ML100690084
| ML100690084 | |
| Person / Time | |
|---|---|
| Issue date: | 03/10/2010 |
| From: | Annette Vietti-Cook NRC/SECY |
| To: | Pietrangelo A Nuclear Energy Institute |
| References | |
| Download: ML100690084 (2) | |
Text
March 10, 2010 Anthony R. Pietrangelo Senior Vice President and Chief Nuclear Officer Nuclear Energy Institute 1776 I Street NW, Suite 400, Washington, D.C. 20006-3708
Dear Mr. Pietrangelo:
The Nuclear Regulatory Commission (NRC) is pleased that the Nuclear Energy Institute (NEI) will participate in a public Commission meeting on the fuel cycle oversight process revisions, Thursday, April 29, 2010, at 9:30 a.m. Please let me know who will represent NEI at this meeting. The meeting will be held in the Commissioners Conference Room on the first floor of the NRCs Headquarters building at One White Flint North, Rockville, Maryland. The Commission is interested in hearing NEIs views on the revisions to the fuel cycle oversight process. I am enclosing a copy of the draft meeting agenda for your information (enclosure 1).
My staff will keep you informed of any updates to the agenda.
To assist the Commission in preparing for the meeting, please e-mail any written material, including viewgraphs/slides, to Ms. Rochelle Bavol and Ms. Sandy Joosten (rochelle.bavol@nrc.gov and sandy.joosten@nrc.gov) in the Office of the Secretary, by April 22, 2010, so that it can be distributed to the Commission for review in advance of the meeting. Enclosed are guidelines for viewgraphs, if you choose to use them (enclosure 2).
PowerPoint or other electronic presentation formats are acceptable. This Commission meeting will be webcast live at the Web address: www.nrc.gov. If you intend to use viewgraphs they will also be posted on the NRC website prior to the meeting. If you have any questions, please contact Ms. Bavol at 301-415-1651.
NEIs presentation at the Commission meeting should be based on the assumption that Commissioners are familiar with the content of your written material. Please plan your oral presentation for 5 minutes, discussing the important points on which you wish to focus the Commissions attention.
Reserved visitor parking for Commission guests is available. If you wish to use reserved parking, please notify Ms. Bavol in advance. If reserved parking has been arranged, please check-in with the security staff at the entrance to the NRC campus on Marinelli Drive when you arrive. A Security Guard will call for an escort. Please note that visitors will be screened through metal detectors, will have their packages x-rayed, and will be required to present a picture identification card prior to signing in at the registration desk.
2 Sincerely,
/RA/
Annette L. Vietti-Cook Secretary of the Commission
Enclosures:
- 1. Draft Agenda
- 2. Briefing Visuals Guidance