LTR-10-0081 - E-mail, Susan Devine, Regarding NRC Licensing Renewal
ML100610643
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/27/2010
From: Devine S
San Luis Obispo County, CA
To: Collins E
NRC Region 4, NRC/SECY
Craver P
References
LTR-10-0081
Download: ML100610643 (5)


Text

OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Mar 01, 2010 13:48 PAPER NUMBER: LTR-10-0081 LOGGING DATE: 03/01/2010 ACTION OFFICE: EDO

-To-DEDMRT SDEWR AUTHOR: Susan Devine DEDGM AFFILIATION: AO ADDRESSEE: NRC ExeSec Resource 0Vi

SUBJECT:

NRC licensing renewal ACTION: Information DISTRIBUTION: RF LETTER DATE: 02/27/2010 ACKNOWLEDGED No SPECIAL HANDLING:

NOTES: This letter is being provide to the San Luis Obispo County Board of Supervisors on 3/9/2010...It has not been sent FILE LOCATION: ADAMS DATE DUE: DATE SIGNED:

Th~'~v~oik: %/§(+/-O}1

Champ, Billie From: sdevine@co.slo.ca.us Sent: Saturday, February 27, 2010 3:03 PM To: NRCExecSec Resource; Collins, Elmo; greg.haas@mail.house.gov; Greg; Greg; Kathy_Dedrick@epw.senate.gov; Jennifer Tang@boxer.senate.gove; HillaryBishop@boxer.senate.gov; Christine Robertson; Bbyron@energy.state.ca. us

Subject:

NRCLicensingRenewal - Revised Letter Attachments: NRCLicensingRenewal2.Feb20l0.doc

All, Please see the attached slightly revisedletter which is to be presented to the San Luis Obispo County Board of Supervisors at their meeting March 9, 2010. Thank you very much.

Susan Devine Legislative Assistant Supervisor Adam Hill, District 3 (805)781-4336

[Scanned @co.slo.ca.us]

1

Received: from maill.nrc.gov (148.184.176.41) by TWMSO1.nrc.gov (148.184.200.145) with Microsoft SMTP Server id 8.1.393.1; Sat, 27 Feb 2010 15:03:11 -0500 X-Ironport-ID: mail1 X-SBRS: 5.3 X-MID: 11874251 X-fn: NRCLicensingRenewal2.Feb2010.doc X-lronPort-Anti-Spam-Filtered: true X-IronPort-Anti-Spam-Result:

AIMCAH8JiUvMWPzbmWdsb2JhbACbHBUBAQEBAQgLCgcTIqwNCYOigmqCEQSDFw X-lronPort-AV: E=Sophos;i="4.49,551,1262581200";

d="doc'32?scan'32,208,32"; a="1 1874251" Received: from ironport0l.co.slo.ca.us ([204.88.252.219]) by maill.nrc.gov with ESMTP; 27 Feb 2010 15:03:10 -0500 Received: from Ifa.co.slo.ca.us ([10.1.64.220]) by ironport01 .co.slo.ca.us with ESMTP; 27 Feb 2010 11:55:43 -0800 Return-Path: <sdevine@co.slo.ca. us>

Received: from ironport0l.co.slo.ca.us ([10.1.64.219]) by Ifa.co.slo.ca.us (PostX Enterprise 6.5.1.1 SMTP Adaptor) with SMTP ID 769; Sat, 27 Feb 2010 12:03:08 -0800 (PST)

X-ESA-Scanned: Yes Received: from Ifa.co.slo.ca.us ([10.1.64.220]) by ironport0l.co.slo.ca.us with ESMTP; 27 Feb 2010 11:55:43 -0800 Received: from seagull.wings.co.slo.ca.us ([10.2.51.4]) by Ifa.co.slo.ca.us (PostX Enterprise 6.5.1.1 SMTP Adaptor) with SMTP ID 263; Sat, 27 Feb 2010 12:03:08 -0800 (PST)

To: NRCExecSec@nrc.gov, elmo.Collins@nrc.gov, greg.haas@mail.house.gov, Greg <greg.haas@mail.house.gov>,

Greg <greg.haas@mail.house.gov>,

KathyDedrick@epw.senate.gov, JenniferTang@boxer.senate.gove, HillaryBishop@boxer.senate.gov, Christine Robertson <c.e.robertson@sbcglobal.net>,

Bbyron@energy.state.ca.us MIME-Version: 1.0

Subject:

NRCLicensingRenewal - Revised Letter X-KeepSent: B67AA8BA:D528AB16-882576D7:006D763D; type=4; name=$KeepSent X-Mailer: Lotus Notes Release 8.0.2 FP1 December 23, 2008 Message-ID: < 1229025.3773.1267300988779. Java Mail. root@ieaO 1.co. slo. ca. us>

From: <sdevine@co.slo.ca.us>

Date: Sat, 27 Feb 2010 12:03:03 -0800 X-MIMETrack: Serialize by Router on Seagull/CountyofSLO(Release 8.0.2FP11 January 12, 2009) at 02/27/2010 12:03:16 PM Content-Type: multipart/mixed; boundary="=_mixed 006E251 C882576D7="

X-IEA-Scanned: Yes X-PostX-Message-ID: 632a70fe0c7806117f000001 1 b09af1 7@iea01 .co.slo.ca.us

March 9, 2010 Gregory B. Jaczko, Chairman c/o Annette I. Vietti-Cook, Secretary of the Commission U.S. Nuclear Regulatory Commission Mail Stop O-16G4 Washington, DC 20555-0001 RE: Relicensing application for Diablo Canyon Nuclear Power Plant

Dear Chairman Jaczko:

The San Luis Obispo County Board of Supervisors represents the residents who live within the Emergency Planning Zone of the Diablo Canyon Nuclear Power Plant. As such, we respectfully request that the NRC wait to begin processing the relicensing application filed in November 2009, until the seismic studies for the plant have been completed.

Our county has significant interest in seeing that these studies -- as would have been mandated by a bill authored by our local State Assemblyman Sam Blakeslee

-- be completed so as to best ensure the safety concerns of our citizens.

Recently, the California Public Utilities Commission determined those studies be completed before any further taxpayer or ratepayer monies be invested in the relicensing process.

Thus, we make this request out of common sense, without any prejudice toward the power plant, which we recognize is of both local and statewide importance.

The application for relicensing was filed exactly one year after PG&E announced that an earthquake fault had been discovered 1800 feet offshore of the Diablo Canyon Nuclear Power Plant. Since then, it has been recommended that further seismic studies be conducted to include three-dimensional geophysical mapping and other advanced techniques to explore fault zones near the power plant.

March 9, 2010 Gregory B. Jaczko, Chairman Page 2 We are encouraged by the support shown for these expedited studies by our state's regulators and state legislature. We have also been encouraged by PG&E's willingness to complete these studies.

Thus, once again, in the interests of efficiency and openness, we respectfully ask that you allow these studies to be completed before public money is used to process the relicensing application for Diablo Canyon Nuclear Power Plant. If a delay cannot be granted, then secondarily we would ask that the application process not be completed until the seismic studies have been completed.

Sincerely, Frank Mecham Chair, Board of Supervisors cc: Assemblyman Sam Blakeslee State Senator Abel Maldonado U.S. Congresswoman Lois Capps