|
---|
Category:E-Mail
MONTHYEARML24304A8572024-10-29029 October 2024 Draft Request for Additional Information: Palisades Operating Final Safety Analysis Report ML24295A3622024-10-21021 October 2024 Request for Additional Information Quality Assurance Program to Support License Transfer Request ML24289A1962024-10-10010 October 2024 Email Dated October 10, 2024 from Wallace Taylor Indicating His Intention to Refile ML24289A1952024-10-0909 October 2024 Follow-up Email Dated October 9, 2024 from the Office of the Secretary to Wallace Taylor Regarding the Filing Error ML24289A1932024-10-0808 October 2024 Email Dated October 9, 2024 from the Office of the Secretary to Wallace Taylor Regarding Filing Error ML24289A1942024-10-0808 October 2024 Email Dated October 8, 2024 from the Office of the Secretary to the Participants of the Palisades 50-255 & 72-007 LT-3 Proceeding Regarding Filing Error ML24277A3082024-10-0303 October 2024 Restart La Docs - 10-2-2024 Michigan SHPO Comments Re Palisades Nuclear Plant Architectural Survey ML24277A3042024-10-0303 October 2024 Restart La Docs - Sokaogon Chippewa Community Reply to NRC Status Update Re Palisades Restart ML24277A3032024-10-0303 October 2024 Restart La Docs - (External_Sender) Re Status Update - Palisades Request for Reauthorization of Power Operations ML24277A3062024-10-0303 October 2024 Restart La Docs - 9-18-2024 Michigan SHPO Comments on Palisades Phase I Archaeological Survey ML24277A3072024-10-0202 October 2024 Restart La Docs - (External_Sender) ER24-431 Palisades Nuclear Plant Subsequent License Renewal, Covert Township, Van Buren County (NRC) ML24270A2622024-09-26026 September 2024 Email to Petitioners and Licensee Representatives Transmitting Order of the Secretary Re Petition for Declaratory Order from Beyond Nuclear Et Al., for the Palisades Nuclear Plant ML24269A0162024-09-24024 September 2024 Email from Holtec Decommissioning International, LLC Re Reply to Beyond Nuclear Et Al.S Petition for Declaratory Order ML24277A3052024-09-18018 September 2024 Restart La Docs - (External_Sender) Sec. 106 Consultation - ER24-431, Palisades Phase I Archaeological Survey ML24262A0742024-09-18018 September 2024 Restart La Docs - FW Palisades Scoping Comment Period Ended ...E-mail Capture Platform Status ML24262A0732024-09-18018 September 2024 Restart La Docs - FW Palisades Scoping Comment Period Ended ...E-mail Capture Platform Status ML24291A2442024-09-18018 September 2024 Response to Questions from Alan Blind Regarding Public Meeting on August 1, 2024 ML24260A3552024-09-16016 September 2024 Restart La Docs - Palisades Reauthorization of Power Operations- Environmental Audit RCI Responses ML24260A3542024-09-12012 September 2024 Restart La Docs - (External_Sender) Re Palisades Reauthorization of Power Operations- Environmental Audit Draft RCIs ML24248A2612024-09-0404 September 2024 Restart La Docs - Palisades Reauthorization of Power Operations- Environmental Audit Draft RCIs ML24248A0572024-09-0404 September 2024 Restart La Docs - Draft Letter in Support of Draft RAIs and Draft Environmental Regulatory Audit Plan ML24248A2622024-09-0404 September 2024 Restart La Docs - FW Palisades Reauthorization of Power Operations- Environmental Audit Draft RCIs ML24248A0902024-08-28028 August 2024 Steam Generator Inspection Call ML24270A2712024-08-0707 August 2024 Public Comments for August 1, 2024, Public Outreach Meeting on Potential Palisades Nuclear Plant Restart ML24192A0012024-07-0606 July 2024 (E-Mail) Palisades Nuclear Plant - Plant - Draft Request for Additional Information: Palisades Operating TS License Amendment Request - June 6, 2024 ML24187A1332024-07-0505 July 2024 LTR-24-0069 Emailed Response Regarding Palisades Restart Project ML24192A1672024-06-28028 June 2024 Restart - NRC Request for Additional Information - EP ORO Coordination - June 28, 2024 ML24192A1472024-06-28028 June 2024 Email - Palisades Nuclear Plant - Draft Request for Additional Information: Palisades Administrative TS License Amendment Request - June 28, 2024 ML24248A0562024-06-27027 June 2024 Restart La Docs - Draft Letter in Support of Draft RAIs and Draft Environmental Regulatory Audit Plan ML24135A3542024-05-20020 May 2024 NRC Response to Jody Flynn of Michigan Regarding Statements Made About Holtec in the April 25, 2024 Peekskill Herald Article: Holtec Playing Fast and Loose with Taxpayers Money by Tina Volz-Bongar (Docket 50-255) ML24141A0862024-05-16016 May 2024 Notification of NRC Activities Regarding Palisades Restart ML24170A8812024-05-15015 May 2024 NRR E-mail Capture - Post Acceptance/Abeyance Process for the 10 CFR 2.206 Petition on Palisades Misuse of Decommissioning Trust Fund ML24032A2442024-02-0101 February 2024 OEDO-24-00011 - 10 CFR 2.206 Petition Holtec Misuse Decommissioning Fund- Email to Petitioner ML24005A1262024-01-0505 January 2024 Permanently Defueled Emergency Plan Implementation Notification ML23055A1532023-02-24024 February 2023 Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22343A1902022-12-0909 December 2022 Acceptance Review: Palisades Proposed Exemption from 10 CFR 140.11 (a)(4) – Primary and Secondary Liability Insurance ML22343A2282022-12-0909 December 2022 Acceptance Review: Palisades Proposed Exemption from 10 CFR 50.54(w)(1) - Onsite Property Damage Insurance ML22284A0502022-10-0707 October 2022 Acceptance Review: License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML22227A0092022-08-12012 August 2022 Acceptance Review: License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme (L-2022-LLA-0099) ML22227A0082022-08-12012 August 2022 Acceptance Review: Exemption Request from 10CFR50.47(b), 10 CFR 50.47(c)(2), and 10 CFR Part 50, Appendix E, Section IV ML22179A0752022-06-28028 June 2022 E-mail from Entergy Dated June 28, 2022, Notification of Palisades and Big Rock Point License Transfer (EPIDs L-2022-LLM-0002 and L-2020-LLM-0003) ML22159A2672022-06-0202 June 2022 Answers to Your Questions on Palisades ML22159A2652022-05-0303 May 2022 Questions Asked at Palisades Plant Performance Public Meeting April 26, 2022 ML21328A0062021-11-18018 November 2021 NRR E-mail Capture - (External_Sender) State of Michigan Response - Palisades Nuclear Plant and Big Rock Point Plant - Application for Order Consenting to Transfers of Licenses and Conforming License Amendments ML22208A1052021-11-16016 November 2021 NRR E-mail Capture - (External_Sender) State of Michigan Response - Palisades - Preparation for Issuance of Final Environmental Assessment and Finding of No Significant Impact Holtec Exemption Request to Use Dtf ML21309A5152021-11-0505 November 2021 NRR E-mail Capture - Palisades Nuclear Plant - Preparation for Issuance of Final Environmental Assessment and Finding of No Significant Impact Holtec Exemption Request to Use Dtf ML21309A2982021-11-0505 November 2021 NRR E-mail Capture - Palisades Nuclear Plant and Big Rock Point Plant - Application for Order Consenting to Transfers of Licenses and Conforming License Amendments ML21209A9802021-07-28028 July 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of Requested Licensing Action, Rescission of Interim Compensatory Measure from Order EA-02-026 ML21189A2462021-07-0606 July 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of Requested Licensing Action, Proposed Partial Exemption from Record Retention Requirements ML21189A0432021-07-0606 July 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of Requested Licensing Action, Permanently Defueled Technical Specifications 2024-09-04
[Table view] |
Text
From: Smith, Stephen Sent: Friday, January 22, 2010 11:38 AM To: Scott, Michael; Savoy, Joanne
Subject:
Palisades RAI Regarding Strainer Vortex Formation-RAI No Longer Required Follow Up Flag: Follow up Flag Status: Flagged
- Joanne, Please put this email in ADAMS and in the Palisades GSI-191 folder.
The Palisades licensee was requested, via draft RAI 26.b to provide information that justified that a vortex would not occur at relatively low strainer submergences. The low submergence cases only apply during small break LOCAs. Large break LOCAs were shown to have adequate submergence to prevent vortex formation. During a phone call to clarify RAIs, the licensee stated that they had already provided adequate information in a previous supplemental response (ML091820275, pg 91 and 92).
The staff reviewed the supplemental response and noted the following: The licensee provided information that compared the predicted minimum water level with water levels at which vortices had been observed under various test conditions. The licensee provided three test cases in which vortex formation was observed. For the two cases with small debris loads, a vortex formation was not observed until the submergence level was decreased several inches below the plant minimum flood level. For the case with the design basis debris load, the vortex was observed at a submergence about 2.5 inches above the predicted minimum flood level. The licensee also provided a conservative comparison between potential small break and large break debris generation loads. The comparison shows that the small break would generate significantly less debris than the large break and would therefore likely have lower head loss.
The licensee also stated that the flow rate through the strainer during a SBLOCA during which the SITs would not discharge would be much lower than the tested flow rates. This would decrease head loss and the potential for vortex formation.
Based on the comparison of the vortex tests and the debris that would be available for the small and large break cases, and considering the lower flow rate that would occur with a break that did not allow SIT injection, it is concluded that it is reasonable that the formation of vortices will not occur for the Palisades strainer.
The staff concluded that draft RAI 26.b had been adequately addressed by the licensee and no further information was required.
Steve Smith USNRC NRR/DSS/SSIB 301-415-3190 stephen.smith@nrc.gov E-mail Properties
Mail Envelope Properties (192BB59294514E41B5305C3C82867608069C4DF1C4)
Subject:
Palisades RAI Regarding Strainer Vortex Formation-RAI No Longer Required Sent Date: 1/22/2010 11:38:11 AM Received Date: 1/22/2010 11:38:11 AM From: Smith, Stephen Created By: Stephen.Smith@nrc.gov Recipients:
Michael.Scott@nrc.gov (Scott, Michael)
Tracking Status: None Joanne.Savoy@nrc.gov (Savoy, Joanne)
Tracking Status: None Post Office:
HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 16350 1/22/2010 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: Follow up. Start by Monday, January 25, 2010. Due by Monday, January 25, 2010