1211612009 U.S. Nuclear Regulatory Commission Operations Center Event Report PagelI General Information or Other (PAR) Event# 45574 Rep Org: HYDROAIRE Notification Date / Time: 12/16/2009 17:11 (EST)

Supplier: HYDROAIRE Event Date / Time: 09/29/2009 09:02 (CST)

Last Modification: 12/16/2009 Region: 3 Docket #:

City: CHICAGO Agreement State: Yes County: License #:

State: IL NRC Notified by: SESHA GIRl Notifications: TAMARA BLOOMER R3DO HQ Ops Officer: VINCE KLCO PART 21 COORDINATOR NRR Emergency Class: NON EMERGENCY RICHARD BARKLEY R1DO 10 CFR Section:

21.21 UNSPECIFIED PARAGRAPH PART 21 INVOLVING A PUMP SHAFT COUPLING FAILURE A service water pump failed during operation on 9/29/2009. Upon disassembly it was detected that a shaft coupling installed on a repaired service water pump failed while in service. The failed coupling was replaced with a new coupling of a different heat code. According to the manufacturer, the threaded coupling design was only supplied for Palisades.

,ový t"-Iq

Miscellaneous Info: Event# 45574 Hydroaire POC: Sesha Girl; QA Manager: (312) 738-3000 Attached Entergy corrective action documents (LO-CAR-2009-00103) reference plant locations: PLP and IPEC thus Regions 3 and 1 were placed on distribution.

Hoc HOO HOO Hoc From: Helen Starling [hstarling@hydro-aire.com] on behalf of Sesha Giri [sgiri@hydro-aire.com]

Sent: Wednesday, December 16, 2009 5:11 PM To: HOO Hoc

Subject:

Part 21 Notification Attachments: NDR No. QANC-09 97.pdf; CAR 09-04.pdf; Part 21 Notification Letter.pdf; CAR LO-CAR-2009-00103 - signed by HydroAire.pdf

Dear Sir or Madam,

Please find attached HydroAire's Part 21 Notification letter and other related documents.

Regards, Sesha Giri QA Manager HydroAire Services, Inc.

(312) 738-3000 I

0 HydruAire NONCONFORMANCE & DISCREPANCY REPORT NDR No.: QANC- 09 97 Date: 12/15/09 Nonconformance Code:

Inspection Point D Incoming - In-Process [ Other Section A. Item Identification

1. Part Name/Description: Pump Coupling
2. Job No.: NQ5832 3. Work Order No.: NA 4. Part No. NA
5. Heat No.: NA 6. PO No.: 10237148 7. Other:

Section B. Condition Description

1. Specification: 2. Deficiency

Description:

PCP 041 Rev 02. Para 5.1 Failed to report NRC as required by 10 CFR Part 21 and HydroAire PCP 041 requirements.

3. Attachments:.
4. Originator: Adam Jung *W--&-, s-C"* Date: 12/15/09 Section C. Disposition
1. Recommended Disposition 2. Actual Disposition 3. Approvals FD1 Scrap (Return to Vendor) 1 Scrap (Return to Vendor) Operations: Date: ______

-- ] Rework [D Rework Contract Admin: N R. Date:

D Accept-As-Is ] Accept-As-Is D-] Repair -- Repair Engineering: ýý& - Date: 1 L%60-9 E Other (define) [E Other (define) QA: LL,.- L .,-J Date:

4. Technical Justification (use for "Accept-As-Is". "Repair" or "Other")

HydroAire made the assumption that Palisades would invoke part 21 under their QA program following USNRC guideline Section 21.2, Para (c) .This assumption was further supported by the corrective action request LO-CAR-2009-00103 initiated by Entergy dated 10/05/09, which was addressing the failure of P-7C service water pumps at Palisades.

Enciineerina: 1"IX ý k k. 0 Date: ,.,i*i t 'D a Section D. Cause and Corrective Action Inaccurate assumptions based on improper and Internal meeting will be conducted to educate all inadequate understanding of IOCFR part 21 by HydroAire concerned personnel on PCP 041. A Training record will be personnel. documented.

By: W Date:

By: CýAL4 La Date: Ia-l5-o0! QA: 3h2 =z = Date:

Section E. Customer Acceptance (Required)

Customer Acceptance: .I By: Date:

Section F. Verification

1. Disposition Verified By: 2. Corrective Action Verified By:

QC: Date: QA: Date:

AM -S.C QAM S.G.

1 of 1 CAR NO# 09-04 0 HydroA ire CORRECTIVE ACTION REQUEST DATE: 09/30/09 ISSUED TO: Palisades, Entergy RESPONSE REQUIRED BY: to be determined VENDOR: E3 I INTERNAL AUDIT FINDING PART: DOCUMENTATION:

P0 NO# 10237148 NCR NO# None OTHERS: Job # NQ 5832

1. A) DESCRIPTION OF NONCONFORMANCE; Palisades informed HydroAire via telephone conversation that a service water pump serial No P-7C failed during operation causing" loss of service water". Upon disassembly it was detected a coupling (2nd from the top) fractured and caused this failure.

B) RECOMMENDATION; Perform needed evaluations to find the cause for this failure of the coupling and determine the root cause. Notify appropriate individuals/groups of the findings and recommendations coming out of the root cause study.

Form a review team to determine and analyze the root cause. Update this Corrective action report upon completion.

INITIATED BY: Nick Dagres , Operations Manager - DATE: 09130109

2. CAUSE OF NONCONFORMANCE; Root cause analysis will determine the cause for non conformance/failure.
3. CORRECTIVE ACTION TO BRING BACK TO CONFORMANCE; To be determined after completion of root cause analysis.
4. CORRECTIVE ACTION TO PREVENT RECURRENCE; To be determined after review of root cause analysis.

SIGNATURE/TITLE: Dibu. Chowdhur ,Des'ign Engineer DATE: 09/30/09

5. REVIEW/COMMENTS OF INITIATOR:

Part 21 Report ability:

None required at this time. Internal record search indicates, threaded coupling design was only manufactured for Palisades only. In other words, HydroAire never supplied threaded coupling to any other nuclear utility other than Palisades.

HydroAire assumes that Palisades will invoke part 21 under their QA program following USNRC guideline Section 21.2, Para 4 (c).

SIGNATURE/TITLE: Sesha. Girl, QA Manager 4J - 'Y/(r DATE: 09/30/09

6. QA REVIEW:

CORRECTIVE ACTION VERIFIED AND ACCEPTED D NOT ACCEPTED D COMMENTS(IF ANY): COMMENTS:

SIGNATURE DATE:

SIGNATURE: DATE:

Follow-up Performed YesL Date: Closed li Date:

~HydroAllre ii' Se e i ace Incorporated 834 West Madison, Chicago, Illinois 60607-2698 (312) 738-3000 Fax No.: (312) 738-3226 December 16, 2009 U.S. Nuclear Regulatory Cornmission Document Control Desk Washington, DC 20555-0001

Subject:

Part 21 Notification

Dear Sir or Madam,

Palisades of Entergy on 9/29/09 reported to us the failure of a pump in their service water system. This notification, although it is late, is to conform to the requirements of 10 CFR Part 21 and our PCP 041 Rev..2. Attached are the details of the failure as reported in Entergy Corrective Action Request LO&CAR-2009-00103.

Regards, Seshý Girl Quality Assurance Manager HydroAire Services, Inc.

Cc: George Harris

CEX02009-00257 Attachment A Corrective Action Request LO-CAR-2009-00103

Entergy Corrective Action Request Issued To: HydroAire Inc Number: LO-CAR-2009-00103 834 West Madison Chicago, IL 60607 Response Date: 30 days upon receipt of the CAR issuance letter Person Contacted: Mr. Sesha Gin Audit/Surveillance No N/A Quality Assurance Manager Requirements:

PLP PO 10237148 Revision 002 The supplier shall conduct factory tests and inspections necessary to determine that the workmanship and materials are free from defects and that the design and construction are such that the item fumished will perform as required by this and referenced documents.

Nonconformance:

Contrary to the above requirement, shaft coupling installed on repaired service water pump failed while in service.

Reference:

CR-PLP-2009- 04519 HydroAire to determine cause, extent, resolution and potential Part 21 reportability.

Cause, extent, and resolution are in progress. Part 21 Reportability is evaluated and is isolated to Palisades Nuclear Plant only EVALUATIONS:

Is an evaluation of the nonconformance for reportability per 10CFR21 required?

YesE] No[N Further Investigation Required 0 by HydroAire Evaluator's Initials: HGR Date 10/05/09 Plant(s) Locations: PLP, IPEC Does the finding have.potential for impact on past, current or future Services or Hardware for:

[I ANO [L GGNS EM RB 0l W-3 0l Pilgrim Z Palisades Z IP2 2 IP3 Ml Fitzpatrick El VTY El Big Rock Point Yes"- No[D Comments: Failed coupling replaced with new coupling of a different heat code.

Initiator Date Super4 Supplier,4W Date (9) Cause of Nonconformance:

Cause is still to be determined and root cause analysis is underway.

Anticipated completion is thirty days from this response.

EN-QV-1 19 Rev. 6 Page 1 of 3

Entergy Corrective Action Request (10) Corrective Action Taken:

Dependent upon findings of root cause analysis, yet to come.

(11) 11-04-09 (12)

Date Completed or Respoooding Signature Date Scheduled Completion Date (13) Method of Verification: --,. (-

V.P. Administration 11-04-09 (14) (15)

Verified/Closed Date Closure Review Date EN-QV- 119 Rev. 6 Page 2 of 3

Entergy Corrective Action Request SUPPLIER INSTRUCTIONS FOR COMPLETING CAR FORM NOTES

9) Cause of Nonconformance Clearly state the root cause of the nonconformance for findings issued,
10) Corrective Action Taken Indicate action taken or planned to correct and prevent recurrence of nonconformance and/or area for improvement.
11) Date Completed or Indicate date action described above was completed Scheduled Completion Date or is scheduled to be completed.
12) Responding Signature/Date Member of management responsible for response signs and dates.

When the corrective action cannot be completed by the date requested, submit a report describing the action to be taken and projected completion date.

Submit a follow-up report describing the action taken, the date action was completed, and objective evidence to document corrective action has been accomplished and implemented.

EN-QV-119 Rev.6 Page 3 of 3

Entergy CONDITION REPORT CR-PLP-2009-045S19 Originator: Shaffer.Geri G Originator Phone:

Originator Group: Operations Shift Staff PLP Operability Required: Y Reportability Required: Y Supervisor Name: Kane,Michael J Discovered Date: 09/29/2009 09:02 Initiated Date: 09/29/2009 09:28 Condition

Description:

Received alarm EK- 1149, SERVICE WATER PUMPS STANDBY PUMP RUNNING, EK- 1163, CRITICAL SERV WATER HEADER 'B' LO PRESSURE, EK-] 164, CRITICAL SERV WATER HEADER 'A' LO PRESSURE, and EK-l 165, NONCRITICAL SERVICE WATER LOW PRESSURE, unexpectedly. Service Water P-7B started in Standby.

Service Water Pump P-7C was operating xith 3 lamps (normally greater than 80) and local indication of duress (shaft visibly vibrating with no discharge pressure). Secured P-7C. At the beginning of shift. Service Water Pumps P-7A and P-7C were in service with basket strainer DP's at 6 PSID and 5 PSID. Cycled through all the Service Water Pumps leaving P-7A & P-7C I/S. Final Basket Strainer DP's are: P-7A @ 4 PSID. P-7B @ 3.5 PSID. P-7C @ 3.5 PSID. Service Water Header Pressure rose 2.3 PSI. Entered ONP-6. l, "Loss of Service Water" and Technical Specification LCO 3.7.9 (72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />). There is no Emergency Plan impact and the event is not reportable.

Immediate Action

Description:

Secured Service Water Pump P-7C and entered ONP-6. 1, "Loss of Service Water" Initiated WR# 00176906.

Suggested Action

Description:

EQUIPMENT:

Tae Name Taa Suffix Name, omponent Code Process System Code P-7C K"CHM/SRj'MR PUNMP CSW REFERENCE ITEMS:

Tvpe Code Description CR CR-PLP-2009-04542 WR 00176906 TRENDING (For Reference Purposes Only):

Trend Type Trend Code HEP FACTOR E INPO BINNING ER2, REPORT WET. GIHT 4 KEYWORDS KW-SERVICE WATER KEYWORDS KW-PUMP SHAFT KEYWORDS KW-TECHNICAL SPECIFICATION EE ESSE KEYWORDS KW-ANNUJNCIATOR