ML093620601

From kanterella
Jump to navigation Jump to search
Forwards LER 79-003/03L-0 & LER 79-004/03L-0
Date released: 10/10/2019 Download: ML093620601


LER 79-004/03L-0 on 790126:during Normal Operation,Process Radiation Monitors R-11 & R-12 Became Inoperable Due to Seized Sample Pump.Caused by Seizure of Conde Dry Air Pump, Model 6SFCW,for Process Radiation Monitors R-11 & R-12
ML19269D146
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 02/16/1979
From: Makepeace J
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19269D146 (1)
LER 79-003/03L-0 on 790120:during Normal Operation,Signal from One of Two Low Level Alarm Devices for Refueling Water Tank Became Erratic,Making Alarm Inoperable.Caused by Freezing of Sensing Line for Level Instrument Controller
ML093620602
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 02/16/1979
From: Makepeace J
Consolidated Edison Co of New York
To:
NRC/OE, NRC/OI/RGN-I/FO
References
Download: ML093620602 (1)
Forwards LER 79-003/03L-0 & LER 79-004/03L-0
ML093620600
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 02/16/1979
From: William Cahill
Consolidated Edison Co of New York
To: Grier B H
NRC/OE, NRC/OI/RGN-I/FO
References
Download: ML093620600 (1)