Response to T. Gurdziel Letter Regarding Entry for Indian Point Siren System, Dated March 3, 2010
ML100630232
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/03/2010
From: James Trapp
Plant Support Branch 1
To: Tom Gurdziel
- No Known Affiliation
Trapp J
References
G20100014
Download: ML100630232 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 March 3, 2010 Mr. Thomas Gurdziel 9 Twin Orchard Drive Oswego, NY 13126

Dear Mr. Gurdziel:

This letter is our response to your letter dated January 7, 2010, addressed to Mr. Bill Borchardt, the Nuclear Regulatory Commission (NRC) Executive Director of Operations. In your letter, which you stated was a "2.206 letter, It you questioned the validity of NRC Inspection Report documentation regarding a 2006 test of the Indian Point Energy Center (IPEC) siren system and expressed a concern regarding corrective actions taken for "local radio frequency interference."

As discussed in the NRC's letter to you dated February 16, 2010, the NRC Petition Review Board determined that your January 7, 2010, letter did not meet the criteria for consideration under 10 CFR 2.206. In our letter, we stated that Region I would respond to the concerns stated in your January rn letter regarding IPEC alert and notification system (ANS) siren tests.

We have reviewed our inspection results of the March 2006 ANS tests and have concluded the inspection was properly conducted and reported. The test results documented in Inspection Report 05000286/2006002 were for tests of the previous Matrikon ANS, which was replaced as the primary ANS for IPEC in August 2008. The March 8, 2006, test was observed by the Region I Senior Emergency Preparedness Specialist. During the test, the siren feedback system computer server stopped operating, preventing confirmation that all individual sirens operated properly during the test. After 138 sirens reported successful activation, the siren system response was suspect of errors, and Entergy declared the ANS inoperable and out-of service. Entergy Initially believed that the results of the siren test were not valid due to this problem. Subsequently, Entergy identified a problem with the feedback system hard drive and database compiler, and concluded that the initial 138 siren test results had been accurately compiled by the siren feedback system computer prior to the computer problem, and the initial test results were in fact valid. During follow-up inspection, the inspector determined that Entergy had properly calculated the March 8, 2006, test results. The inspector verified that the successful operation of 138 out of 156 sirens was the proper number for Entergy to report to the NRC as ~art of the performance indicator (PI) process. The inspector also verified that the March 8 test problems were placed in the licensee's corrective action process and. that adequate steps were taken to repair the existing ANS. The March 15, 2006, siren test documented In the same inspection report was conducted to confirm the adequacy of those corrective actions. The results of the March 15th test were not included 'as PI data, as that test was not scheduled and designated ahead of time as a PI test.

'. Your letter also mentioned a concern with our description of "local radio frequency interference" as a cause of the problems with the IPEC ANS. The replacement ANS at IPEC was designed to overcome radio frequency interference problems. This system uses four transmission towers to better communicate with each other and the siren pole locations, and the system uses a cell

T. Gurdziel 2

phone-Internet protocol to activate the sirens separately from the radio activation system.

Entergy has identified the root cause of the problems seen in the December 2009 full-volume test and determined the cause did not involve local radio frequency interference. Entergy has taken corrective actions for that failure, and Region I has an inspection scheduled to evaluate that root cause determination and the adequacy of Entergy's corrective actions.

Thank you for your active interest in our activities to protect the public health and safety. If you have any further questions concerning this matter, please contact either me (phone: 610-337 5186; email: james.tragg@nrc.gov) or the Region I Senior Emergency Preparedness SpeCialist, Steve Barr (phone: 610-337-5316; email: steve.barr@nrc.gov).

Sincerely, James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-247 and 50-286 cc: Distribution via ListServ

T. Gurdziel 2

phone-Internet protocol to activate the sirens separately from the radio activation system.

Entergy has identified the root cause of the problems seen in the December 2009 full-volume test and determined the cause did not involve local radio frequency interference. Entergy has taken corrective actions for thaUailure, and Region J has an inspection scheduled to evaluate that root cause determination and the adequacy of Entergy's corrective actions.

Thank you for your active interest in our activities to protect the public health and safety. If you have any further questions concerning this matter, please contact either me (phone: 610-337 5186; email: james.trapp@nrc.gov) or the Region I Senior Emergency Preparedness Specialist, Steve Barr (phone: 610-337-5316; email: steve.barr@nrc.gov).

Sincerely, IRAJ James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-247 and 50-286 cc: Distribution via ListServ DISTRIBUTION: (G20100014 EDATS: OEDO-2010-0010 EDATS: OEDO-2010-0137)

Public LPL1-1 RlF RidsNrrOd Resource RidsNrrDorlLpl1-1 Resource RidsNrrPMlndianPoint Resource RidsNrrPMNineMilePoint Resource RidsNrrAdes Resource RidsNrrLASLittle Resource RidsNrrAdro Resource RidsNrrDoriDpr Resource RidsOgcRp Resource RidsNrrDorl Resource RidsOGCMailCenter Resource RidsNrrMailCenter Resource RidsRgn1MailCenter Resource RidsAcrsAcnw&mMailCenter Resource RidsEDOMailcenter Resource RidsOeMailCenter Resource RidsOpaMaii Resource L. Trocine, CEDO T. Quay, NRR T. Mensah, NRR J. Trapp, RI R. Kahler, NSIR RidsOiMailCenter Resource SUNSI Review Complete: -.:----L:im.:.:t.:..*_-:--_-::--:-:-:.

DOCUMENT NAME: g:\\drs\\plant support branch 1\\BARR\\GurdzieIIPEC ANS GT ftr revision 1.doc After declaring this document "An Official Agency Record" It will be released to the Public.

To receive a copy of this document, Indicate In the box: *c* =Copy without attachment/enclosure "E" =Copy with attachment/enclosure "N" =: No copy P kage: ML 10063 189 I

ML100120278/ML00420040 e er: ML100630232 ac 0

ncomlng:

L tt OFFICE RGN1/DRS NRRlLPL 1"1/PM*. NSIRlDRP/EP*

RGN1/DRP RGN1/DRS NAME SBarr/stb* **

RGuzman/stb*

"f'\\ahlerlstb* **

MGray/mxg*

JTrapp**

DATE 02/23/2010 02/23/2010 03/01/2010 02/24/2010 03/03/2010

  • Concurrence via e-mail OFFICIAL RECORD COpy **See pnor concurrence