ML092930988

From kanterella
Jump to navigation Jump to search
Comment (30) from T.A. Henderson on Behalf of Firstenergy Corp, on Proposed Rules Pr 50 & 52, Enhancements to Emergency Preparedness Regulations.
ML092930988
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 10/19/2009
From: Henderson T
FirstEnergy Corp, FirstEnergy Nuclear Operating Co
To:
NRC/SECY/RAS
References
74FR23253 00030, PR-50, PR-52, RIN 3150-AI10
Download: ML092930988 (3)


Text

PR 50 and 52 Rulemaking Comments 174FR23253)

From: tahenderson@firstenergycorp.com October 19, 2009 (2:50pm)

Sent: Monday, October 19, 2009 2:24 PM To: Rulemaking Comments OFFICE OF SECRETARY Cc: ghalnon@firstenergycorp.com; mckeeg@firstenergycorp.com; RULEMAKINGS AND rgcollings@firstenergycorp.com; kcmeade@firstenergycorp.com; ADJUDICATIONS STAFF djenkins@firstenergycorp.com

Subject:

Subject:

RIN 3150-AI10: Comments on Enhancements to Emergency Preparedness Regulations FENOC Comments on Enhancements to Emergency Preparedness Regulations

Subject:

RIN 3150-AI10: Comments on Enhancements to Emergency Preparedness Regulations In response to 74 FR 23254, and 74 FR 27724, FirstEnergy Nuclear Operating Company (FENOC) has reviewed the proposed rule, and appreciates the opportunity to provide comments.

1. FENOC fully supports and endorses the comments provided by the Nuclear Energy Institute (NEI) regarding these proposed rule changes.
2. FENOC also submits the following specific comments regarding the proposed rule changes, which provide some emphasis to the NEI comments:

These changes are characterized as enhancements to the current emergency preparedness regulations.

Since the current emergency preparedness regulations are adequate for ensuring adequate protection of public health and safety, and common defense and security (as noted in 74 FR 23524), it is unclear why it should be necessary to impose these additional requirements on licensees. As noted in the NRC's Principles of Good Regulation, regulatory activities should be consistent with the degree of risk reduction they achieve.

Since these changes are characterized as enhancements to an already acceptable regulatory scheme, their imposition on licensees already in compliance with existing regulations appears to represent an unnecessary regulatory burden. It is respectfully suggested that these changes be adapted as a regulatory scheme to be implemented on a voluntary basis by licensees.

On-Shift Multiple Responsibilities: The text of the proposed rule and the associated explanation and other draft guidance do not appear to allow the use of on-shift staff from one unit of a multi-unit site to support emergency response functions of the other unit. For those accidents and threats that affect only a single unit, the regulation should state such cross-unit support is permissible.

Alternative Facilities: The new requirements and associated explanation and guidance for designation of alternate facilities for staging ERO augmentation staff are unclear regarding locations (i.e., "close to the site,"

"geographically separated," "30 miles.. .would be too far away,"

"travel quickly to the site") This guidance should either be eliminated or clarified.

Coordination with Offsite Response Organizations: The proposed text of 10 CFR 50 Appendix E, Section IV.A.7 contains the following statement, "Nuclear power plant licensees shall ensure that offsite response organization resources (e.g., local law enforcement, firefighting, medical assistance) are available to respond to an emergency including a hostile action event at the nuclear power plant site." Licensees can establish mutual aid agreements and create similar arrangements for Offsite Response Organization response, and such arrangements can be evaluated through appropriate exercises.

Requiring that licensees "shall ensure" offsite response organizations are available to respond represents an inappropriate intrusion into offsite response organization oversight and management.

1DS 10

This requirement should be modified to state that "licensees shall ensure that arrangements are in place where offsite response organizations have agreed. to respond to an emergency including a hostile action event at the nuclear power plant site."

Evacuation Time Estimates: A periodic assessment of the population basis for the Evacuation Time Estimate (ETE) is appropriate. Requiring an annual review of population changes is impractical. Absent some type of local government "mini-census," licensees would essentially be required to conduct continuous population change monitoring to determine if the +/- 10 percent threshold has been reached. This requirement should be modified to perform a review at approximately 5 years after the last ETE had been submitted, based on the availability of federal/state/local population estimates.

Should you have any questions or comments, please contact:

Glenn A. McKee FENOC Manager - Fleet Emergency Preparedness Office (330) 761-4412 or Gregory H. Halnon FENOC Director, Fleet Regulatory Affairs Office (330) 384-5638 Todd A.

Henderson Fleet Regulatory Affairs, FENOC Mail Stop: A-GO-2 Phone (Internal): 825-3116 Phone: 330-374-3116 Pager: 440-733-0259 Fax (Internal): 801-5322 Fax: 330-245-5322 The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message.

2

Received: from mail2.nrc.gov (148.184.176.43) by OWMS01 .nrc.gov (148.184.100.43) with Microsoft SMTP Server id 8.1.393.1; Mon, 19 Oct 2009 14:23:54 -0400 X-Ironport-ID: mail2 X-SBRS: 5.3 X-MID: 8189666 X-IronPort-Anti-Spam-Filtered: true X-I ron Port-Anti-Spaim-Result:

ApkBAGNL3ErNhEkqmWdsb2JhbACZXYEyAQEBAQEICwoHE7F/CY1 iAoJMgWME X-IronPort-AV: E=Sophos;i="4.44,586,1249272000";

d="scan'208";a="8189666" Received: from gw22.firstenergycorp.com (HELO firstenergycorp.com)

([205.132.73.42]) by mail2.nrc.gov with ESMTP; 19 Oct 2009 14:23:53 -0400

Subject:

Subject:

RIN 3150-AI10: Comments on Enhancements to Emergency Preparedness Regulations X-KeepSent: E3D3020A:C4BAAF2A-85257654:004A5A73; type=4; name=$KeepSent To: Rulemaking.Comments@nrc.gov CC: ghalnon@firstenergycorp.com, mckeeg@firstenergycorp.com, rgcollings@firstenergycorp.com, kcmeade@firstenergycorp.com, djenkins@firstenergycorp.com X-Mailer: Lotus Notes Release 7.0.3 September 26, 2007 Message-ID:

<OFE3D3020A.C4BAAF2A-ON85257654.004A5A73-85257654.00650E86@FirstEnergyCorp.c om>

From: <tahenderson@firstenergycorp.com>

Date: Mon, 19 Oct 2009 14:23:48 -0400 MIME-Version: 1.0 X-MIMETrack: Serialize by Router on mail06/Servers/FirstEnergy(Release 8.0.2FP2IJune 22, 2009) at 10/19/2009 14:23:48, Itemize by SMTP Server on GW1 4/Servers/FirstEnergy(Release 7.0.3FP1 February 24, 2008) at 10/19/2009 02:23:48 PM, Serialize by Router on GW14/Servers/FirstEnergy(Release 7.0.3FP1 IFebruary 24, 2008) at 10/19/2009 02:23:48 PM, Serialize complete at 10/19/2009 02:23:48 PM Content-Transfer-Encoding: base64 Content-Type: text/plain; charset="UTF-8" Return-Path: tahenderson@firstenergycorp.com