ML093441142
| ML093441142 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 09/04/1991 |
| From: | Bell D Power Authority of the State of New York |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML093441143 | List: |
| References | |
| NUDOCS 9109180043 | |
| Download: ML093441142 (2) | |
Text
Indian Point 3 Nuclear Power Plant P.O, Box 215 Buchanan. New York 10511 (914) 736-8000 AP-18.2 REV. 5 FORM IP3 R&DCC-09 ATTACHMENT 6 OWNewYorkPower Authority CONTROLLED DOCUMENT TRANSMITTAL FORM TO:
DISTRIBUTION DATE: 04-SEP-91 TRANSMITTAL NO. 1246 FROM:
IP3 DOCUMENT CONTROL CENTER EXTENSION 8037 The Document(s) identified below are forwarded for use. Please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded or voided document, sign and return the receipt acknowledgement below within (15) days to the IP3 Document Control Center.
AFFECTED DOCUMENT: EMERGENCY PLAN DOC #
REV.
TITLE INSTRUCTIONS VOL. I EMERGENCY PLAN PLEASE FOLLOW INSTRUCTIONS AS FOLLOWS ON COVER SHEET VOL.II EMERGENCY RESPONSE OF DISTRIBUTON.
ACTIVATION THANK-YOU VOL.III EMERGENCY PLAN IMPLEMENTING PROCEDURES RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED AND, I CERTIFY THAT ALL SUPERSEDED OR VOIDED COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE OR MARKED VOID.
SIGNATURE DATE CONTROL COPY #
9109180043 910904 PR DIo5000286 F.
Indian Point 3 Nuclear Power Plantp P.O. Box 215 Buchanan, New York 10511 914-736-800C SNew York Power SAuthority EMERGENCY PLANNING CONTROL COPY NO.:
DATE:
9
SUBJECT:
DISTRIBUTION OF THE INDIAN POINT #3 EMERGENCY PLAN REVISIONS The enclosed revisions are for your controlled copy of the IP-3 Emergency Plan.
Please discard old sheets, insert new sheets, initial/date this transmittal, and return it to the IP-3 Documents Department.
If you have any questions regarding these changes, call Emergency Planning (x8404/x8405). Thank you.
VOLUME I EMERGENCY PLAN Please change out the whole volume. The new volume is Rev. 39.
VOLUME II EMERGENCY RESPONSE ACTIVATION OLD:
NEW:
Cover Sheet / Contents Organization Section (3 Pgs)
Initiating Conditions Rev. 38 Rev. 28 Rev. 29 Cover Sheet / Contents Organization Section (3 Pgs)
Initiating Conditions VOLUME III - EMERGENCY PLAN IMPLEMENTING PROCEDURES OLD:
NEW:
Volume III Index (Rev. #63)
IP-1021 (all)
IP-1028 Att. 4B only IP-1070 Att. 4.2 only (9 pages)
IP-1076 Att. 6.3 only (06/91)
Rev. 18 03/91 06/91 06/91 Volume III Index (Rev. #64)
IP-1021 (all)
IP-1028 Att. 4B only IP-1070 Att. 4.2 only (9 pages)
IP-1076 Att. 6.3 only (08/91)
Rev. 19 08/91 08/91 08/91 I acknowledge the receipt of these revisions to the IP-3 Emergency Plan:
(Signture)(Date FROM:
Rev. 39 Rev. 29 Rev. 30 AZE (Signature)
(Date)