ML100040199
| ML100040199 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 01/04/2010 |
| From: | Office of Nuclear Reactor Regulation |
| To: | Division of License Renewal |
| References | |
| Download: ML100040199 (3) | |
Text
1 IPRenewal NPEmails From:
Stuyvenberg, Andrew Sent:
Monday, January 04, 2010 11:34 AM To:
STROUD, MICHAEL D Cc:
Gray, Dara F; YOUNG, GARRY G; IPRenewal NPEmails
Subject:
RE: IPEC SAMA Letter Mike - The informational item we'd like to discuss is below. I'll arrange for a teleconference at 9a on Thursday (1/7) and will send you the access code as soon as I have it. Bob Palla and I will be the NRC staff on the call.
As described in Section 6 of the December 11, 2009 Entergy letter, several of the candidate SAMAs were subjected to more comprehensive and precise cost estimating techniques to determine whether they are potentially cost-beneficial given the revised SAMA benefit estimates. For several of these SAMAs, the revised (increased) cost estimate resulted in the SAMA becoming non-cost-beneficial (i.e., the SAMA would be cost-beneficial based on the cost estimate reported in the ER, but not cost-beneficial based on the revised cost estimate.) These SAMAs are IP2 SAMA 17 and 40, and IP3 SAMA 17, 20, 40, and 50. For each of these SAMAs describe the basis for the revised cost estimate and provide a breakdown of the cost estimate in terms of the major cost factors (e.g., using a breakdown similar to that used in Entergys response to SAMA RAI 5l).
Please let me know whether you have any questions, and I'll be in touch.
- Best, Drew From: STROUD, MICHAEL D [1]
Sent: Monday, January 04, 2010 8:01 AM To: Stuyvenberg, Andrew Cc: Gray, Dara F; YOUNG, GARRY G
Subject:
- Drew, When you get the list of SAMA items that your team wants to look at during the site visit, please send the list to both Dara Gray and to me.
Thanks Mike Stroud From: Stuyvenberg, Andrew [2]
Sent: Thursday, December 31, 2009 1:26 PM To: STROUD, MICHAEL D Cc: Green, Kimberly; COX, ALAN B; YOUNG, GARRY G; IPRenewal NPEmails
Subject:
RE: IPEC SAMA Letter Mike - Thanks for the note. Kim has spoken with me regarding the telephone call, and I had been in contact with Dara regarding a site visit.
At this point, we would like to plan a conference call for next Thursday if your team is available. We're flexible on the timing of the call, but would suggest either mid-morning (any time between 9a and 11:30a) or early
2 afternoon (any time between 1p and 3p). I'd estimate that we'd need about one hour for the call, though it may take less time.
Regarding a site visit, I would like to request that we do so during the week of 1/18. I had indicated to Dara that we would be on site for no more than one full day. If it works for you all, I would suggest that Wednesday, 1/20, might be a good fit for our team. I will work up a list of items our SAMA team would like to see on site, but I believe it will be very straightforward. I can have something to you (or Dara, if you would prefer) by early next week.
I look forward to being in touch.
Best regards, and happy New Year, Drew From: STROUD, MICHAEL D [3]
Sent: Thursday, December 31, 2009 1:16 PM To: Stuyvenberg, Andrew Cc: Green, Kimberly; COX, ALAN B; YOUNG, GARRY G
Subject:
- Drew, I talked to Kim Green this week and she has told us that Bob Palla has some questions about the revised SAMA letter that we sent in December. Please let me know when you want to have a phone call. Kim also said something about having a site visit. Please let me know what you want to do so that I can get the site ready if you want to have a visit. I will be on vacation until January 4th, but I can get your e-mail anytime.
Thanks Mike Stroud
Hearing Identifier:
IndianPointUnits2and3NonPublic_EX Email Number:
1914 Mail Envelope Properties (AF843158D8D87443918BD3AA953ABF780A4036614B)
Subject:
RE: IPEC SAMA Letter Sent Date:
1/4/2010 11:34:23 AM Received Date:
1/4/2010 11:34:24 AM From:
Stuyvenberg, Andrew Created By:
Andrew.Stuyvenberg@nrc.gov Recipients:
"Gray, Dara F" <DGray@entergy.com>
Tracking Status: None "YOUNG, GARRY G" <GYOUNG4@entergy.com>
Tracking Status: None "IPRenewal NPEmails" <IPRenewal.NPEmails@nrc.gov>
Tracking Status: None "STROUD, MICHAEL D" <MSTROUD@entergy.com>
Tracking Status: None Post Office:
HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 3637 1/4/2010 11:34:24 AM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: