UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 December 7, 2009 Mr. Mano Nazar Senior Vice President and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - TURKEY POINT NUCLEAR PLANT

Dear Mr. Nazar:

In a telephone conversation on December 7, 2009, Mr. Phillip G. Capehart, NRC Operations Engineer, and Mr. Guy Levy, Operations Training, made arrangements for the NRC to inspect the licensed operator requalification program at the Turkey Point Nuclear Plant. The inspection is planned for the week of January 25, 2010, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that your simulator is committed to ANSI/ANS-3.5-1998, American National Standard for Nuclear Power Plant Simulators for use in Operator Training and Examination.

In accordance with 10 CFR 55.59, the NRC has requested that you submit (by January 18, 2010, make ready upon arrival), the material as specified in the Enclosure, in order to support the NRC's inspection program needs. Mr. Levy has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018).

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.

FPL 2

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Phil Capehart at (404) 562-4483 or me at (404) 562-4550.

Sincerely,

/RA/

Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41

Enclosure:

Materials Request List cc w/encl: (See Page 3)

X SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRP SIGNATURE

/RA/

/RA/

/RA/Shaeffer for/

NAME PCapehart MWidmann MSykes DATE 12/7/2009 12/07/09 12/07/09 12/ /2009 12/ /2009 12/ /2009 12/ /2009 E-MAIL COPY?

YES NO YES YES NO YES NO YES NO YES NO

FPL 3

cc w/encl:

Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution McHenry Cornell Director Licensing and Performance Improvement Florida Power & Light Company Electronic Mail Distribution Michael Kiley Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Niel Batista Emergency Management Coordinator Department of Emergency Management and Homeland Security Electronic Mail Distribution Paul Rubin (Acting) Plant General Manager Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Abdy Khanpour Vice President Engineering Support Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mark E. Warner Vice President, Nuclear Operations South Region Florida Power & Light Company Electronic Mail Distribution Mitch S. Ross Vice President and Associate General Counsel Florida Power & Light Company Electronic Mail Distribution Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Ruben D. Almaguer Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution Neil Constance Training Manager Turkey Point Nuclear Plant Electronic Mail Distribution (Vacant)

Vice President Nuclear Plant Support Florida Power & Light Company Electronic Mail Distribution Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL 32399-1050 Mike A. Shehadeh, P.E.

City Manager City of Homestead Electronic Mail Distribution County Manager of Miami-Dade County 111 NW 1st Street, 29th Floor Miami, FL 33128 Rajiv S. Kundalkar Vice President - Fleet Organizational Support Florida Power & Light Company Electronic Mail Distribution

Enclosure Materials Request List The items listed below are being requested per telephone conversation on December 7, 2009, to support the upcoming IP-71111.11B inspection in January 2010 at Turkey Point. Items in paragraph "A" are to be sent prior to the inspection. They must be received in our office by January 18, 2010. Please have the items listed in paragraph "B" ready for our review upon arrival on January 25, 2010.

A.

In-office inspection material:

1.

Complete list of all licensed individuals (active and inactive; RO and SRO), including license restrictions

2.

Copy of an Organizational Chart for the training department including the simulator group

3.

Copy of the weekly schedules for the weeks that the 2009 annual operating exams will be administered, including a list of personnel scheduled for testing the week of January 25, 2010

4.

A copy of the written exams (all weeks) that were administered for the last biennial requal exam, including all biennial re-take exams

5.

Copies of the simulator scenarios and JPMs (simulator and in-plant) that have already been administered and that will be administered the week of January 19, 2010 (exam security related item)

6.

Self assessment reports, Condition Reports, and LERs resulting from human performance errors since the last requal inspection

7.

A copy of the governing site procedure(s) for the conduct of license operator requalification training (classroom and simulator) and exam development/administration

8.

A copy of the governing site procedure(s) for the simulator fidelity which includes all the testing requirements used to fulfill ANSI/ANSB3.5-1998 requirements B.

On-site inspection material:

1.

Requal training attendance records for the current two year requal training cycle

2.

Exam results since last requal inspection (weekly operating & written exams), copies of exams that had pass/failure rates significantly outside the average

3.

Simulator scenarios and JPMs (in-plant and simulator) that have been or will be administered for this requal exam (exam security related item)

4.

All training feedback forms since the last requal inspection

5.

All remedial training packages since the last requal inspection

2 Enclosure

6.

A list of all personnel that reactivated their licenses since the last requal inspection

7.

Security badge and HP printouts for all personnel that reactivated their licenses since the last requal inspection (Records shall support verification of time on shift under instruction and complete plant tours for both the reactivating operator and the supervising active license for the time on shift as well as the plant tour.)

8.

Records for maintenance of active licenses - time on shift 56/60 hrs/qtr since the last requal inspection

9.

All medical exam records

10.

Copies of the reference list for all administrative procedures which direct the training process, including development of training and test materials, remedial training, modifications, plant and industry experience

11.

Simulator:

List of all open simulator discrepancies (DR=s)

Copy of the Simulator Management and Configuration Procedures List of all closed simulator DR=s for last 12 months List of Simulator Performance tests Simulator Testing Documentation

12.

Security procedures for the simulator

13.

Program evaluation for the previous 2 years training cycle