UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE ROAD, SUITE 210
LISLE, IL 60532-4352
February 22, 2010
Mr. Barry Allen
Site Vice President
FirstEnergy Nuclear Operating Company
Davis-Besse Nuclear Power Station
5501 North State Route 2, Mail Stop A-DB-3080
Oak Harbor, OH 43449-9760
SUBJECT:
ACKNOWLEDGMENT OF DISPUTED VIOLATION - DAVIS-BESSE NUCLEAR
POWER STATION NRC INSPECTION REPORT 05000346/2009503(DRS)
Dear Mr. Allen:
This letter acknowledges your letter to the U. S. Nuclear Regulatory Commission (NRC) dated
January 27, 2010, which provided a response to our inspection report issued on
December 28, 2009, concerning activities conducted at your Davis-Besse Nuclear Power
Station facility. The letter contested one of the Non-Cited Violations (NCVs) contained in the
inspection report, namely NCV 05000346/2009503-02, associated with the Inadequate
Procedures for State and Local Notifications.
We are currently reviewing your basis for contesting the NCV. The NRC seeks to be thorough
and timely in the review of licensee responses to NCVs. Accordingly, we will inform you as
soon as we complete our evaluation.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records System (PARS) component of NRC's Agencywide Documents
Access and Management System (ADAMS), accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Hironori Peterson, Chief
Operations Branch
Division of Reactor Safety
Docket No. 50-346
License No. NPF-3
cc:
Distribution via ListServ
Mr. Barry Allen
Site Vice President
FirstEnergy Nuclear Operating Company
Davis-Besse Nuclear Power Station
5501 North State Route 2, Mail Stop A-DB-3080
Oak Harbor, OH 43449-9760
SUBJECT:
ACKNOWLEDGMENT OF DISPUTED VIOLATION - DAVIS-BESSE NUCLEAR
POWER STATION NRC INSPECTION REPORT 05000346/2009503(DRS)
Dear Mr. Allen:
This letter acknowledges your letter to the U. S. Nuclear Regulatory Commission (NRC) dated
January 27, 2010, which provided a response to our inspection report issued on
December 28, 2009, concerning activities conducted at your Davis-Besse Nuclear Power
Station facility. The letter contested one of the Non-Cited Violations (NCVs) contained in the
inspection report, namely NCV 05000346/2009503-02, associated with the Inadequate
Procedures for State and Local Notifications.
We are currently reviewing your basis for contesting the NCV. The NRC seeks to be thorough
and timely in the review of licensee responses to NCVs. Accordingly, we will inform you as
soon as we complete our evaluation.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records System (PARS) component of NRC's Agencywide Documents
Access and Management System (ADAMS), accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Hironori Peterson, Chief
Operations Branch
Division of Reactor Safety
Docket No. 50-346
License No. NPF-3
cc:
Distribution via ListServ
DISTRIBUTION:
See next page
DOCUMENT NAME: R:\\Ltrs to licensees\\FirstEnergy (FENOC) - Davi-Perr\\DAVI\\DAVI 2010\\DAV 022210 DRS OL Re Contested
Ack Ltr.doc
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE
RIII
RIII
RIII
RIII
NAME
MGarza:jb/co AMStone
SOrth
HPeterson
DATE
02/22/10
02/19/10
02/22/10
02/22/10
OFFICIAL RECORD COPY
Letter to Mr. Barry Allen from Mr. Hironori Peterson dated February 22, 2010.
SUBJECT:
ACKNOWLEDGMENT OF DISPUTED VIOLATION - DAVIS-BESSE NUCLEAR POWER
STATION NRC INSPECTION REPORT 05000346/2009503(DRS)
DISTRIBUTION:
RidsNrrDorlLpl3-2 Resource
Susan Bagley
RidsNrrPMDavisBesse Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII
DRSIII
Patricia Buckley
OEMAIL Resource