UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
475 ALLENDALE ROAD
KING OF PRUSSIA, PA 19406-1415
December 18, 2009
Mr. John T. Carlin
Site Vice President, R.E. Ginna Nuclear Power Plant
R.E. Ginna Nuclear Power Plant, LLC
1503 Lake Road
Ontario, NY 14519
SUBJECT:
RESPONSE TO NOTICE OF VIOLATION EA-09-249 AND NRC INSPECTION
REPORT 05000244/2009008
Dear Mr. Carlin:
Thank you for your letter of December 9,2009, in response to our November 12, 2009, letter
and Notice of Violation concerning activities associated with a failure to preclude reoccurrence
of a significant condition adverse to quality associated with the turbine driven auxiliary feedwater
pump governor control valve, that led to a failure of the TDAFW pump to operate on
July 2, 2009. We have reviewed your reply and find it responsive to the concerns raised in our
Notice of Violation. We will review the implementation of your corrective actions during a future
inspection to determine that full compliance has been achieved and will be maintained.
LfLu
Glenn T. Dentel, Chief
Projects Branch 1
Division of Reactor Projects
Docket No. 50-244
License No. DPR-18
cc:
Distribution via ListServ
December 16, 2009
Mr. John T. Carlin
Site Vice President, R.E. Ginna Nuclear Power Plant
R.E. Ginna Nuclear Power Plant, LLC
1503 Lake Road
Ontario, NY 14519
SUBJECT:
RESPONSE TO NOTICE OF VIOLATION EA-09-249 AND NRC INSPECTION
REPORT 05000244/2009006
Dear Mr. Carlin:
Thank you for your letter of December 9,2009, in response to our November 12, 2009, letter
and Notice of Violation concerning activities associated with a failure to preclude reoccurrence
of a significant condition adverse to quality associated with the turbine driven auxiliary feedwater
pump governor control valve, that led to a failure of the TDAFW pump to operate on
July 2. 2009. We have reviewed your reply and find it responsive to the concerns raised in our
Notice of Violation. We will review the implementation of your corrective actions during a future
inspection to determine that full compliance has been achieved and will be maintained.
Docket No. 50-244
License No. DPR-18
cc:
Distribution via ListServ
Distribution 'IN/encl:
(via E-mail)
S. Collins. RA
M. Dapas. ORA
D. Lew, DRP
J. Clifford, DRP
(R10RAMAIL RESOURCE)
(R10RAMAIL RESOURCE)
(R1DRPMAIL RESOURCE)
(R1DRPMAIL RESOURCE)
L. Trocine. RI OEDO
G. Dentel, DRP
N. Perry, DRP
SUNSI Review Complete:
JRH
Sincerely,
IRAJ
Glenn T. Dentel, Chief
Projects Branch 1
Division of Reactor Projects
J. Hawkins, DRP
S. Sloan, DRP
L. Casey, DRP, RI
M. Rose. DRP. OA
RidsNrrPMREGinna Resource
. RidsNrrDorlLpl1-1 Resource
ROPreportsResQurce@nrc.gov
(Reviewer's Initials)
DOCUMENT NAME: G:\\DRP\\BRANCH1\\Ginna\\Ginna NOV Response Ltr 2009008.doc
After declaring this document "An Official Agency Record" it will/will not be released to the Public.
i
f hi d
. d'
I
h
Ole'
h
~E" :: C
To reee ve a copy 0 t S DCument, In Icate n t e box:
' = Copy without attac menVendosure
opy with attachment/enclosure "N" = No COpy
OFFICE
RI/DRP
I
RIIDRP
I
I
I
I
NAME
JHawkins/JRH
GDentellGTD
DATE
12/17/09
12/17/09