Request for Exemptions from 10 CFR 73.55 Power Reactor Security Requirements Final Rule
ML100131116
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 01/12/2010
From: Hartz L
Dominion Nuclear Connecticut
To:
Document Control Desk, NRC/FSME, Office of Nuclear Security and Incident Response
References
10-015, FOIA/PA-2011-0115
Download: ML100131116 (2)


Text

Dominion Dominion Nuclear Connecticut, Inc.

Millstone Power Station Rope Ferry Road Waterford, CT 06385 SAFEGUARDS INFORMATION JAN 1 2 2010 Attention: Document Control Desk Director, Division of Nuclear Security Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Serial No.:

10-015 NL&OS/MAE: RO Docket Nos.: 50-245/336/423 License Nos.: DPR-21/65 NPF-49 DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNITS 1, 2 AND 3 REQUEST FOR EXEMPTIONS FROM 10 CFR 73.55 POWER REACTOR SECURITY REQUIREMENTS FINAL RULE Pursuant to 10 CFR 73.5, Dominion Nuclear Connecticut, Inc. (DNC) is requesting exemptions from portions of 10 CFR 73.55 of the final rule, Power Reactor Security Requirements, which was published March 27, 2009 in the Federal Register.

Specifically, DNC is requesting that the compliance date for implementing certain measures required by the new rule be extended for Millstone Power Station. The exemption requests concerning alarm station requirements are provided in Attachment 1 and the proposed list of milestone dates is provided in Attachment 2. The exemption requests for the uninterruptible power supplies are provided in Attachment 3 and the proposed list of milestone dates is provided in Attachment 4.

The attached material contains Safeguards Information as defined by 10 CFR 73.22 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.

DNC is requesting that the review of these exemption requests be expedited due to a March 31, 2010 compliance date for the final rule.

If you have any questions, please contact Ms. Margaret Earle at (804) 273-2768.

Sincerely, Classified By:

Name: Nelson K. Martin

Title:

Manager Nuc. Fleet Protection Services Organization: Nuc. Protection Services/ Dominion Effective Date: January 6, 2010 Leslie N. Hartz I Vice President - Nuclear Support Services Attachments I Unauthorized Disclosure Of Safeguards Information Will Be Subject To Civil And Criminal Sanctions Commitments made by this letter: None NOTE: THE ATTACHMENTS TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ATTACHMENTS, THIS LETTER IS "DECONTROLLED."

SAFEGUARDS INFORMATION

,ksru

/: T e k, 51.sso F

SAFEGUARDS INFORMATION Serial No.10-015 Security Exemption Requests Page 2 of 2 cc:

U. S. Nuclear Regulatory Commission Region I Regional Administrator 475 Allendale Road King of Prussia, PA 19406-1415 Mr. J. B. Hickman NRC Project Manager Millstone Unit 1 U. S. Nuclear Regulatory Commission Mail Stop T-8 F5 Two White Flint North 11545 Rockville Pike Rockville, MD 20852-2738 Ms. C. J. Sanders NRC Project Manager Millstone Units 2 & 3 U. S. Nuclear Regulatory Commission Mail Stop 0-8-B 1A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Ms. L. A. Kauffman NRC Inspector 475 Allendale Road King of Prussia, PA 19406-1415 NRC Senior Resident Inspector Millstone Power Station NOTE: THE ATTACHMENTS TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ATTACHMENTS, THIS LETTER IS "DECONTROLLED."