MONTHYEARML24009A0552024-01-24024 January 2024 Summary of January 8, 2024, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Removal of the Power Distribution Monitoring System from Technical Specifications ML23363A0942024-01-0303 January 2024 Summary of October 4, 2023, Pre Submittal Meeting Between the U.S. NRC and Constellation Energy Generation, LLC, Regarding Revising Technical Specification 3.7.9. Ultimate Heat Sink (UHS) ML23352A3822023-12-19019 December 2023 Summary of December 11, 2023, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Deletion of Technical Specification 5.6.5.b.5 ML23320A2472023-11-17017 November 2023 Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 ML23263B1062023-09-22022 September 2023 R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary ML23164A2112023-06-14014 June 2023 Summary of the June 1, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2; and Byron Station, Units 1 and 2 ML23129A0202023-05-30030 May 2023 Summary of March 22, 2023, Closed Meeting with Constellation Energy Generation, LLC, to Discuss a Future License Amendment Request That Allows Byron Station and Braidwood Station to Utilize a New Citicality Analysis for the Spent Fuel Pools ML23055A0352023-03-24024 March 2023 Summary of February 23, 2023, with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans to Revise Emergency Action Levels ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML22264A1992022-11-14014 November 2022 Summary of August 22, 2022, Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Steam Generator Welds (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and ML22305A5992022-11-10010 November 2022 Summary of Closed Presubmittal Meeting Between the U. S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Transition to Framatome Fuel ML22159A2232022-06-0909 June 2022 Summary of the June 2, 2022, Public Outreach to Discuss the NRC 2021 End of Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2 ML22111A3362022-05-0909 May 2022 Summary of April 7, 2022, Meeting Between the NRC and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Pressurizer Welds (Epids L-2022-LRR-0035 and 0036) ML22111A2852022-05-0909 May 2022 Summary of April 4, 2022, Meeting Between the U.S. NRC and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Pressurizer Welds (EPIDs L-2022-LLR-0035/36) ML21330A0722021-12-0303 December 2021 Summary of November 17, 2021, Meeting with Exelon Generation Company, LLC, Related to a Future License Amendment to Remove License Condition 2.C.(12)(d) for Braidwood Station, Unit 2 ML21333A1532021-11-30030 November 2021 Summary of November 16, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Extend the Inservice Inspection Interval ML21237A0412021-08-30030 August 2021 Summary of the July 27, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use Case OMN-28, ML21176A0822021-07-0606 July 2021 June 15, 2021, Summary of Meeting with Exelon Generation Company, LLC Vessel Nozzle Repair Related to a Planned Request for an Alternative Related to Reactor Pressure ML21139A1852021-06-22022 June 2021 Summary of Meeting with Exelon Generation Company, LLC Regarding Its Requested Alternative to Eliminate Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting ML21167A2152021-06-16016 June 2021 June 8, 2021, Summary of the Public Outreach to Discuss the NRC 2020 End-Of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2; and Byron Station, Units 1 and 2 ML21147A4262021-06-0303 June 2021 Summary of May 12, 2021, Meeting with Exelon Generation Company, Llc, Related to a Planned License Amendment to Modify the Ultimate Heat Sink Technical Specifications ML21011A2822021-01-21021 January 2021 Summary of January 6, 2021, Presubmittal Meeting Between the NRC and Exelon Generation Company, LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Unit Nos. 1 and 2 and Dresden, Units 2 and 3 ML20351A2832020-12-18018 December 2020 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Exemption to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20342A3522020-12-10010 December 2020 Summary of November 13, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alterantive to Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting (EPID-L-2020-LRM-0102) ML20323A0332020-12-0101 December 2020 Summary of November 4, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20218A5302020-08-0505 August 2020 July 14, 2020, Summary of the Public Webinar to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2; and Byron Station, Units 1 and 2 ML20181A0002020-06-29029 June 2020 Summary of 6/24/20 Meeting with Exelon Generation Company, LLC Regarding Planned Request for Alternative to Supplemental Valve Position Indication Testing Requirements for Braidwood, Calvert Cliffs, Clinton, Limerick, Nine Mile, Peach Botto ML19326A3152019-12-0303 December 2019 Summary of November 18, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Supplemental Valve Position Indication Testing Requirements ML19326C3582019-12-0303 December 2019 Summary of November 20, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Revise the Quality Assurance Program ML19162A0272019-06-21021 June 2019 Summary of June 4, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Extend the Test Interval for Safety Relief Valves ML20108F0902019-04-20020 April 2019 April 15, 2020, Meeting Summary with Exelon Generation Company, LLC Regarding Planned Request to Defer Submittal of Owner'S Activity Report (Braidwood 2,Byron 2,Calvert Cliffs 1, LaSalle 1, Limerick 1, Nine Mile Point 2, Quad 2, R. E. Ginna ML19036A8832019-02-0707 February 2019 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use ASME Code Case N-879 ML18354B1712019-01-0202 January 2019 Summary of December 19, 2018, Meeting with Exelon Generation Company, LLC Regarding the Use of Boiling Water Reactor Vessel and Internals Project Guidelines ML18325A1712018-11-28028 November 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned Fleet License Amendment Request to Revise Technical Specifications for High Radiation Areas ML18297A1722018-10-26026 October 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned License Amendment Request to Adopt TSTF-427 ML18225A3042018-08-16016 August 2018 Summary of August 8, 2018, Meeting with Exelon Generation Company, LLC, on a Future Relief Request to Extend the Post Peening Follow-Up Inspections for Certain Reactor Pressure Vessel Head Penetrations ML18135A0222018-05-14014 May 2018 Summary of the May 10th, 2018, Public Open House Regarding Braidwood Nuclear Power Station ML18120A1772018-05-0101 May 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Draft Guidance for Emergency Response Organization Staffing ML18065A8362018-03-0707 March 2018 Summary of February 27, 2018, Meeting with Exelon Generation Company, LLC Planned Fleet License Amendment Request to Relocate Staff Qualification Requirements from TSs to the Quality Assurance Topical Report ML18058A5232018-03-0101 March 2018 Summary of February 26, 2018, Meeting with Exelon Generation Company, LLC Regarding Proposed Alternative to the Main Steam Isolation Valve Testing Requirements ML18018B4432018-01-25025 January 2018 Summary of December 17, 2017, Closed Meeting with Exelon Generation Company, LLC, Regarding Tvel Lead Test Assemblies to Be Placed in the Braidwood Reactor (EPID 000976/05000456/L-2017-LRM and 000976/05000457/L-2017-LRM-0047 ML17347B1022017-12-14014 December 2017 Summary of Meeting with Exelon Generation Company, LLC on Its Planned Fleet License Amendment Request to Revise the Minimum Staffing Requirements for Emergency Response ML17184A0092017-07-10010 July 2017 Summary of June 29, 2017, Meeting with Exelon Generation Company, LLC, on Proposed Changes to Emergency Plans to Revise Emergency Action Levels (CAC Nos. MF9779-MF9801) ML17164A0512017-06-15015 June 2017 Summary of May 25, 2017, Meeting with Exelon Generation Company, LLC, on a Future License Amendment Request to Add Mitigating Actions to Technical Specifications with Two Control Room Ventilation Temperature Control System Trains Inoperable ML17132A3422017-05-12012 May 2017 Summary of the April 28, 2017, Open House to Discuss the 2016 End-of-Cycle Plant Performance Assessment of Braidwood Station ML17074A2562017-03-27027 March 2017 Summary of March 6, 2017, Closed Meeting with Exelon Generation Company, LLC, on a Future Exemption Request to Please Lead Test Assemblies in the Braidwood Reactor ML17066A0502017-03-13013 March 2017 Summary of Meeting with Meeting with Samuel Miranda to Discuss November 15, 2016, Petition ML17009A0672017-01-12012 January 2017 Summary of Meeting with Exelon Generation Company LLC to Discuss Proposed Submittal Related to Reactor Pressure Vessel Nozzle Inspections ML16236A0292016-08-25025 August 2016 Summary of Closed Meeting with Exelon Generation Company, LLC, on Lead Test Assemblies ML16203A3602016-07-21021 July 2016 Summary of the July 14, 2016, Public Open House Regarding Braidwood Nuclear Power Station 2024-01-03
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 January 12, 2010 LICENSEE: Exelon Generation Company, LLC FACILITY: Braidwood Station, Units 1 and 2
SUBJECT:
MEETING
SUMMARY
FOR REGULATORY CONFERENCE (EA-09-259)
On January 6, 2010, representatives of Exelon Generation Company, LLC, the licensee for Braidwood Station, Units 1 and 2, met with NRC personnel in the Region III office located in Lisle, Illinois, to discuss the apparent violation identified in NRC Inspection Report Number 2009-007. The regulatory conference was held at the request of the licensee.
The purpose of the regulatory conference was to discuss the preliminary yellow finding regarding the failure of the B train containment sump suction isolation valve to fully open at Braidwood Station Unit 1.
The licensee presented a summary of the causes for the apparent violation and the associated corrective actions. The licensee did not present any new information other than the documents already provided to the NRC. The focus of the licensees presentation was that recovery credit should be given for manual actions that could be taken in the event of the loss of coolant accidents.
The attendance list is attached to this summary. Also, a copy of the licensees slides presented during the meeting can be found in Agencywide Documents Access and Management System (ADAMS) as ML100050639.
There were two members of the public present at this meeting via teleconference. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this summary and its enclosure will be made available to the Public.
Sincerely,
/RA/
Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects License Nos. NPF-72 Docket Nos. 50-456
Enclosure:
Attendance List cc w/encl: Distribution via ListServ
ATTENDEE LIST REGULATORY CONFERENCE BYRON (EA-09-259) - JANUARY 6, 2010 Exelon S. Landahl, Vice President, Midwest Operations K. Jury, Vice President, Licensing and Regulatory Affairs A. Shahkarami, Site Vice President, Braidwood Station L. Coyle, Plant Manager, Braidwood T. McCool, Operations Director, Braidwood Station G. Krueger, Corporate Risk Management Manager M. Smith, Engineering Director, Braidwood Station D. Czufin, Vice President, Engineering D. Benyak, Licensing Director P. Simpson, Licensing Manager R. Gaston, Regulatory Affairs Manager R. Linthicum, Corporate Risk Management Engineer D. Macleod, Corporate Risk Management Engineer J. Gabor, Corporate Risk Management Engineer A. Hambly, Corporate Licensing Engineer L. Schofield, Corporate Licensing Engineer M. Sheaffer, Corporate Senior Engineer D. Crytzer, Corporate Principal Engineer D. Gullott, Regulatory Assurance Manager, Braidwood Station L. Brooks, Shift Operations Superintendent, Braidwood Station J. Moser, Radiation Protection Manager, Braidwood Station N. Miller, Communications Manager, Braidwood Station M. Melnicuff, Risk Management Engineer, Braidwood Station T. Mattson, NRC Coordinator, Braidwood Station T. Hulbert, NRC Coordinator, Byron Station Illinois Emergency Management Agency C. Settles, Section Head, Nuclear Facility Safety R. Zuffa, Unit Head, Nuclear facility Safety M. Perry, Resident Inspector, Braidwood Station Nuclear Regulatory Commission M. Satorius, Regional Administrator, Region III S. West, Director, DRP, Region III G. Shear, Deputy Director, DRP, Region III A. Boland, Director, DRS, Region III R. Skokowski, Chief, Branch 3, DRP, Region III B. Dickson, Senior Resident Inspector, Braidwood Station S. Orth, Enforcement Officer, Region III L. Kozak, Senior Risk Analyst, DRP, Region III N. Valos, Senior Risk Analyst, DRP, Region III J. Circle, Senior Reliability/Risk Analyst, PRA Operational Support Branch, NRR L. James, Chief, Division of Risk Assessment, NRR
M. David, Project Manager - Braidwood, NRR J. Lara, Chief, Technical Support Staff, DRP, Region III D. Passehl, Senior Risk Analyst, DRP, Region III B. Bartlett, Senior Resident Inspector, Byron Station J. Robbins, Resident Inspector, Byron Station J. Benjamin, Project Engineer, Branch 1, DRP, Region III E. Coffman, Reactor Engineer, Branch 1, DRP, Region III D. Sand, Reactor Engineer, Branch 1, DRP, Region III A. Scarbeary, Reactor Engineer, Branch 2, DRP, Region III R. Ng, Project Engineer, Branch 3, DRP, Region III T. Hartman, Reactor Engineer, Branch 3, DRP, Region III D. Betancourt, Reactor Engineer, Branch 4, DRP, Region III F. Tran, Reactor Engineer, Branch 4, DRP, Region III R. Krsek, Acting Project Engineer, Branch 5, DRP, Region III R. Edwards, Reactor Engineer, Branch 5, DRP, Region III P. Voss, Reactor Engineer, Branch 6, DRP, Region III T. Briley, Reactor Engineer, Branch 6, DRP, Region III C. Moore, Operator Licensing Inspector, Operations Branch, DRS, Region III M. Holmberg, Senior Reactor Inspector, Engineering Branch 1, DRS, Region III J. Neurauter, Senior Reactor Inspector, Engineering Branch 1, DRS, Region III A. Shaikf, Reactor Inspector, Engineering Branch 1, DRS, Region III A. Dunlop, Senior Reactor Inspector, Engineering Branch 2, DRS, Region III M. Abid, Reactor Inspector, Engineering Branch 2, DRS, Region III A. Dahbur, Senior Reactor Inspector, Engineering Branch 3, DRS, Region III M. Munir, Reactor Inspector, Engineering Branch 3, DRS, Region III D. Szwarc, Reactor Inspector, Engineering Branch 3, DRS, Region III J. Gilliam, Reactor Inspector, Engineering Branch 3, DRS, Region III S. Edmonds, Reactor Inspector, Engineering Branch 3, DRS, Region III H. Logaras, Regional Liaison Specialist, Region III M. Gryglak, Enforcement and Allegation Coordinator, Region III Will County Emergency Management Agency A. Marzano, Assistant Director of Operations
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 January 12, 2010 LICENSEE: Exelon Generation Company, LLC FACILITY: Braidwood Station, Units 1 and 2
SUBJECT:
MEETING
SUMMARY
FOR REGULATORY CONFERENCE (EA-09-259)
On January 6, 2010, representatives of Exelon Generation Company, LLC, the licensee for Braidwood Station, Units 1 and 2, met with NRC personnel in the Region III office located in Lisle, Illinois, to discuss the apparent violation identified in NRC Inspection Report Number 2009-007. The regulatory conference was held at the request of the licensee.
The purpose of the regulatory conference was to discuss the preliminary yellow finding regarding the failure of the B train containment sump suction isolation valve to fully open at Braidwood Station Unit 1.
The licensee presented a summary of the causes for the apparent violation and the associated corrective actions. The licensee did not present any new information other than the documents already provided to the NRC. The focus of the licensees presentation was that recovery credit should be given for manual actions that could be taken in the event of the loss of coolant accidents.
The attendance list is attached to this summary. Also, a copy of the licensees slides presented during the meeting can be found in Agencywide Documents Access and Management System (ADAMS) as ML100050639.
There were two members of the public present at this meeting via teleconference. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this summary and its enclosure will be made available to the Public.
Sincerely,
/RA/
Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects License Nos. NPF-72 Docket Nos. 50-456
Enclosure:
Attendance List cc w/encl: Distribution via ListServ DOCUMENT NAME: G:\Braidwood\Bwd Reg Conference Meeting Summary.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME RNg:dtp RSkokowski DATE 01/12/10 01/12/10 OFFICIAL RECORD COPY
Letter to Exelon Generation Company, LLC, from R. Skokowski dated January 12, 2010.
SUBJECT:
MEETING
SUMMARY
FOR REGULATORY CONFERENCE (EA-09-259)
DISTRIBUTION:
RidsNrrDorlLpl3-2 Resource Susan Bagley RidsNrrPMBraidwood Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Carole Ariano Linda Linn Patricia Buckley Tammy Tomczak ROPreports Resource