Letter to Elmo E. Collins, Jr., from FEMA, Region 6, Denton, Texas Dated January 5, 2010. Final Report for the Grand Gulf Nuclear Station (GGNS) Plume Pathway Exercise Evaluated on Sept. 9, 2009
ML100470454
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 01/05/2010
From: Tonya Russell
US Dept of Homeland Security, Federal Emergency Management Agency
To: Collins E
Region 4 Administrator
References
Download: ML100470454 (1)


Text

U.S. Department of Homeland Security FEMA Region 6 800 North loop 288 Denton, TX 76209-3698 FEMA Mr, Elmo E. Collins, Jr.

Regional Administrator U.S. NRC, Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005

Dear Mr. Collins:

Enclosed is a copy of the radiological emergency preparedness final report for the Grand Gulf Nuclear Station (GGNS) Plume Pathway exercise evaluated on September 9, 2009. There was one Deficiency, no Areas Requiring Corrective Actions, and no Plan Issues identified during this exerCise.

The Deficiency was assessed against Tensas Parish under the evaluation criteria 5.a.1 Activation of the Prompt Alert and Notification System. The Emergency Alert System (EAS) radio station was not equipped with an uninterruptible power supply and would not have been able to deliver an EAS message during a loss of power at the station. Corrective action for the Deficiency was completed on December 15,2009. A site visit was completed on December 23, 2009, to confirm completion of the corrective measures (installation of a back-up power supply) and the Deficiency has been closed.

Based on the results of this exercise, the ofTsite radiological emergency response plans and preparedness, for the State of Louisiana and the affected local jurisdictions are deemed adequate to provide reasonable assurance that appropriate measures can be taken to protect the health and safety of the public in the event ofa radiological emergency. Therefore, 44 CFR Part 350 approval of the offsite radiological emergency response plans and preparedness for the State of Louisiana site-specific to GGNS will remain in efTect.

A copy of this report was forwarded to Ms. Lisa Gibney, REP HQ Branch Chief and HQ Project Officer, U. S. Nuclear Regulatory Commission, in Washington, D.C. Should you have questions, please contact Lisa Hammond, Regional Assistance Committee Chair, at (940) 898-5199, or Bill Bischof, GGNS Site Specialist, at (940) 898-5562.