UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 October 22, 2009 Mr. Preston D. Swafford Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
BROWNS FERRY NUCLEAR PLANT - OFFICE OF INVESTIGATIONS CASE NUMBER 2-2009-017
Dear Mr. Swafford:
Enclosed for your information is the synopsis of the Nuclear Regulatory Commission (NRC)
Office of Investigations= (OI) completed report regarding whether a nuclear maintenance supervisor employed by the TVA willfully signed the RCIC procedure related to the over-speed test without verifying that the procedure had been completed, thus submitting incomplete and inaccurate information material to the NRC.
OI did not substantiate that a nuclear maintenance supervisor employed by the TVA willfully signed the RCIC procedure related to the over-speed test without verifying that the procedure had been completed, thus submitting incomplete and inaccurate information material to the NRC.
Accordingly, enforcement action is not warranted, and we plan no further actions with regard to this matter. Should you have any questions concerning this letter, please contact us.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Eugene F. Guthrie, Chief Reactor Projects Branch 6 Division of Reactor Projects
Enclosure:
Investigative Synopsis, OI Case No. 2-2009-017
X SUNSI REVIEW COMPLETE EFG OFFICE RII:DRP RII:DRP RII:EICS RII:DRP SIGNATURE WXD /RA/
ODM /RA/
EFG /RA/
NAME WDeschaine PHiggins ODeMiranda EGuthrie DATE 10/19/2009 10/21/2009 10/23/2009 E-MAIL COPY?
YES NO YES NO YES NO YES NO
Official Use Only - OI Investigation Information NOT FOR PUBLIC DISCLOSURE WITHOUT APPROVAL OF FIELD OFFICE DIRECTOR, OFFICE OF INVESTIGATIONS, REGION II Official Use Only - OI Investigation Information Case No. 2-2009-017 1
Enclosure SYNOPSIS This investigation was initiated by the U.S. Nuclear Regulatory Commission (NRC), Office of Investigations (OI), Region II (RII), on March 2, 2009, to determine whether a nuclear maintenance supervisor employed by the Tennessee Valley Authority (TVA) willfully signed the Reactor Core Isolation Cooling (RCIC) procedure related to the "over-speed test" without verifying that the procedure had been completed, thus submitting incomplete and inaccurate information material to the NRC.
Based on the evidence developed during this investigation, OI:RII did not substantiate that a nuclear maintenance supervisor employed by the TVA willfully signed the RCIC procedure related to the "over-speed test" without verifying that the procedure had been completed, thus submitting incomplete and inaccurate information material to the NRC.
Approved for release by Oscar De Miranda on October 19, 2009