ML100670651
| ML100670651 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 08/07/2009 |
| From: | Brian Larson Operations Branch IV |
| To: | Entergy Operations |
| References | |
| Download: ML100670651 (2) | |
Text
Attachment 6 OBDI 202 - IOLE Process DRAFT OUTLINE COMMENTS Facility:
AN2 First Exam Date:
8/7/09 Written Exam Outline (5/28/2009)
Comment Resolution 1 Revision number on all forms Fixed 2
Consider adding K/As replaced due to non-applicability to AN2 or unable to write question to next exam's suppressed list Will do.
3 Administrative JPM Outline (5/28/2009)
Comment Resolution 1 Renumber A1 - A9 Done 2 A2 - ensure RO's not making TS calls Revised task to reflect RO duties 3 Revision number on all forms Fixed 4 Rad Control JPM must be different for RO and SRO. Revise or replace one.
Replaced SRO JPM 5 RO surveillance JPM - is this an RO task?
Yes Control Room / In-Plant System JPM Outline (5/28/2009)
Comment Resolution 1
Were JPMs used on previous NRC exams randomly selected from last two exams?
No. Since 3 applicants took the 2006 NRC exam, we recommended, and the Chief Examiner agreed, to randomly select JPMs from only the 2008 exam.
2 Renumber S1, S2. P1, P2 Done 3
For RCP shutdown JPM - ensure clearly defined Task Standard and is this Low Power/Shutdown?
Will do and yes - form updated
OBDI 202 - IOLE Process Simulator Scenario Outline Comments (5/28/2009)
Comment Resolution 1 Scen 1, Event 6 - on last two NRC exams - replace Replaced with Main Turb trip 2 Scen 1, Event 9 - on last two NRC exams - replace Replaced with SI pump shaft shear 3 Scen 2, Event 5 - this is a precursor to event 6, not a stand alone event Events 5 & 6 combined 4
Scen 2 - Turnover - draining containment sump should be worded as directive, not a vague request Fixed 5 Scen 3, Event 4 - make failure of channel a ramp, not instant failure Done (30 sec)