W3F1-2010-0016, Supplement to Request for Exemption from Physical Security Requirement (Redacted)

From kanterella
(Redirected from ML100500999)
Jump to navigation Jump to search

Supplement to Request for Exemption from Physical Security Requirement (Redacted)
ML100500999
Person / Time
Site: Waterford Entergy icon.png
Issue date: 02/17/2010
From: Murillo R
Entergy Nuclear South, Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
W3F1-2010-0016
Download: ML100500999 (3)


Text

Entergy Nuclear South Entergy Operations, Inc.

17265 River Road Killona, LA 70057-3093 Tel 5047396715 Fax 504 739 6698 rmurill@entergy.com Robert J. Murillo Licensing Manager Waterford 3 W3F1-2010-0016 February 17, 2010 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Supplement to Request for Exemption from Physical Security Requirement (Redacted)

Waterford Steam Electric Station, Unit 3 (Waterford 3)

Docket No. 50-382 License No. NPF-38

REFERENCE:

1. Entergy letter dated January 19, 2010, Request for Exemption from Physical Security Requirement (W3F1 -2010-0001)

Dear Sir or Madam:

In response to NRC Project Manager email inquiry of January 27, 2010 (

Subject:

Part 73 Exemption Request - Phone call with Waterford 3) and as discussed in subsequent teleconference with NRC Projects on February 2, 2010, Entergy Operations, Inc. (Entergy) is supplementing the exemption request of Reference 1 with three clarifications, as follows:

with [...], 2)

1) Entergy is requesting an extension to [...] for establishing conformance Entergy is withdrawing statement [...], and 3) Entergy is providing more detailed milestones associated with achieving compliance with[...].

In the basis for the proposed exemption, Entergy provided that the current Fleet Security Strategy has added greater defense in depth to the Waterford 3 Security Plan by [...]. From the NRC Project review, the NRC needed clarity on [...]. From the teleconference of February 2, 2010, Entergy clarified that there was no intent to [...]. The idea of including

[...] in the basis was to provide the NRC with additional assurance [..

Entergy stated in the exemption request that [...]. After discussion with NRC NSIR and evaluation, Entergy withdraws this statement.

As per the teleconference of February 2, 2010, Entergy is providing more detailed milestones associated with [...] as follows:

[. .. ]

W3F1-20.10-0016 Page 2 There are no new commitments contained in this submittal. Please contact Robert J.

Murillo at (504) 739-6715 if you have any questions or require additional information.

Si RJM/MEM/ssf

4 .- ,

W.3F1-2Q10-0016 Page 3 cc: Mr. Elmo E. Collins, Jr.

Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 NRC Senior Resident Inspector Waterford Steam Electric Station Unit 3 P.O. Box 822 Killona, LA 70066-0751 U. S. Nuclear Regulatory Commission Attn: Mr. N. Kalyanam Mail Stop 08B1 Washington, DC 20555-0001 Wise, Carter, Child & Caraway ATTN: J. Smith P.O. Box 651 Jackson, MS 39205 Winston & Strawn ATTN: N.S. Reynolds 1700 K Street, NW Washington, DC 20006-3817 Morgan, Lewis & Bockius LLP ATTN: T.C. Poindexter 1111 Pennsylvania Avenue, NW Washington, DC 20004