EN-10-007, Davis-Besse Nuclear Power Station, Firstenergy Nuclear Operation Company
ML100540218
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/22/2010
From: Gerald Gulla
NRC/OE
To:
FirstEnergy Nuclear Operating Co
References
EA-09-283 EN-10-007
Download: ML100540218 (2)


Text

February 22, 2010 EN 10-007 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: FirstEnergy Nuclear Operating Company EA-09-283 Davis-Besse Nuclear Power Station Docket No. 50-346

Subject:

ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a White Significance Determination Process finding will be issued on or about February 25, 2010, to FirstEnergy Nuclear Operating Company as a result of an inspection at the Davis-Besse Nuclear Power Station. This White finding, an issue with low to moderate safety significance, which may require additional NRC inspections, involved the licensees failure to implement the emergency classification and action level scheme during an actual event for an explosion in the switchyard. Specifically, immediately following an electrical fault and catastrophic failure of a voltage transformer in the switchyard resulting in an explosion, fire, and damage to several switchyard components which affected plant operations, the licensee failed to recognize that the hazard to station operations met the emergency action level conditions for declaring an Alert. Several hours later, during a shift turnover, it was recognized that the Alert threshold had been breached and subsequently an Alert was declared. The licensee did not contest the characterization of the risk significance of this finding and declined the opportunity to discuss this issue in a Regulatory Conference.

A Notice of Violation is included based on a violation of 10 CFR 50.54(q) which requires, in part, that a holder of an operating license shall follow emergency plans which meet the standards in 10 CFR 50.47(b). 10 CFR 50.47(b) requires, in part, that the licensee have a standard emergency classification and action level scheme in use. The Davis-Besse Emergency Plan requires, in part, that the Shift Manager shall verify the indication of an off-normal event and classify the situation. Specifically, on June 25, 2009, the Shift Manager failed to verify the indications of an off-normal event (explosion), assess the information available from valid indications and classify the situation as an Alert in accordance with the Emergency Action Level Conditions during an actual event.

It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:

Mailing of Final Significance Determination February 25, 2010 Telephone Notification of Licensee February 25, 2010 The State of Ohio will be notified.

Contacts: Gerry Gulla, OE, (301) 415-2872 Nick Hilton, OE, (301) 415-3055

Distribution: EN-10-007, February 22, 2010 OWFN OWFN TWFN EBB Regional Offices Chairman Jaczko EDO OCFO NMSS RI RII Comm. Klein DEDR OP CENTER RIII RIV Comm. Svinicki DEDMRS FSME SECY OE OIG MAIL OCA OGC OCIO ADAMS PA NRR RES OE staff IP NSIR ACRS OI Electronic DISTRIBUTION:

R. Zimmerman, OE B. Sosa, OE N. Hilton, OE G. Gulla, OE OE r/f EN binder ML100540218 X PUBLIC X NON-SENSITIVE OFFICE OE:ES OE:BC NAME G. Gulla N. Hilton DATE 02/19/10 02/19/10 OFFICIAL RECORD COPY