February 16, 2010

Mr. Edward D. Halpin

President and

Chief Executive Officer

STP Nuclear Operating Company

South Texas Project

P.O. Box 289

Wadsworth, TX 77483

SUBJECT:

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION,

UNITS 1 AND 2 - NOTIFICATION OF NRC INITIAL OPERATOR

LICENSING EXAMINATION 05000498/2010301; 05000499/2010301

Dear Mr. Haplin:

In a meeting on February 9, 2010, at the Region IV office between Messrs. Jonathan Pierce,

Operations Training Manager, Ken Strubble, Supervisor Operations Training and Gabriel Apger,

Chief Examiner, arrangements were made for the administration of a retake written examination

for one Reactor Operator applicant at South Texas Project Electric Generating Station, Units 1

and 2, on May 27, 2010.

As agreed during the meeting, your staff will prepare the examination based on the guidelines in

NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9,

Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant

Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your staff any

changes that might be necessary before the examination is administered.

During the meeting, Mr. Strubble provided the outline for the written examination, the required

checklists and a cover letter that was signed by Mr. Pierce. To meet the above schedule, it will

be necessary for your staff to furnish the draft written examination and supporting reference

materials identified in Attachment 3 to ES-201 by April 12, 2010 and the final examination by

May 13, 2010. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations, an

authorized representative of the facility licensee shall approve the examination before it is

submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

R E GI ON I V

612 EAST LAMAR BLVD, SUITE 400

ARLINGTON, TEXAS 76011-4125

STP Nuclear Operating Company

- 2 -

In order to conduct the requested written examination, it will be necessary for your staff to

provide adequate space and accommodations in accordance with ES-402.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examination is being administered.

To permit timely NRC review and evaluation, your staff should submit the preliminary operator

application (Office of Management and Budget (OMB) approval number 3150-0090), medical

certifications (OMB approval number 3150-0024), and waiver requests (OMB approval number

3150-0090) at least 30 days before the examination date. If the application is not received at

least 30 days before the examination date, a postponement may be necessary. The signed

application certifying that all training has been completed should be submitted at least 14 days

before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on February 28, 2013. The public reporting burden

for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the

time for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the

electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-

rm/adams.html.

Thank you for your cooperation in this matter. Mr. Pierce has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRCs examination

procedures and guidelines, please contact Mr. Apger at 817-276-6508, or myself at 817-860-

8159.

Sincerely,

/RA/

Mark S. Haire, Chief

Operations Branch

Division of Reactor Safety

STP Nuclear Operating Company

- 3 -

Dockets: 50-498; 50-499

Licenses: NPF-76; NPF-80

DISTRIBUTION:

Kevin Richards, Senior Vice President and

Assistant to CEO

STP Nuclear Operating Company

South Texas Project

P. O. Box 289

Wadsworth, TX 77483

David W. Rencurrel, Senior Site Executive

Senior Vice President Units 1 and 2

STP Nuclear Operating Company

South Texas Project

P.O. Box 289

Wadsworth, TX 77483

Louis Peter, Plant General Manager

STP Nuclear Operating Company

South Texas Project

P.O. Box 289

Wadsworth, TX 77483

Tim Powell, Vice President, Engineering

STP Nuclear Operating Company

South Texas Project

P.O. Box 289

Wadsworth, TX 77483

A. W. Harrison, Manager, Licensing

STP Nuclear Operating Company

South Texas Project

P.O. Box 289

Wadsworth, TX 77483

Charles T. Bowman, General Manager, Oversight

STP Nuclear Operating Company

South Texas Project

P.O. Box 289

Wadsworth, TX 77483

Marilyn Kistler

Senior Staff Specialist, Licensing

STP Nuclear Operating Company

South Texas Project

P.O. Box 289

Wadsworth, TX 77483

STP Nuclear Operating Company

- 4 -

Cheryl Mele

City of Austin

Electric Utility Department

721 Barton Springs Road

Austin, TX 78704

J. J. Nesrsta/R. K. Temple/

Ed Alercon/Kevin Pollo

City Public Service

P.O. Box 1771

San Antonio, TX 78296

Jon C. Wood

Cox, Smith, & Matthews

112 East Pecan, Suite 1800

San Antonio, TX 78205

A. H. Gutterman, Esq.

Morgan, Lewis & Bockius LLP

1111 Pennsylvania Avenue, NW

Washington, DC 20004

Richard A. Ratliff, P.E., L.M.P.

Radiation Safety Licensing Branch Manager

Division for Regulatory Services

Texas Department of State Health

Mail Code 2385

P.O. Box 14947

Austin, TX 78714-9347

Brian Almon

Public Utility Commission of Texas

P.O. Box 13326

Austin, TX 78711-3326

Environmental and Natural Resources

Policy Director, Office of the Governor

P.O. Box 12428

Austin, TX 78711-3189

Nate McDonald

Judge, Matagorda County

Matagorda County Courthouse

1700 Seventh Street

Bay City, TX 77414

STP Nuclear Operating Company

- 5 -

Anthony P. Jones, Chief Boiler Inspector

Texas Department of Licensing and Regulation

Boiler Division

E.O. Thompson State Office Building

P.O. Box 12157

Austin, TX 78711

Susan M. Jablonski

Office of Permitting, Remediation and Registration

Texas Commission on Environmental Quality

MC-122

P.O. Box 13087

Austin, TX 78711-3087

Ted Enos

4200 South Hulen, Suite 422

Fort Worth, TX 76109

Kevin Howell/Catherine Callaway/Jim von Suskil

NRG Energy, Inc.

1301 McKinney, Suite 2300

Houston, TX 77010

Chief, Technological Hazards

Branch

FEMA Region VI

800 North Loop 288

Federal Regional Center

Denton, TX 76209

STP Nuclear Operating Company

- 6 -

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (John.Dixon@nrc.gov)

Resident Inspector (Binesh.Tharakan@nrc.gov)

Branch Chief, DRP/A (Wayne.Walker@nrc.gov)

Senior Project Engineer, DRP/A (David.Proulx@nrc.gov)

STP Administrative Assistant (Lynn.Wright@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Mohan.Thadani@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

R:\\

ADAMS ML

ADAMS: No 6 Yes

6 SUNSI Review Complete

Reviewer Initials: GWA

6 Publicly Available

6 Non-Sensitive

Non-publicly Available

Sensitive

OE:OB

C:OB

GApger

MSHaire

/RA/

/RA/

2/16/10

2/16/10

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax