ML100640014
| ML100640014 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 03/05/2010 |
| From: | Hansell S Operations Branch I |
| To: | Peter Dietrich Entergy Nuclear Northeast |
| Shared Package | |
| ML100560231 | List: |
| References | |
| Download: ML100640014 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 March 5~ 2010 Mr. Pete Dietrich Site Vice President Entergy Nuclear Northeast James A Fitzpatrick Nuclear Power Plant Post Office Box 11 0 Lycoming, NY 13093 SUB~IECT:
REQUALIFICATION PROGRAM INSPECTION - JAMES A FITZPATRICK NUCLEAR POWER STATION
Dear Mr. Dietrich:
In a telephone conversation on February 18, 2010, Mr. Todd Fish, Lead Inspector, and Mr. Jim Burton, Superintendant, Operations Training - Requalification, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Fitzpatrick facility. The inspection is planned for the week of April 26, 2010, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with 10 CFR 55.59( c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations (previously administered in 2009) and operatinu tests scheduled for the week of the inspection to the NRC by April 19, 2010. Mr. Burton has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 31 :50-0018.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIAlPrivacy Services Branch (T-5 F52),
U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.
P. Dietrich 2
The NRC may not conduct or sponsor, and a person is not required to respond to,'a collection of information unless it displays a currently valid OMS control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice,>> a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html{The Public Electronic Reading Room}.
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Todd Fish at (610) 337-5369.
Sincerely,
£J:;:;>'
~.~,
~mUei L. Hanse,Jr., Chief Operations Branch Division of Reactor Safety Docket No.
50-333 License No.
DPR-59 cc: Distribution via ListServ
P. Dietrich 2
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless It displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component: of the NRC's document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rrn/adams;html (The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Todd Fish at (610) 337-5369.
Sincerely.
IR'AI Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No.
50-333 License No.
DPR-59 cc: Distribution via ListServ Distribution w/encl: (VIA E-MAIL)
S. Collins, RA (R10RAMAIL RESOURCE)
M. Dapas, ORA (R10RAMAIL RESOURCE)
D. Lew, DRP (R1 DRPMAIL RESOURCE)
J.. Clifford, DRP >(R1DRPMAIL RESOURCE)
D. Roberts, DRS (R1DRSMail Resource)
P. Wilson, DRS (R1DRSMaii Resource)
L. Trocine, Rl OEDO M. Gray, DRP B. Bickett, DRP S. McCarver, DRP G. Hunegs, DRP, SRI S. Ibarrola, DRP, RI K. Kolek, Resident OA RidsNrrPMFitzPatrick Resource RidsNrrDorlLpl1-1 Resource ROPreports Resource@nrc.gov cc: CBixler (Facility File)
SUNSI Review Complete: _SLH_ (Reviewer'S Initials)
ADAMS PKG:ML100560231 ADAMS ACC: ML100640014 DOCUMENT NAME: G:\\ORS\\Operalions Branch\\FISH\\Requal FY1 O*Fitz Apr1 O\\6QdayrpiRev1.doc After dec/aring this document "An OffIcial Agency Record" it will be released to the Public.
To receive a copy of this document. indicat~CU =
attachment/enclosure nEn=Copy with attachment/enclosure "N" - No copy OFFICE RI/DRS/OB RIIDRS/OB. I RI/DRS/OB I
I I
NAME CJBixlerl THFishl SLHansell1 DATE 3/4/10 3/4/10 3/4/10 OFFICIAL RECORD COpy