John Carlin Site Vice President R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, New York 14519-9364 585.771.5200 585.771.3943 Fax John.Carlin@constellation.com CENG a, joint venture of Coinstellatkm e
VpEnergy December 3, 2009 U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION:
SUBJECT:
Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards R.E. Ginna Nuclear Power Plant Docket No. 72-67 Report of Compliance with NRC Order EA-09-119 (1) Letter to John Carlin (Ginna LLC) from Marc Dapas (NRC),
Subject:
Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for R.E. Ginna Nuclear Power Plant Independent Spent Fuel Storage Installation, dated June 3, 2009
REFERENCE:
(2) Letter to USNRC Document Control Desk, Director, Division of Spent Fuel Storage and Transportation, Office of Nuclear Material Safety and Safeguards, from John Carlin (Ginna LLC),
Subject:
Response to Sections III.B and III.C of NRC Order EA-09-119, dated June 19, 2009 (3) Letter to USNRC Secretary, Office of the Secretary of the Commission from John Carlin (Ginna LLC),
Subject:
Answers to Section IV of NRC Order EA-09-119, Dated June 19, 2009 On June 3, 2009, the NRC issued Order EA-09-119 (Order) to R.E. Ginna Nuclear Power Plant, LLC (Ginna LLC) regarding additional security requirements for the Ginna Independent Spent Fuel Storage Installation (ISFSI). The Order (Reference 1) imposes requirements to be completed within 180 days from the issuance of the Order. Ginna LLC consented to the Order and agreed to implement the requirements in Reference 2 and Reference 3.
Document Control Desk December 3, 2009 Page 2 Reference 1,Section III.C.2, further requires that "Ginna LLC shall report to the Commission when it has achieved full compliance with the requirements described in Attachments 1 and 2."
Ginna LLC achieved full compliance with these requirements on November 25, 2009.
Should you have questions regarding this matter, please contact Mr. Thomas Harding at 585.771.5219, or Thomas.HardingJrcengllc.com.
4 V e ry tru l
- y
( 'rs John4.rli~n cc:
S.J. Collins, NRC D.V. Pickett, NRC Resident Inspector, NRC (Ginna)
P.D. Eddy, NYSDPS A.L. Peterson, NYSERDA R.E. Ginna Nuclear Power Plant, LLC