In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for information needed for the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection. Insofar as possible, this information should be provided electronically to the lead inspector. The information request has been divided into two groups:

  • The first group lists information necessary for our initial inspection scoping and in-office preparation activities. During the in-office preparation activities, the team will identify as much as possible the information and activities to be reviewed during the inspection. This information should be provided to the lead inspector by June 11, 2010.
  • The second group includes the additional information required for the team to review the selected activities. This information should be available to the team onsite June 28, 2010. It is also requested that corrective action documents and/or questions developed during the inspection be provided to the lead inspector as the documents are generated.

The lead inspector for this inspection is Mrs. Caroline Tilton. We understand that our Regulatory Affairs contact for this inspection is Mr. Ron Baumer of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact Dr. Stuart Sheldon at (630) 829-9727 or via e-mail at Stuart.Sheldon@nrc.gov.

T. OConnor This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Jamie Benjamin, Acting Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-263 License No. DPR-22

Enclosure:

Request for Information, Post-Approval Site Inspection for License Renewal cc w/encl: Distribution via ListServ

REQUEST FOR INFORMATION POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL Inspection Report: 05000263/2010008 (DRS)

Inspection Dates: June 28, 2010 - July 16, 2010 Inspection Procedure: IP 71003 Post-Approval Site Inspection for License Renewal Lead Inspector: Caroline Tilton, Lead Inspector (630) 829-9718 Caroline.Tilton@nrc.gov I. Information Requested Prior to the On-site Inspection Week The following information is requested by June 11, 2010, or sooner, to facilitate inspection preparation. If you have any questions regarding this information, please call Dr. Sheldon as soon as possible. (Please provide the information electronically in pdf files, Excel, or other searchable formats, preferably on some portable electronic media (e.g. CDROM, DVD, flash drive, etc.). The portable electronic media should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information in lists should contain enough information to be easily understood by someone who has knowledge of light water reactor technology).

1. Provide a list of your license renewal commitments with the completion status of each. If a commitment is not complete, please provide an anticipated completion date.
2. For each complete commitment, please provide documentation demonstrating that the commitment has been completed.
3. For any commitment that has been changed, please provide documentation of the commitment change process, and any associated justification.
4. Provide a list of your Aging Management Programs (AMPs), copies of the program basis documents for each, and a listing of the action tracking items for each.
5. For AMPS that are one-time inspection programs, provide a list of completed work order numbers for inspections that have been completed. This may be incorporated with the previous item.
6. Provide a list of any newly identified structures, systems and components (SSCs) pursuant to 10 CFR 54.37(b) and RIS-2007-16.

1 Enclosure

REQUEST FOR INFORMATION POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL

7. Provide a copy of your updated final safety analysis report (UFSAR), or UFSAR update which includes descriptions of your AMPs.
8. Provide copies of any internal/external self-assessments and associated corrective action documents generated in preparation for the inspection.

II. Information requested to be available when the inspectors arrive on-site on June 28, 2010 and during the inspection.

1. Documentation demonstrating completion of license renewal commitments that are complete as of the inspection date. For example, this may be in the form of a binder for each commitment which includes the implementing documentation and references.
2. Copies of any corrective action documents generated as a result of the teams questions or queries during this inspection. (Provide daily during the inspection to the team lead and each team member).
3. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member).

If you have questions regarding the information requested, please contact the Dr. Sheldon. It may also help to review the IP 71003 frequently asked questions which are available at:

http://www.nrc.gov/reactors/operating/licensing/renewal/introduction/inspections/faq-ip71003.html 2 Enclosure

T. OConnor This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Jamie Benjamin, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-263 License No. DPR-22

Enclosure:

Request for Information, Post-Approval Site Inspection For License Renewal cc w/encl: Distribution via ListServ DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-1 Resource RidsNrrPMMonticello RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource DOCUMENT NAME: G:\DRS\WIP\Ltr 03___10 Monticello License Renewal 71003b RFI SNS.doc 9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy OFFICE RIII RIII NAME SSheldon:ls JBenjamin DATE 03/10/10 03/10/10 OFFICIAL RECORD COPY