Request for Additional Information from Instrumentation and Control Branch Auxiliary Feedwater
ML093060166
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/02/2009
From: Justin Poole
Plant Licensing Branch III
To: Jim Costedio, Hale S
Florida Power & Light Energy Point Beach
Poole Justin/DORL/LPL3-1/ 301-415-2048
References
Download: ML093060166 (1)


Text

From:

Poole, Justin Sent:

Monday, November 02, 2009 10:33 AM To:

'Hale, Steve'; COSTEDIO, JAMES

Subject:

Point Beach Nuclear Plant, Units 1 and 2 - Request for Additional Information from Instrumentation and Control Branch RE: Auxiliary Feedwater

Steve, By letter to the U.S. Nuclear Regulatory Commission (NRC) dated April 7, 2009, as supplemented by two letters dated June 17, 2009, and September 25, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML091250564, ML091690087, ML091690090, and ML092750395, respectively), FPL Energy Point Beach, LLC, submitted a request to change technical specifications due to modifications to the auxiliary feedwater system (AFW). This was originally part of the extended power uprate request but was separated out by the NRC staff.

The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed below.

During a discussion with your staff on October 28, 2009, it was agreed that you would provide the additional information within 30 days of the date of this letter.

The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC=s goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-2048.

Sincerely, Justin C. Poole Project Manager NRR/DORL/LPL3-1 U.S. Nuclear Regulatory Commission (301)415-2048 email: Justin.Poole@nrc.gov

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

1. Please provide the complete calculation used to obtain the LSSS value of the new Function 6.e, Auxiliary Feedwater, AFW Pump Suction Transfer on Suction Pressure Low.