UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 October 30, 2009 Mr. Gene St. Pierre Vice President, North Region Seabrook Nuclear Power Plant NextEra Energy Seabrook, LLC c/o Mr. Michael O'Keefe P.O. Box 300 Seabrook, NH 03874

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - SEABROOK NUCLEAR POWER PLANT

Dear Mr. St. Pierre:

In a telephone conversation on October 1, 2009, Mr. D. Silk, Senior Operations Engineer, and Mr. M. Leone of your training staff, made arrangements for the U. S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Seabrook Nuclear Power Plant facility. The inspection is planned for the week of December 14, 2009, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations and operating test scheduled for the week of the inspection to the NRC by November 23,2009. Mr.

M. Leone has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2009.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIAlPrivacy Services Branch (T-5 F52), U.S.

Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C.

20503.

G. St. Pierre 2

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.govlreading-rm/adams.html (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. D. Silk at (610) 337-5372.

Sincerely, IRAJ Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No.

50-443 License No.

NPF-86 cc: Distribution via ListServ

G. St. Pierre 2

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.govireading-rm/adams.html (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. D. Silk at (610) 337-5372.

Sincerely, IRAJ Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No.

50-443 License No.

NPF-86 cc: Distribution via ListServ SUNSI Review Complete:

OS (Reviewer's Initials)

ADAMS PKG: ML093000365 ADAMS ACCESSION NO. 093060297 DOCUMENT NAME: G:\\DRS\\Operations Branch\\SILK\\Requal FY10-SB Dec09\\Seabrook200960dayrpLdoc After declaring this document "An Official Agency Record" it will be released to the Public.

To receive a COpy of this document, indicate in the box: "C" = COpy without attachmenUenclosure "En = COpy with attachmenUenciosure "N" =No COpy OFFICE RIIDRS RIIDRS RIIDRS I

I I

I I

NAME CBixler/CB DSilklDS SHanseil/SH DATE 10/28/09 10/28/09 10/30/09

';FFICE I

I I

I NAME DATE OFFICIAL RECORD COPY

3 G. St. Pierre Distribution w/encl: (via E-mail)

S. Collins, RA (R10RAMaii Resource)

M. Dapas, DRA (R10RAMaii Resource)

D. Lew, DRP (R1DRPMaii Resource)

J. Clifford, DRP (R1 DRPMaii Resource)

A. Burritt, DRP L. Cline, DRP A. Turilin, DRP W. Raymond, DRP, SRI J. Johnson, DRP, RI E. Jacobs, DRP, OA L. Trocine, RI OEDO RidsNrrPMSeabrook Resource RidsNrrDorlLpl1-2 Resource D. Silk, DRS Examiner, DRS L. Vick, NRRlADRO/DIRS/IOLB S. Hansell, DRS D. Roberts, DRS (R1 DRSMaii Resource)

P. Wilson, DRS (R1DRSMaii Resource)

Distribution:

C. Bixler, DRS (OL Facitity File)