Email from Vincent Dale to Thomas Wengert Dated 9/1/09
ML100120603
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 09/01/2009
From: Vincent D
Xcel Energy
To: Thomas Wengert
Plant Licensing Branch III
Wengert, Thomas J, NRR/DORL, 415-4037
References
Download: ML100120603 (2)


Text

From:

Vincent, Dale M. [Dale.Vincent@xenuclear.com]

Sent:

Tuesday, September 01, 2009 2:42 PM To:

Wengert, Thomas

Subject:

RE: Prairie Island - Review of 2008 Unit 2 180-Day SG Tube Inspection Report Attachments:

RAI responses 2008 Unit 2 Steam Generator Tube Inspection Report.doc Tom, attached are the responses to the RAIs presented below.

From: Wengert, Thomas [1]

Sent: Friday, August 21, 2009 1:25 PM To: Vincent, Dale M.

Cc: Obodoako, Aloysius

Subject:

Prairie Island - Review of 2008 Unit 2 180-Day SG Tube Inspection Report

Dale, The NRC staff is reviewing the subject report, which was submitted on April 27, 2009 (ADAMS Accession No. ML091180466), and would like confirmation of several items, as follows:
1. Confirm that no crack-like indications were left in service except for those that would have been permitted to be left in service with the F* repair criteria.
2. Confirm that the only crack-like indications detected were either located in the tubesheet crevice or the sludge pile at the top of the tubesheet.
3. Confirm that no degradation was observed during the inspections of the upper internals of the steam generators.
4. Confirm that no wear was attributed to loose parts. In addition, confirm that if any loose parts were left in the steam generators, an evaluation was performed and that it confirmed the acceptability of leaving the parts in service.

Please review and let me know if you'd like to have a telecon to clarify this request. An email response to these questions would be satisfactory.

Regards, Tom Wengert Project Manager - Prairie Island USNRC NRR/DORL/LPLIII-1 (301) 415-4037 E-mail Properties Mail Envelope Properties (D5190B2E012E574E980AE3ECCE0576D30BA3875D83)

Subject:

RE: Prairie Island - Review of 2008 Unit 2 180-Day SG Tube Inspection

Report Sent Date: 9/1/2009 2:41:49 PM Received Date: 9/1/2009 2:41:49 PM From: Vincent, Dale M.

Created By: Dale.Vincent@xenuclear.com Recipients:

Thomas.Wengert@nrc.gov (Wengert, Thomas)

Tracking Status: None Post Office:

enex04 Files Size Date & Time MESSAGE 48819 9/1/2009 RAI responses 2008 Unit 2 Steam Generator Tube Inspection Report.doc 34276 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: