ML100250867
ML100250867 | |
Person / Time | |
---|---|
Site: | Vogtle |
Issue date: | 01/25/2010 |
From: | Widmann M NRC/RGN-II/DRS/OLB |
To: | Brigdon R Southern Nuclear Operating Co |
References | |
Download: ML100250867 (3) | |
Similar Documents at Vogtle | |
---|---|
Category:Letter
MONTHYEARNL-24-0385, Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator2024-10-31031 October 2024
[Table view]Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator IR 05000424/20240032024-10-30030 October 2024 – Integrated Inspection Report 05000424/2024003 and 05000425/2024003 NL-24-0386, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information2024-10-28028 October 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0366, Core Operating Limits Report, Cycle 26, Version 12024-10-25025 October 2024 Core Operating Limits Report, Cycle 26, Version 1 ML24297A6482024-10-23023 October 2024 5 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, Summary Report and Revised NRC Commitments Report ML24269A2502024-09-26026 September 2024 Acknowledgement of the Withdrawal of the Requested Exemption and License Amendment Request to Remove Tier 1 and Tier 2* Requirements NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 ML24243A0072024-09-10010 September 2024 – Correction of Amendment Nos. 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24102A2642024-09-0909 September 2024 – Exemption Request Regarding Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0013) - Letter ML24249A2942024-09-0606 September 2024 Correction of Amendment Nos. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology 05200025/LER-2024-002, Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve2024-09-0505 September 2024 Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 ML24235A1952024-08-22022 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information 05000425/LER-2024-001, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod2024-08-0909 August 2024 Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod ML24218A1842024-08-0707 August 2024 Examination Report and Cover Letter 05200026/LER-2024-001, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal2024-08-0606 August 2024 Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24191A4562024-07-19019 July 2024 Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use ML24163A0632024-06-12012 June 2024 2024 Licensed Operator Re-qualification Inspection Notification Letter Vogtle, Units 3 & 4 ML24155A1772024-06-0505 June 2024 Regulatory Audit in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, Surveillance Requirements NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24094A1402024-05-16016 May 2024 Staff Response to Request for Revision to NRC Staff Assessment of Updated Seismic Hazard Information and Latest Understanding of Seismic Hazards at the Vogtle Plant Site Following the NRC Process for the Ongoing Assessment of Natural Hazard ML24120A1812024-05-13013 May 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage IR24 Steam Generator Tube Inspection Report – Enclosure 2 ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24101A2112024-05-11011 May 2024 Expedited Issuance of Amendment No. 198 Change to Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) ML24120A2832024-04-30030 April 2024 Project Manager Reassignment 2024-09-09 Category:License-Operator MONTHYEARML24214A0022024-08-0101 August 2024
[Table view]Final SRO Written Exam Vogtle Units 3 and 4 2024-301 Combined (Redacted for Public Release) ML24213A0852024-07-31031 July 2024 Final RO Written Exam Vogtle, Units 3 and 4, 2024-301 Combined (Redacted for Public Release) ML23243B0252023-08-30030 August 2023 Exam Corporate Notification Letter (210 Day) ML23229A1472023-06-22022 June 2023 301, 2B - Exam Administrative Items ML23159A0802023-06-0808 June 2023 301 Post Examination Comments NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. ML22280A0542022-10-0606 October 2022 Notification of Licensed Operator Initial Examination 05000424/2023301 and 05000425/2023301 ML22136A2082022-05-16016 May 2022 2B Exam Administrative Items- Normal Release NL-22-0240, SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations2022-03-31031 March 2022 SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations ML22068A2112022-03-0909 March 2022 301 AP-1000 Written Exam Approval Letter ML22010A1962022-01-10010 January 2022 301 Exam Administrative Items (Normal Release) (ADAMS-2B) ML21313A1802021-11-0909 November 2021 Operator Licensing Examination Approval 05000424/2021301 and 05000425/2021301 ML21189A1562021-07-0808 July 2021 Enclosure 2: Unit 4 Operator Candidates Requesting Credit for Unit 3 Written Examination and Operating Test ND-21-0427, Enclosure 3: Sample NRC Form 398 Personal Qualification Statement - Licensee2021-07-0808 July 2021 Enclosure 3: Sample NRC Form 398 Personal Qualification Statement - Licensee ML21181A3912021-06-30030 June 2021 301 Corporate Notification Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML21053A0322020-11-10010 November 2020 301 Corporate Notification Letter ML20118C1532020-04-27027 April 2020 3 2020-301 Exam Report Items - RO Written Exam (Public).Pdf ML20148M3712020-04-27027 April 2020 ADAMS-2A-2 Vogtle-3 2020-301 Final Items Public ML20148M3722020-04-27027 April 2020 ADAMS-2A-3 Vogtle-3&4 2020-301 Final Admin Items Public.Pdf ML20148M3672020-04-27027 April 2020 ADAMS-2B Vogtle-3 2020-301 Public ML20118C1552020-04-27027 April 2020 3 2020-301 Exam Report Items - SRO Written Exam (Public).Pdf ML20148M3682020-04-27027 April 2020 ADAMS-2A-1 Vogtle-3 2020-301 Draft Items Public NL-20-0265, SNC Response to Regulatory Issue Summary 2020-01: Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 SNC Response to Regulatory Issue Summary 2020-01: Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML21074A3462019-08-29029 August 2019 Adams 2C ML21074A3822019-08-29029 August 2019 ADAMS 2B ML21074A3402019-08-29029 August 2019 301 ADAMS 2D ML19204A3402019-07-22022 July 2019 Notification of Licensed Operator Initial Examination (05200025/2020301) ML19115A2892019-04-25025 April 2019 301 ADAMS-2C Exam Administrative Items ML19115A2872019-04-25025 April 2019 301 ADAMS-2B Exam Final Items ML19115A2992019-04-25025 April 2019 301 ADAMS-2D Exam Administrative Items ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18332A4952018-11-29029 November 2018 Draft NRC Form 398 Block 25 Comments ML18332A4962018-11-29029 November 2018 Draft NRC Form 398 Example (Redacted) ML18240A4322018-08-28028 August 2018 301 Exam Administrative Items 2D - Normal Release ML18240A4312018-08-28028 August 2018 301 Exam Administrative Items ADAMS-2C - Delay Release 2 Yrs ML18240A4282018-08-28028 August 2018 301 Exam Final Items 2B - Delay Release 2 Yrs NL-18-0550, Response to Regulatory Issue Summary 2018-02 - Preparation and Scheduling of Operator Licensing Examinations2018-04-23023 April 2018 Response to Regulatory Issue Summary 2018-02 - Preparation and Scheduling of Operator Licensing Examinations ML18065A3592018-03-0101 March 2018 05200025/2018301 AP-1000 Written Exam Approval Letter ML18057B4642018-02-26026 February 2018 05000424/2017301 and 05000425/2017301 Exam Final Items 2B - Delay Release 2 Yrs IR 05000424/20173012018-02-26026 February 2018 05000424/2017301 and 05000425/2017301 Exam Administrative Items 2C - Delay Release 2 Yrs ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE ML18032A2662018-02-0101 February 2018 05200025/2016301 Initial NRC Exam - ADAMS 2C - Public Exam Administrative Items - Delay Release 2 Yrs ML18032A2372018-02-0101 February 2018 Form ES-201 Vogtle 3&4, V.C. Summer 2&3 Initial NRC Written Exam Sample Plan - ADAMS 2A - Public Exam Draft Items - Delay Release 2 Years ML18032A2182018-02-0101 February 2018 05200025/2016301 Initial NRC Exam - ADAMS 2D - Public Exam Administrative Items ML17276B8322017-10-0303 October 2017 Final RO Written Exam 05000424/2017301 and 05000425/2017301 - Delay Release 2 Years ML17276B8332017-10-0303 October 2017 Final RO Supplemental Written Exam 05000424/2017301 and 05000425/2017301 - Delay Release 2 Years ML17276B8352017-10-0303 October 2017 Final SRO Supplemental Written Exam 05000424/2017301 and 05000425/2017301 - Delay Release 2 Yrs ML17276B8372017-10-0303 October 2017 Final SRO Written Exam 05000424/2017301 and 05000425/2017301 - Delay Release 2 Yrs 2024-08-01 Category:Other HQ and Regional Correspondence MONTHYEARML13071A2262013-04-25025 April 2013
[Table view]Informal Review Results Charlissa C. Smith Senior Reactor Operator Applicant, Vogtle Electric Generating Plant ML13070A0742013-04-25025 April 2013 Informal Review Results-Charlissa C. Smith Senior Reactor Operator Applicant, Vogtle Electric Generating Plant ML13070A0722013-04-25025 April 2013 Informal Review Results-Charlissa C. Smith Senior Reactor Operator, Applicant, Vogtle Electric Generating Plant ML13070A0702013-04-25025 April 2013 Informal Review Results - Charlissa C. Smith: Senior Reactor Operator Applicant, Vogtle Electric Generating Plant ML1002508672010-01-25025 January 2010 NRC Generic Fundamentals Examination Results 2013-04-25 |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 January 25, 2010 Southern Nuclear Operating Company, Inc.
ATTN: Mr. Richard D. Brigdon Plant Training and Emergency Preparedness Manager Vogtle Electric Generating Plant 7821 River Road Bin 63030 Waynesboro, GA 30830-2965
SUBJECT:
VOGTLE - NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS
Dear Mr. Brigdon:
On December 9, 2009, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) of the written operator licensing examination to employees of your facility. Enclosed with this letter are copies of the final answer key, the grading results for your facility, and copies of individual answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. A P in the RESULTS column indicates that the individual achieved a passing grade of 80 percent or better on the GFE, while an F indicates that the individual failed the examination.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter without its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
If you have any questions concerning this examination, please contact me at (404) 562-4550.
Sincerely,
/RA/
Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81
Enclosures:
(See Page 2)
R. Brigdon 2
Enclosures:
- 1. Final Answer Key
- 2. Examination Results Summary
- 3. Individual Answer Sheets cc w/o encls.:
Southern Nuclear Operating Company, Inc.
ATTN: Mr. Tom Tynan Vice President Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830-2965
ML X SUNSI REVIEW COMPLETE OFFICE RII:DRS SIGNATURE MTW NAME MWIDMANN DATE 1/ 25/2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO