Summary of 01/26/2010 Public Meeting with Pacific Gas and Electric Company Regarding the Results of the Diablo Canyon Nuclear Plant Special Inspection
ML100390010
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/03/2010
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Conway J
Pacific Gas & Electric Co
References
Download: ML100390010 (11)


Text

UNITED STATES NUC LE AR RE G UL AT O RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU I TE 400 AR LI N GTON , TEXAS 76011-4125 February 3, 2010 John T. Conway Senior Vice President-Energy Supply and Chief Nuclear Officer Pacific Gas and Electric Company P.O. Box 3 Mail Code 104/6/601 Avila Beach, California 93424

SUBJECT:

SUMMARY

OF MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY REGARDING THE RESULTS OF THE DIABLO CANYON NUCLEAR PLANT SPECIAL INSPECTION

Dear Mr. Conway:

This refers to the public exit meeting conducted at San Luis Obispo, California on January 26, 2010, between the NRC and your staff. The participants discussed the results of the special inspection conducted at the Diablo Canyon Nuclear Plant from November 30 through December 3, 2009. The inspection focused on the circumstances involving the failure of valve interlocks needed for core cooling.

The attendance list is enclosed with this summary (Enclosure 1). A copy of the NRC presentation slides is also enclosed (Enclosure 2).

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, and its enclosure, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this matter, we will be pleased to discuss them with you.

Sincerely,

/RA/

Thomas R. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety

Pacific Gas and Electric Company 2 Dockets: 50-275 50-323 Licenses: DPR-80 DPR-82

Enclosures:

1. Attendance List
2. NRC Presentation Slides cc w/enclosures:

Electronic distribution by RIV:

Sierra Club San Lucia Chapter ATTN: Andrew Christie P.O. Box 15755 San Luis Obispo, CA 93406 Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, CA 93448 Chairman San Luis Obispo County Board of Supervisors 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Truman Burns\Robert Kinosian California Public Utilities Commission 505 Van Ness Ave., Rm. 4102 San Francisco, CA 94102 Diablo Canyon Independent Safety Committee Attn: Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940 Director, Radiological Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414

Pacific Gas and Electric Company 3 City Editor The Tribune 3825 South Higuera Street P.O. Box 112 San Luis Obispo, CA 93406-0112 James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 31)

Sacramento, CA 95814 James R. Becker, Site Vice President Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Jennifer Tang Field Representative United States Senator Barbara Boxer 1700 Montgomery Street, Suite 240 San Francisco, CA 94111 Chief, Technological Hazards Branch FEMA Region IX 1111 Broadway, Suite 1200 Oakland, CA 94607-4052

Pacific Gas and Electric Company 4 Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Michael.Peck@nrc.gov)

Resident Inspector (Tony.Brown@nrc.gov)

Branch Chief, DRP/B (Geoffrey.Miller@nrc.gov)

Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)

Acting Senior Project Engineer, DRP/B (Peter.Jayroe@nrc.gov)

DC Administrative Assistant (Agnes.Chan@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Laura.Uselding@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource SUNSI Review Completed: _______ADAMS: : Yes G No Initials: _TRF___

Publicly Available G Non-Publicly Available G Sensitive  : Non-Sensitive R:\REACTORS\DC Special Inspection Public Exit Meeting Summary - TRF ML C:DRS/EB1 TRFarnholtz

/RA/

02/ 3 /10 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax