G20100077/LTR-10-0044/EDATS: SECY-2010-0091 - Ltr. Adam Hill Relicensing Application for Diablo Canyon Nuclear Power Plant
ML100480036
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/07/2010
From: Hill A
San Luis Obispo County, CA
To: Jaczko G
NRC/Chairman
Green Kimberly NRR/DLR/RPB2 415-1627
Shared Package
ML102020514 List:
References
EDATS: SECY-2010-0091, G20100077, LTR-10-0044, SECY-2010-0091
Download: ML100480036 (5)


Text

EDO Principal Correspondence Control FROM:

DUE:

Adam Hill San Luis Obispo,, California EDO CONTROL: G20100077 DOC DT: 02/07/10 FINAL REPLY:

TO:

Chairman Jaczko FOR SIGNATURE OF GRN CRC NO: 10-0044 DESC:

ROUTING:

Relicensing Application for Diablo Canyon Nuclear Power Plant (EDATS: SECY-2010-0091)

Borchardt Virgilio Mallett Ash Mamish Burns/Rothschild Collins, RIV

Baggett, OEDO DATE: 02/12/10 ASSIGNED TO:

NRR CONTACT:

Leeds SPECIAL INSTRUCTIONS OR REMARKS:

For Appropriate Action.

If response is

made, please be sure to provide copies to OEDO and SECY, and create an ADAMS package to include the incoming with response.

'T~jqla~e

-H suiol el -1 12, bý : <0 E C-/ -0 1

EDATS Number: SECY-2010-0091 Source: SECY Geerl norato Assigned To: NRR Other Assignees:

Subject:

Relicensing Application for Diablo Canyon Nuclear Power Plant

==

Description:==

OEDO Due Date: NONE SECY Due Date: NONE CC Routing: RegionIV ADAMS Accession Numbers - Incoming: NONE Response/Package: NONE I

Ote Ifraion Cross Reference Number: G20 100077, LTR-10-0044 Related Task:

File Routing: EDATS Staff Initiated: NO Recurring Item: NO Agency Lesson Learned: NO OEDO Monthly Report Item: NO I

rcs Inforatio Action Type: Appropriate Action Priority: Medium Sensitivity: None Signature Level: No Signature Required Urgenc; Approval Level: No Approval Required OEDO Concurrence: NO OCM Concurrence: NO OCA Concurrence: NO Special Instructions: For Appropriate Action. If response is made, please be sure to provide copies to OEDO and SECY, and create an ADAMS package to include the incoming with response.

y: NO Originator Name: Adam Hill Date of Incoming: 2/7/2010 Originating Organization: San Luis Obispo County, Document Received by SECY Date: 2/12/20 1.0 California Addressee: Chairman Jaczko Date Response Requested by Originator: NONE Incoming Task Received: Letter Page 1 of l

f-OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Feb 12, 2010 12:52 PAPER NUMBER:

ACTION OFFICE:

LTR-10-0044 EDO LOGGING DATE:

02/12/2010 AUTHOR:

AFFILIATION:

ADDRESSEE:

SUBJECT:

ACTION:

DISTRIBUTION:

LETTER DATE:

ACKNOWLEDGED SPECIAL HANDLING:

Adam Hill CA Gregory Jaczko Relicensing application for Diablo Canyon Nuclear Power Plant Appropriate RF 02/07/2010 No NOTES:

FILE LOCATION:

ADAMS DATE DUE:

DATE SIGNED:

EDO -- G20100077

3**

BOARD OF SUPERVISORS 1055 MONTEREY, ROOM D430

  • 805.781.5450 BOARD OF SU ERVIORS ADAM HILL February 7, 2010 SUPERVISOR DISTRICT THREE Gregory B. Jaczko, Chairman c/o Annette I. Vietti-Cook, Secretary of the Commission U.S. Nuclear Regulatory Commission Mail Stop o-16G4 Washington, DC 20555-0001 February 16, 2010 RE: Relicensing application for Diablo Canyon Nuclear Power Plant

Dear Chairman Jaczko:

The San Luis Obispo County Board of Supervisors represents the residents who live within the Emergency Planning Zone of the Diablo Canyon Nuclear Power Plant. As such, we respectfully request that the NRC wait to begin processing the relicensing application filed in November 2009, until the seismic studies for the plant have been completed.

Our county has significant interest in seeing that these studies, as mandated by our local State Assemblyman Sam Blakeslee, be completed so as to best ensure the safety concerns of our citizens. Recently, the California Public Utilities Commission determined those studies be completed before any further taxpayer or ratepayer monies be invested in the relicensing process.

Thus, we make this request out of common sense, without any prejudice toward the power plant, which we recognize is of both local and statewide importance.

The application for relicensing was filed exactly one year after PG&E announced that an earthquake fault had been discovered 1800 feet offshore of the Diablo Canyon Nuclear Power Plant. Since then, the California Energy Commission has recommended further seismic studies to include three-dimensional geophysical mapping and other advanced techniques to explore fault zones near the power plant.

We are encouraged by the support shown for these expedited studies by our state's regulators and state legislature. We have also been encouraged by PG&E's willingness to complete these studies.

Thus, once again, in the interests of efficiency and openness, we respectfully ask that you allow these studies to be completed before public money is used to process the relicensing application for Diablo Canyon Nuclear Power Plant.

Sincerely, Vice-Chair San Luis Obispo County Board of Suopervisors CC: Assemblyman Sam Blakeslee State Senator Abel Maldonado U.S. Congresswoman Lois Capps